Planning records
Showing 1-50 of 29,557 public recordsFor the construction of a single 2 storey 3 bedroom detached dwelling with storage in the attic space along with the relocation of existing storage sheds, new boundary treatment, access road, water treatment system, removal of existing posts and nets onto existing golf course and all other ancillary site development works.
Permission for the construction of a new five bed detached, two storey dwelling (214sq. M), a new vehicular / pedestrian access, with a new dished kerb and all associated drainage / ancillary site works.
Retention Planning Permission for 1. Detached single storey garage conversion to study/playroom to front, 2. Detached single storey timber cabin consisting of office room/Music room to rear garden, 3. Single storey timber cabin consisting of Gym/Games room/Storage and garden room, 4. Single storey detached bike shed to rear garden all with associated ancillary works.
Residential development on a site of c.1.7 hectares at Hollystown, Dublin 15. The site is within the curtilage of Hollywoodrath House, Hollywood, Hollystown, Dublin 15 (Protected structure RPS 0665). The proposed development comprises the following: Construction of 52 no. residential units consisting of 30 no. houses ranging in height from 2 no. to 3 no. storeys (1 no. one-bed unit, 6 no, two-bed units, 21 no. three-bed units and 2 no, four-bed units) and 22 no. apartment/duplex units (2 no. one-bed units, 11 no. two-bed units and 9 no three-bed units) within 3 no. blocks at 3 no. storeys (c. 12 m). All units include the provision of a private rear garden, balcony or terrace; Refurbishment of an existing former barracks building on site as a one-bed house unit with a gross floor area of c.47 sq. m. Provision of communal and public open space and children's play area; Provision of 81 no. carparking spaces and 65 no. bicycle parking spaces. Provision of wastewater pumping station and surface water attenuation system; New hard and soft landscaping and boundary treatment to all boundaries and new internal road layout including pedestrian footpaths, demolition of existing garden wall associated with the existing building on site, provision of new vehicular entrance located off the R121 road along the eastern boundary, provision of pedestrian entrances off the Ratoath Road along the southern boundary, surface water SuDS techniques, surface water connection to adjoining lands to the west, provision of green roof and all associated site development works necessary to facilitate the development.
A single storey pitched roof extension to the existing detached garage to provide a 'work from home' office space with garage and associated site works.
The development will consist of the conversion of the attic into habitable accommodation, a two-storey rear extension including attic-level accommodation with a flat-roof dormer, a two-storey side extension, and the installation of new window and dormer windows to the western side of the property, together with all associated site works.
The development consists of amendments to permitted Reg Ref FW24A/0471E. The amendments consist of the change of house type from a A3, 3-bed two storey house, to a A4, 4-bed two storey house.
Permission to erect a new 5.2m x 1.85m x 2.8m stainless steel and glass bus shelter with 2 No. internally illuminated advertising panels of 2 Sq. m each (4Sq.m total) located on public footpath at Bus Stop no. 7560,opposite 3 Hollywoodrath Drive, Hollywoodrath, Dublin 15, along with all associated site works. AI received 23/09/2024
The development shall consist of a single storey extension to the rear of the existing semi-detached dwelling and all associated site works.
