Planning records
Showing 1-50 of 4,508 public recordsPermission for the construction of an all weather playing pitch (size 60 x 30m) (total site area 8,650m2) which will include:-1,035m2 stone carpark, access road and drop off area, perimeter fence of 2.4m metal mesh fence topped by 3.6m of ballstop netting, footpath surrounding the pitch, a 20m long x 5m high concrete hurling wall, 4 number 12m high LED double floodlighting columns for astro pitch, 10 no. 6m high street lighting, advertising banners, all associated site works including civil, electrical, drainage works.
Decommission existing septic tank system and install a new treatment plant and soil polishing filter in its place to serve existing dwellinghouse (as currently being extended under Planning Ref. 20/4005).
Alterations and extensions to an existing dwelling, decommissioning of an existing septic tank, a new connection to the mains foul sewer on the public road and all other associated site works. Permission is further sought for retention of an existing temporary habitable structure (mobile home) on the site which is to be used by the applicant during the course of the proposed works and is to be removed on completion of same.
The demolition of existing derelict cottage and the construction of a residential development of 23 no. units comprising 1 no. 4-bed detached unit, 1 no. 5-bed detached unit, 4 no. 3-bed semi-detached units, 16 no. 4-bed semi-detached units, 1 no. 4-bed storey and a half detached unit, 46 no. car parking spaces, 1 no. new dedicated vehicular entrance, 1 no. new dedicated pedestrian entrance, and all other road, drainage and associated site development works.
Permission for the construction of a dwellinghouse and associated site works.
Permission for construction of a dwelling house and associated site works
Permission to remove an existing biocycle wastewater treatment unit and replace with a new waste water treatment unit and associated site works on their land at Raffeen Sports and Social Club, Ballintaggart & Shanbally Townlands, Ringaskiddy
A single storey extension to the rear and to the side of the existing dwelling, and all associated site work.
Permission for a) demolition and removal of existing dwelling house, b) construction of replacement one-and-a-half-storey dwelling house and single storey garage, and c) for all associated site works, including a new septic tank and percolation area
Permission for retention of an ESB substation and generator in revised position to that permitted as per reg. ref 22/4629
The construction of a two storey value added seafood factory building with R&D and ancillary office accommodation to the first floor, complete with the following (i) signage (ii) car, cycle and motorcycle parking; (iii) internal access roadways, yard area with dock levellers, w.c. and shower facilities, back-up generators, and bunded fuel tanks (iv) fire water storage tank and associated pumps; (v) substation; (vi) security gates and fencing (vii) 1 no. access to the estate road; (viii) underground storm water attenuation, and all associated site development and landscaping works.
Permission for 1 no. Dormer Bungalow.
Permission for 1) The demolition of part section of the existing laboratory and existing carpark spaces, 2) The construction of a new four storey laboratory expansion to the south of the existing site buildings, new entrance canopy and associated site works. Permission for retention is sought to retain an existing single storey modular building to the east of the site for use as a wellness centre. The proposed development is covered by an existing Industrial Emissions Licence no. P0864-01.
The works will include the construction of a new electrical building, emergency back-up electrical power generation, an associated containment bund, screening and associated site development works including minor modifications to internal roads and drainage. The proposed development is covered by an external industrial emissions license no. P0864-01
Permission for the construction of a guardhouse building and associated works, including; canopy, ramp, concrete plaza, local internal access road widening, fencing, external lighting, drainage and footpaths. An existing permitted storage shed will also be kept on site indefinitely (currently subject to permission to demolish as part of planning reference 20/5533). The proposed development is covered by an Industrial Emissions Directive Licence no. P0013-05. As the development refers to a modification to an establishment to which the Major Accident Directive applies, information as specified in the third schedule of the Major Accidents Regulations will be submitted with the application
1. Construction of ground floor extension (kitchen/playroom) at the rear of existing dwelling. 2. Conversion of existing original garage to dining room. 3. Construction of garage/storage shed at the side of existing dwelling. 4. Metal garden shed and timber outhouse for storage at the rear of existing dwelling and all associated site works.