Planning permission for a single storey rear extension and alterations to existing two storey dwelling including the subdivision of existing house at ground floor level to create a self contained one bedroom living unit and all associated site works at 18 Hollywoodrath, Hollystown, Dublin 15. AI Rcvd 03/10/2023
Planning permission is sought for a development that will consist of the construction of 86 no. dwellings (9 no. 2-bedroom 2-storey terraced dwellings; 50 no. 3-bedroom 2- and 2.5-storey terraced, semi-detached, and detached dwellings, and 27 no. 4-bedroom 2-storey semi-detached and detached dwellings) and a 2- storey detached creche, with 188 car parking spaces (including 9 no. spaces for creche staff and drop-off area, and 179 no. spaces for residential use including 2 no. visitor spaces) including accessible parking and EV charging, and 1 no. motorbike parking space, with bicycle parking spaces provided within the curtilage of each unit and bicycle parking provided for the creche. The proposed development will provide for public open space, landscaping and boundary treatments; public lighting; bin and cycle storage; ESB substation; foul drainage works along Ratoath Road together with all associated site infrastructure and engineering works necessary to facilitate the development, including the diversion of an existing surface water pipe within the site, to now run along the site's eastern and southern boundaries. Vehicular and pedestrian access is proposed via Gallanstown Road, including 2 no. new pedestrian crossings, at Ratoath Road, along with new traffic calming measures along Ratoath Road. The proposed development also provides for a new bus turning area along Ratoath Road. AI Received 21/03/2025
Planning Permission for a residential development of lands at Ratoath Road and Gallanstown Road, Hollystown, Dublin 15. The site is within the curtilage of Hollywoodrath House ( a protected Structure). The proposed development will consist of the construction of 96 no. dwellings (9 no. 2-bedroom, 2 storey terraced dwellings; 60 no. 3-bedroom, 2- and-2.5 storey, terraced and semi-detached dwellings; 27 no. 4-bedroom, two-storey, semi-detached and detached dwellings) with 192 no. car parking spaces and 62 no. bicycle parking spaces. The proposed development will provide public open space, landscaping, trees, and boundary treatments; public lighting; bin and cycle storage; ESB substation; foul drainage works along Ratoath Road together with all associated site infrastructure and engineering works necessary to facilitate the development. Vehicular and pedestrian access is proposed via Gallanstown Road together with pedestrian access, including 2 no. new pedestrian crossings, at Ratoath Road. AI rcvd 06/10/23 SAI received 12/10/23
Permission is sought for the construction of
The development will consist of of 4 No. ground floor shops, a remote work hub, a stand-alone café with outdoor seated dining area and 17 No. residential units across 4 individual blocks ranging from one to three storeys on a site measuring circa 0.53 Hectares and comprising; (i) Block A: 2 storey block of 2 No. two bed and 3 No. 1 bed apartments over 4 No. ground floor shops, (ii) Block B: 3 storey block of 4 No. 2-storey 3-bedroom duplex units over a ground floor remote work hub, (iii) Block C: 3 storey block of 4 No. 2-storey 3-bedroom duplex units over 4 No. ground level 2 bedroom apartments, (iv) Block D: single storey standalone pavilion style café with outdoor seated dining area, (v) Ancillary bicycle storage, refuse storage and ESB substation in 3 individual single storey buildings, (vi) provision of 46 No. car parking spaces, 82 No. bicycle parking spaces and 2 No. motorcycle parking spaces, (vii) an area of public open space, including a children’s play area, (viii) relocation of an existing vehicular and pedestrian entrance off the Ratoath Road to the Northern end of the site frontage (ix) alterations to the existing boundaries and all associated site development works including hard and soft landscaping, service connections and drainage works including connections to the existing public foul and surface water systems in the Ratoath Road. AI received 17/6/2022
We, Glenveagh Homes Ltd, intend to apply for planning permission for development at this site of c.7.71 ha at Hollywoodrath Road (R121) in Hollystown Dublin 15. The site is bound by the R121 to the south and east with emerging residential areas of Hollywoodrath beyond the R121; existing residential areas of Redwood and The Oaks to the north and east; and the remaining former Hollystown Golf Course Lands to the west. The proposed development will consist of: 69 no. houses comprising 52 no. 2-storey houses and 17 no. 3-storey houses (13 no. 2-bed units, 39 no. 3-bed units, 17 no. 4-bed units), private open spaces (including terraces at first and second floor level), carports incorporated into the footprint of each dwelling (providing 125 no, parking spaces) that also accommodate bike storage (138 no. cycle spaces) and refuse storage, and all associated roads, services, visitor parking (13 no. car spaces and 8 no. cycle spaces), public open spaces (Class 2), changes in level, hard and soft landscaping and boundary treatments where required on a residential area of c.1.94 ha. The proposed development also includes: 1. The construction of a new foul outfall sewer (c.0.97 ha), approx. 3km in length to connect to the existing 600mm diameter foul sewer to the south of Powerstown Road which will include decommissioning of the existing Pump House south of Hollystown Park. 2. The construction of a new vehicular entrance off Hollywoodrath Road (R121), a new footpath and cycle path along the northern and western side of the R121 along the site frontage extending south to the existing Toucan crossing facility over the R121, and provision of 2 no. new Toucan crossings on the R121 (c.0.53 ha). 3. The development of proposed (Class 1) public open space including walking routes, seating areas, kick about area, playground, dog park, associated landscaping works including planting, changes in level and boundary treatments, and 10 no, public cycle parking spaces (c.3.5 ha). 4. The development of ancillary landscaped areas and sustainable urban drainage systems under the existing ESB powerlines (c.0.77 ha), and all associated ancillary site development infrastructure including: ESB sub-station, public lighting, and foul and surface water drainage; internal roads & footpaths; and all associated engineering and site works necessary to facilitate the development.
The development consists of amendments to permitted Reg Ref FW24A/0471E. The amendments consist of: 1) the change of 4no. house types from A1/A2 type, 3-bed two storey houses, to B1/B2 type, 4-bed two storey houses. 2) the omission of 1no. 4-bed two storey house type E, replaced with 2no. 4-bed two storey houses type B1/B2 and associated road layout, parking layout revision. Additional Information Received 23/02/2026 Significant Additional Information Received 12/03/2026
The development consists of amendments to permitted Reg Ref W24A/0471E. The amendments consist of, 1) revised design of detached two storey creche with a new floor area of 196.6sq.m (previously 341sq.m) and associated internal layout, play area, elevational, parking, bicycle layout and bin store updates. 2) the addition of 2no. three storey houses, Type C1 adjacent to the creche. 3) Change of house type from a C2, three storey house to a C1, three storey house. 4) Road layout revision at Hollywood Close to create a homezone with associated car parking updates and all ancillary site development works. Additional Information Received 17/02/2026 Significant Additional Information Received 27/02/2026
Permission for conversion of existing attic into a habitable space, to include new bedroom and en-suite and the construction of a single storey unit at the end of rear garden to include new garage/store and home office and all associated wite works.
Retention Planning Permission for single storey cabin to rear garden, single storey pergola outdoor room and 1.8m high fencing to divide garden.
Planning permission for alterations to the residental scheme permitted under Reg. Ref FW14A/0108, as amended by Reg. Ref: FW16A/0099 Reg. Ref FW16A/0148, Reg. Ref: fw17a/0016 and Reg. Ref FW18A/0132 (as extended) on site at Hollywoodrath, Hollystown, Dublin 15. The site is located on the southern side of the junction of the Ratoath Road and the R121 ( Church Road) and to the north of the M2/N3 link road. The proposed alterations relate to permitted House No's 3-8 and 9-14 Hollywoodrath Meadows (located in the eastern section of the site, i.e. Phase 3) and consist of the following: Alterations to permitted House No's 3-8 and 9-14 Hollywoodrath Meadows to provide for a change of house type from 11 no. House Type G2 and 1 no. House Type G2 (i) (both 2 storey end terrace / terrace, 3 - bedroom houses) to 11 no House Type B8B and 1 no. House Type B3B (2 storey end-terrace/ terrace, 3-bedroom houses). The alterations result in the creation of four terrace block 3 units each. The proposal includes associated sitting, boundary changes, boundary treatment and infrastructural works within the area of the proposed alterations.
The development will consist of an increase in the maximum number of children to be accommodated in the existing Creche from 50 at any one time ( as conditioned within Condition No. 4 of the Grant of Planning Permission made under Planning Register Reference Number F07A/1454) to 77 Children and, the construction of a bicycle shelter to accommodate ten bicycles. Additional information received 10/11/25 Significant Additional Information received 28/11/2025
Second floor attic conversion to habitable space, to facilitate bedroom, ensuite and dressing room. Conversion to include two new rooflights on the front elevation, four new rooflights on the rear elevation, one new window on the second floor left side westerly elevation and two windows on the second floor right side easterly elevation.
The development will consist of 1. Construction of a new single storey flat roof side and rear extension to consist of a living room and study. 2. General remodel and upgrade of the main dwelling to suit the proposed layouts. 3. All drainage, structural and associated site works to be implemented.
The development will consist of: Retention of single-storey, flat-roof extension to the side of the existing dwelling. Additional Information Received 11/02/2026
Construction of a 34 sq/m extension,
1) Single storey domestic garage to gable end and rear of house. 2) Single storey extension to rear of house as addition to existing single storey extension.
Permission for ground floor extension to the side and rear of existing house for purposes of sessional use as a Montessori pre-school.