The construction of a bungalow and all associated ancillary site works
A 10 year planning permission for the construction of a contractor’s compound, welfare facilities, an internal access road and associated works. The proposed compound will be built in the area previously occupied by the ADM waste water treatment plant, which is currently being demolished, Planning Ref. 18/6631 relates to this demolition. Part of the aeration basin tank walls which were to be demolished under Planning Ref. 18/6631 will now be retained as part of this proposed development. Enabling works will include the demolition of the former ADM workshop and stores (total floor area = 820m2 with an overall height of 8.12m): Demolition of this building was previously permitted as part of the expired planning application 12/5768, the relocation and grading of site – won material, the removal of 91 trees, protective fencing around trees that are to remain, and some other minor demolitions and alterations. The proposed development will include: A two-storey canteen and meeting rooms building (total floor area = 337m2 with an overall height of 6.45m); a toilet and shower building (total floor area = 202m2 with an overall height of 3.15m); an electrical sub-station ( total floor area = 56m2 with an overall height of 3.15m); a pickling shed (total floor area = 92m2 with an overall height of 4.74m); double-stacked temporary portable contractor cabin (total floor area = 808m2 with an overall height of 4.95m); steel gantry walkways and stairs: a workshop and storage containers area (total floor area = 1290m2 with an overall height of 2.45m); a waste and recycling area for accommodating skips; a laydown area; a new security building (total floor area = 66m2 with an overall height of 3.15m); new internal roads, footpaths and set-down area, relocation of existing car parking spaces and provision of an additional 20 parking spaces, new car park information sign board at the site entrance. The development will include all associated on-site infrastructure. The proposed development is covered by an existing Industrial Emissions Directive Licence No. P0013-04. As the development refers to a modification to an establishment to which the Major Accident Directive applies information as specified in the third schedule of the Major Accident Regulations will be submitted with the application.
Installation of a Solar Photovoltaic (PV) Array (Proposed Area = 2403m2) on the upper level of an existing ground and first floor carpark building, construction of an extension to an existing electrical switch room located under the access ramp to the upper level of the carpark and all ancillary site development works at their production facility. The proposed development is covered by an existing Industrial Emissions Licence No. P0013. As the development refers to a modification to an establishment to which the Major Accident Directive applies, information as specified in the Third Schedule of the Major Accident Regulations will be submitted with the application.
A 10 year planning permission to amend the recently permitted development for the construction of a contractor’s compound, welfare facilities, an internal access road and associated works, Ref: 20/5533. The amendments include adjusting internal access roads and associated works. The proposed amendments include relocating a section of road accessing the permitted contractors compound, construction of associated earth reinforced retaining walls, the working and grading of site-won material, the removal of 88 trees, replacement planting of 90 trees, the erection of protective fencing around trees that are to remain, and some other minor demolitions and alterations. The proposal includes the removal of 3 No. double-stacked temporary portable contractor cabins (total floor area removed = 192m2, overall height of 4.95m) and removal of a section of steel gantry walkways from the previously permitted contractors compound. The development will include all adjustments required to associated on-site infrastructure. The proposed development is covered by an existing Industrial Emissions Directive Licence No. P0013-04. As the development refers to a modification to an establishment to which the Major Accident Directive applies information as specified in the third schedule of the Major Accident Regulations will be submitted with the application.
Construction of 2 no. one storey modular buildings for office use and 2 no. storage containers to the north of the existing Operation Support Group Building including all ancillary site development works at their production facility. The proposed development is covered by an existing Industrial Emissions Licence No. P0013. As the development refers to a modification to an establishment to which the Major Accident Directive applies, information as specified in the Third Schedule of the Major Accident Regulations will be submitted with the application.
A 10 year permission for the construction of a new Clinical Manufacturing Facility (referred to as RCMF) at the existing Pfizer site. The proposed RCMF facility will include (i) a new five storey clinical manufacturing building (c.11,468sqm and maximum height 29.425m) which will include production areas, laboratories, ancillary office space, warehouse, and plant and utility space. The building will be constructed in two sequential phases, Phase 1 comprising c.9,465 sqm and Phase 2 comprising c.2,003sqm; (ii) a single storey warehouse drum store building (c.420sqm and maximum height 13.00m); (iii) an external utility yard comprising; a two storey electrical building (c.94sqm and maximum height 11.70m), an emergency generator with flue stack, 1No. liquid nitrogen tank, 2No. evaporators, 3No. bunded chillers, 2No. bunded receiver tanks, 2No. bunded glycol tanks, a three storey steel frame structure (to a maximum height of 12.91m) to accommodate; dry coolers, heat exchangers and other miscellaneous utility plant and machinery above the utility yard; (iv) an elevated structural steel piperack (c.210m in length and maximum height 9.19m) to provide piped utility services to the new facility, and; (v) all associated site development works, including roads, paths, yards, underground services and landscaping. This application relates to development which comprises an activity which holds an Industrial Emissions Directive Licence (P0013-04). As the development refers to a modification to an establishment to which the Major Accident Directive applies, information as specified in the third schedule of the Major Accident Regulations will be submitted with the application. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared and will be submitted to the Planning Authority with the application.