The development will consist of a 24 classroom Primary School extending to 2 storeys in height, with a Gross Floor Area of c. 4.232sq.m. The proposal primary school will also incorporate a 2 classroom special educational needs unit in addition to all ancillary pupil and teacher facilities including external hard and soft play areas and 2 no. ballcourts. The proposed building will incorporate photovoltaic panels on roofs with a bio mass heating unit also proposed. Vehicular access to the development is provided via a new access off Hollywoodrath Avenue along the northern site boundary. Bicycle parking, car parking and bus set down areas are provided within the site boundaries. A separate pedestrian/cyclist access is also proposed off Hollywoodrath Avenue, with a second pedestrian access proposed along the southern site boundary off Bay Meadows Avenue, also known as The Avenue. A new pedestrian crossing on Bay Meadows Avenue also forms part of the proposed development works. A non-vehicular access to the school, for use by emergency services only, is also provided along the southern site boundary. The proposed development also provides for an ESB sub-station in addition to all associated site development works including alterations to ground levels, on-site external lighting, landscaping and boundary treatment.
A ground floor extension to the side and rear of existing house for purposes of sessional use as a montessori pre-school.
Permission for retention of an attic conversion including two dormer windows to the front elevation and roof extension with windows to the rear elevation of the original bungalow and two single storey extensions to the rear, with a total additional area of 143 sq.m to the Dormer Bungalow.
Conversion of existing second floor attic into a habitable space, to facilitate two new bedrooms and ensuite. Works will include alterations to existing first floor layout to facilitate new access stair and the installation of four new roof lights to the front elevation, six new roof lights to the rear elevation and one new window to the gable elevation. It is also proposed to widen the existing single gate to the side of the property to incorporate a new double gate and all associated site works.
Planning permission sought for attic conversion to include two each roof windows to front and rear with relocated solar panels.
Planning permission for conversion of existing attic space comprising of modification of existing roof structure, new gable window, new access stairs and 2 no. roof windows to the front.
Planning permission is sought for single storey building to rear garden, new building to have games room facility and home office/study room and all associated site works.
To view details of this application please visit www.hollystown2shd.ie Submissions/observations to An Bord Pleanala, 64 Marlborough Street, Dublin 1 or online at www.pleanala.ie ABP 312271 A 10 year planning permission for a strategic housing development at a site of c. 25.3 ha at the townlands of Hollystown, Kilmartin, Hollywoodrath, Cruiserath, Yellow Walls, Powerstown, and Tyrrelstown, Dublin 15, which includes lands in the former Hollystown Golf Course and lands identified under the Kilmartin Local Area Plan 2013 (as extended). The lands are bound by the R121 and Hollywoodrath residential development to the east, the under construction Bellingsmore residential development to the south and north, the former Hollystown Golf Course to the north, Tyrrelstown Educate Together National School, St.Luke's National School and Tyrrelstown Community Centre to the west and south and the existing Tyrrelstown Local Centre to the south. The proposed development will consist of the development of 548 no. residential units, consisting of 147 apartments/duplexes and 401 houses, ranging in height from 2 to 5 storeys and including retail/café unit, 2 no. crèches, 1 no. Montessori, 1 no. community hub, car and bicycle parking, open space and public realm, over a site area of c. 25.3 ha, as follows: 1. On lands to the north of the application site (referred to as Sites 2 & 3) the proposed development includes for 428 no. houses and apartments comprising 27 No. 1-bed apartments, 97 No. 2-bed houses, 267 No. 3-bed houses and 37 No. 4-bed houses set out in 401 no. houses (373 no. 2-storey and 28 no. 3-storey) and 9 no. 3-storey apartment buildings (27 no.). A total of 792 no. car parking spaces will be provided for this part of the scheme, of these, 761 no. spaces will be provided for residents with 30 no. spaces provided as visitor parking and 1 no. space for disabled parking. In terms of bicycle parking, a total of 225 no. cycle parking spaces are provided, comprising 180 no. spaces for terraced units (located in 9 no. bike stores with 20 no. bikes in each) plus 45 no. spaces for the apartments. 