The development consists of the retention of a temporary 290-space car park, with associated bus turning and set down area, lighting and fencing, The car park will operate for a period of up to 5 years.
The construction of a temporary 290-space car park, with associated bus turning and set-down area, and site lighting. The car park will operate for a period of up to 24 months.
1) The construction of an electrical building, 2) i) amendments to the footprint and elevations of the recently permitted water treatment and electrical building which was granted planning under Planning Ref. 20/05207, ii) the construction of a first floor electrical room extension to this permitted water treatment and electrical building. The proposed development is covered by an existing Industrial Pollution Control License No. P0013-04. As the development refers to a modification to an establishment to which the Major Accident Directive applies, information as specified in the Third Schedule of the Major Accident Regulations will be submitted with the application.
Permission for construction of Bld. 124 - Site Lab Building. This will comprise a new five-storey building (circa 10,881 square metres with a maximum height of circa 30.2m above ground) which will include laboratories, a canteen, ancillary office space and plant and utility space, and associated site development works, including; roads, paths, yards, underground services and landscaping. The proposed development is covered by an existing Industrial Emissions Directive Licence No. P0013-05. As the development refers to a modification to an establishment to which the Major Accident Directive applies, information as specified in the Third Schedule of the Major Accident Regulations will be submitted with the application.
Works involving the replacement of approximately 80m of existing 2.4m high chainlink fence and associated gates with new 2.4m high green palisade security fencing/gates and all associated works at an existing Above Ground Natural Gas Installation.
To construct a new single-storey extension to the rear of the existing dwelling, consisting of a ground floor living room & balcony to serve the first floor master bedroom.
To erect 145m2 of photovoltaic panels on the roof of the existing office with all associates site works.
Retention of alterations to existing commercial unit as follows: i) extension to existing office space at ground and first floor levels (floor area: 139sq.m) via partial change of use of existing warehouse space to office space; ii) provision of ancillary office space to warehouse (floor area: 32sq.m) via partial change of use of existing warehouse space to office space; iii) elevational alterations, including addition of windows/doors at ground and first floor levels to the front (western) elevation and alteration of ground and first floor windows and doors to the side (northern) elevation.
The erection of 1 no. one storey modular building for office use and 1 no. one storey modular building for welfare use in the existing recycle centre compound, 2 no. one storey modular buildings both for office use to the north and 1 no. one storey modular building for office use to the north west of the existing laboratory building and all associated site works at their production facility. The site currently operates under an Industrial Emissions (IE) licence (P0013-04) under part IV of the Environmental Protection Agency Act 1992 (as amended for the Protection of the Environment Act 2003). The new development is on a site to which the Chemical Act (Control of Major Accident Hazards Involving Dangerous Substances) regulations 2015 (S.I. 209 of 2015) applies.
Alterations to dwelling house including a new approach access ramp and steps, elevational changes and associated site works.
Bungalow and all associated site development works - Extension of duration of permission granted under Planning Reference: 16/04297
Retention permission for the demolition of attached side garage and carport to existing bungalow dwelling and replacement of same with side extension, alterations to existing windows and doors including new windows and sliding door. Planning permission is also sought for the removal of existing front deck and replacement with a new balcony complete with handrail and balustrade and all associated site works.
Permission for the installation of solar carports and ground mounted solar PV arrays. The proposed development will consist of single and double row mono-pitch solar carports over existing surface car park areas, solar panels on ground mounted frames, 1 no. single storey low voltage/medium voltage transformer unit, 2 no. spare parts containers, micro inverters, underground electrical ducting and cabling within the development site, integrated lighting for car port areas, and all associated ancillary development works, including ground works and landscaping. Construction and operational access will be via an existing entrance from the R613. The proposed development is for modifications to an establishment to which the Major Accidents Directive applies
(1) permission for retention of the following, (a) modifications to the elevations, (b) the extension of the goods lift to roof level including an external canopy at roof level, (c) the relocation of the firefighting stairs to the west of the existing building including signage on the western elevation, (d) an external access stairs from low level roof to high level roof, (e) additional production floor area of 139.5sq.m at ground floor mezzanine level, (f) additional production floor area of 621sq.m and 2 no. access platforms at second floor mezzanine level, (g) additional production floor area of 46.8 square metres at third floor level and (h) modifications to the location and size of the production stairs on the west & east side of the south side extension. This retention permission relates to the previously permitted New Product Technology Laboratory extension, planning ref. 18/7382. (2) Permission for the following, (a) the construction of a 4-storey production extension at ground floor level to the north & west with a ground floor and second floor mezzanine including a fire escape stairwell at the north west corner of this proposed extension. The proposed extension has a total floor area of 1,736 square metres. (b) additional plant room floor area of 166 square metres at third floor level and (c) the provision of roof mounted plant on the low-level roof area of the New Product Technology Laboratory building. The proposed development is covered by an existing Industrial Emissions Directive Licence no. P0013. As the development refers to a modification to an establishment to which the Major Accident Directives applies, information as specified in the third schedule of the major accident regulations will be submitted with the application.