2. On lands to the south of the application site and north of the Tyrrelstown Local Centre (referred to as Local Centre) the proposed development includes 120 no. apartment/duplex units in 4 no. blocks ranging in height from 3 to 5 storeys (32 no. 1 bedroom, 68 no. 2 bedroom and 20 no. 3 bedroom) all of which have balconies or terraces set out as follows: • Block A, is a 4 storey building, providing 12 no. units with proposed balconies, with a café/retail unit of 154sq.m and community hub of 144.5 sq.m proposed at ground floor. • Block B, is a 3-5 storey building, providing 34 no. units with proposed balconies and ground floor terraces. • Block C, is a 3-5 storey building, providing 44 no. units with proposed balconies and ground floor terraces. • Block D, is a 4 storey building, providing 30 no. units with proposed balconies and ground floor terraces, with a crèche of 500 sq.m with an external play space of 200 sq.m and a Montessori of 280.3 sq.m with an external play space of 185 sq.m proposed at ground floor. • External communal amenity space is provided at ground podiumterrace levels throughout the scheme. • A standalone 2-storey crèche unit is also provided of 529.6 sq.m with an external play space of 243 sq.m, to the south of the site. • Car Parking is provided in a mix of undercroft in Blocks B & C and at surface level with 108 spaces for residential use and 5 no. creche/Montessori staff spaces, 10 no. creche/Montessori set down spaces, 6 no. visitor spaces and 9 no. public spaces on the Link Street. A total of 300 no. bicycle parking spaces are proposed as part of the development comprising 230 no. long stay spaces for residents and 70 no. short stay spaces for both visitors and the non-residential activity. 3. Vehicular access to Sites 2 & 3 to the north of the application site is through the construction of a new vehicular entrance off Hollywoodrath Road (R121), a new footpath and cycle path along the northern and western side of the R121 along the site frontage extending south to the existing Toucan crossing facility over the R121, and provision of 2 no. new Toucan crossings on the R121 (c.0.53 ha) as well as via an extension to Hollystown Avenue link road south of the permitted Bellingsmore development. Vehicular access to the Local Centre to the south of the application site is via the existing access point along Hollystown Avenue and the north-south link route from the existing Tyrrelstown Local Centre which is partially completed and partially under construction. Pedestrian and cycle access is also provided along the R121, through existing roads within the application site and through the creation of a new pedestrian/cycle route to the north at the existing entrance to the clubhouse of the former Hollystown Golf Course. 4. The development of proposed Class 1 public open space of 2.77ha and Class 2 public open space of 1.69ha including pedestrian/cycle routes, seating areas, kick about area, playgrounds, dog park, associated landscaping works including planting, changes in level and boundary treatments. In addition 3.21 ha of linear park under the existing power lines and 2.11ha of ancillary linear open space which includes for SUDS and hedgerow features is provided in the scheme. The proposed Class 1 open space is provided as a north south pedestrian and cycle connection to the north an connecting the site to the Ratoath Road and the future Dublin GAA facilitites at this location. 5. The construction of a new foul outfall sewer, approx. 3km in length to connect to the existing 600mm diameter foul sewer to the south of Powerstown Road which will include decommissioning of the existing Pump House south of Hollystown Park. 6. The development will also provide for all associated ancillary site development infrastructure including landscaped areas and sustainable urban drainage systems under the existing ESB powerlines, and all associated ancillary site development infrastructure including: demolition of an existing shed, ESB sub-stations, public lighting, and foul and surface water drainage; internal roads & footpaths; landscaping; and all associated engineering and site works necessary to facilitate the development. The proposed scheme is designed to integrate with the previously permitted development at Bellinsgmore (Ref FW13A/0088/E1) which is currently under construction and recently permitted residential development on lands to the north east known as Site 1 (FCC Reg. Ref.: FW21A/0042). The application contains a statement setting out how the proposal will be consistent with the objectives of the Fingal County Development Plan 2017-2023 and the Kilmartin Local Area Plan 2013 (as extended). The application contains a statement indicating why permission should be granted for the proposed development, having regard to a consideration specified in section 37(2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development materially contravenes the Fingal County Development Plan 2017-2023 and the Kilmartin Local Area Plan 2013 (as extended), other than in relation to the zoning of the land. An Environmental Impact Assessment Report has been prepared in respect of the proposed development. The application, together with an Environmental Impact Assessment Report, may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy, during public opening hours at the offices of An Bord Pleanála and Fingal County Council. The application may also be inspected online at the following website set up by the applicant: www.hollystown2shd.ie
Retention Planning Permission for a single storey side extension with alterations to existing building.