Permission for the construction of an extension to the existing roof level platform for 1 no. air handling unit and associated ductwork over the existing organic synthesis plant 1. The construction of a roof level platform for 5 no. air handling units and associated plant and ductwork over the existing organic synthesis plant 3 including 2 no. cladded screens at penthouse level, 2 no. cladded screens with louvres at roof level and all ancillary site development works at their production facility. The proposed development is covered by an existing Industrial Emissions Licence No. P0013. As the development refers to a modification to an establishment to which the Major Accident Directive applies, information as specified in the Third Schedule of the Major Accident Regulations will be submitted with the application.
The construction of a 1 storey water treatment & electrical building and a 2 storey electrical room extension to the existing finished goods building at the production facility. The site currently operates under an Industrial Emissions (IE) license (P0013-04) under part IV of the Environmental Protection Agency Act 1992 (as amended for the Protection of the Environment Act, 2003). The new development is on a site to which the Chemical Act (Control of Major Accident Hazards Involving Dangerous Substances) regulations 2015 (S.I. 209 of 2015) applies.
Retention of (a) sun room and entrance porch extension to front of dwellinghouse (b) utility room extension to rear of dwellinghouse (c) detached garden shed structure adjacent to south-western gable wall of dwellinghouse and (d) detached ancillary single-storey granny flat structure to rear of dwellinghouse together with all associated alterations and site works.
Permission for modifications to our existing dwelling house, namely: i) construction of a single storey extension to the side (east) elevation, ii) construction of a single storey extension to the rear (north) elevation, iii) insert 2 no. velux roof lights on the existing front roof, iv) revisions to some of the existing opes - their size and locations on the front and rear elevation of existing dwelling, so as to suit new internal room layouts, v) removal of both chimney stacks and vi) insert a canopy roof overhang on front (south) elevation over new external front slider door ope.
Permission for retention for the existing single storey kitchen extension (17m2) located at the rear elevation (north) of existing dwelling house.
The construction of an extension to existing dwelling house, new site entrance and parking area, and all associated works.
The construction of an extension to existing dwellinghouse and all associated works.
Permission for the construction of a single storey electrical building and all ancillary site development works at their production facility. The proposed development is covered by an existing Industrial Emissions Directive Licence No. P0013-06. As the development refers to a modification to an establishment to which the Major Accident Directive applies, information as specified in the Third Schedule of the Major Accident Regulations will be submitted with the application.
Permission for retention of the following alterations to an existing dwelling; 1) ground floor side and rear extension with adjoining canopy, 2) conversion of attic to storage space with rooflights, and the construction of a detached garage with adjoining carport and store
Permission for the retention of (a) ground floor extensions and external alterations to the front, rear and side elevations of our existing bungalow and (b) garage structure attached to the rear of the dwellinghouse, together with all associated site works.
1)Full planning permission for the construction of new dwellinghouse, new domestic garage, new double entrance off public laneway. 2) Permission for the retention of existing mobile home on a temporary basis, together with all other ancillary site works.
(i) Retention of the existing boundary wall measuring between 1.20 metres to 1.30 metres in height adjacent to the southern site boundary of the residence, running parallel to the existing access lane to the south; (ii) retention of the existing retaining wall measuring approximately 2.50 metres in height, located within the south-western portion of the subject land-holding which encloses the existing storage area; and (iii) all associated site works.
A 10 MW solar farm comprising approximately 44,400 photovoltaic panels on ground mounted frames within a site area of 25.8 hectares, 4 no. single storey inverter/transformer stations, 2 no. single storey delivery stations, security fencing, CCTV, and all associated ancillary development works. Extension of Duration to Permission granted under Pl.Reg.No. 17/6351.
Modification to the solar farm permitted under planning reg no. 17/6351. The modification consist of changes to the dimensions of the permitted photovoltaic panels, replacement of the 4 transformers stations with 4 smaller stations and 1 smaller storage unit, replacement of the 2 delivery stations with one larger delivery station, change to the permitted fencing type associated layout changes. All modifications are within the boundary of the permitted development