A 10 Year PERMISSION for development of a site of c 9.3ha in the townlands of Hollystown and Yellow Walls on part of the former Hollystown Golf Course lands, Ratoath Road, Hollystown, Dublin 15, D15 C6258. The development will consist of a GAA Cluster Facility including: a) 4 no. floodlit GAA pitches (Pitches No’s 1 to 4) comprising; 1 x synthetic all weather pitch (Pitch No. 2) (145m x 90m with floodlights with a lux level of 350 mounted on 8 no. 20 metre high columns); 2 x sand-based grass pitches (Pitch No’s 3 and 4) (145m x 90m with floodlights with a lux level of 350 mounted on 8 no. 20 metre high columns per pitch);1 x sand-based grass pitch (Pitch No. 1) (145m x 90m with floodlights with a lux level of 500 mounted on 8 no. 30 metre high columns). All pitches will have GAA goal posts and ball stop netting (12m in height and 30m in length) to rear of same, scoreboards and 2 dugouts each, a railing around the perimeter of each of the sand-based pitches and 2.5m sports fencing around the perimeter of the all-weather pitch. The development will also consist of b) the renovation and alteration of the former 2 storey clubhouse (existing area: 678m2) with the alteration of the existing bar area to 2 no. team changing rooms and alteration of existing changing room layouts with new external door access, officials changing room, showers and toilets on the ground floor, retention of existing kitchen facilities, re-purposing of first floor to offices, storage space and team meeting space/multi-purpose room, including removal of external stairs. c) Development of new two-storey extension (area:1,276m2, height: 10.06m) to provide 6 no. team changing rooms, showers and toilets, baths and physio rooms, plant room and toilets for spectators, all on ground floor. Gymnasium, storerooms, office and physio space and team meeting space/multi-purpose room on first floor. New access stairs and lift as well as terrace and green roof and pv solar roof panels. d) the provision of a separate Indoor Training Facility (area: 820m2, height: 7.25m) including a 30m x 20m pitch, team tactics space, toilets, plant room and store for equipment. e) the construction of a Spectator Stand to the east of Pitch No.1 (area: 296m2, height: 7m) to accommodate 500 spectators with partial roof/cover and undercroft equipment store. f) Hurling wall (9m x 9.5m and 5m in height) with fenced in floodlit astro-turf hurling practice area. g) Maintenance and storage building (area: 128m2, height: 4.3m). h) Demolition of existing driving range and pro-shop shed (area: 72m2). In addition the development will include i) a walking/jogging trail with outdoor exercise equipment around perimeter of site, an outdoor training area (30m x 20m) and 100m long speed training area, a new access roadway and pedestrian entrance onto Ratoath Road, 3 no. pedestrian/cycle access gates to adjacent lands to south-east. Car Parking for 54 no. standard car parking spaces, 9 no. universal access spaces and 100 no. overflow spaces for intermittent use with a grasscrete finish, 2 no. coach spaces and bicycle stands for the parking of 100 no. bicycles. j) Earthworks drainage infrastructure and attenuation, an ESB substation (area: 42m2) and switch room, retaining structures, signage, landscaping and all other associated site development works above and below ground level. AI Received 24/10/2022
Planning permission to construct a two storey extension to the rear north eastern side of the existing property consisting of ground floor kitchen/first floor bedroom & replace utility window with a side entrance door, new first floor window at the north western side & associated site works. AI received 7/6/2023
Permission has been requested to convert the garden into a combination of storage space, an enclosed pergola, and a smaller garden.
The proposed development will conist of
The development will consist of: the provision of 12 no. logistics/warehouse buildings (c. 159,924 sq.m) as follows: Building X1 (c. 6,364 sq.m and a height of c. 17.06m), Building X2 (c. 8,072 sq.m and a height of c. 17.06m), Building X3 (c. 4,896 sq.m and a height of c. 17.06m), Building X4 (c. 42,490 sq.m and a height of c. 17.63m), Building X5 (c. 23, 102 sq.m and a height of c. 17.25m), Building X6 (c. 8,843.3 sq.m and a height of c. 17.25m), Building X7 (c. 6,339.5 sq.m and a height of c. 17.63m), Building X8 (c. 8,010.7 sq.m and a height of c. 17.25m), Building X9 (c. 10,684.2 sq.m and a height of c. 17.25m), Building X10 (C. 13,041.5 sq.m and a height of c. 17.25m), Building X11 (c.13,042.4 sq.m and a height of c. 17.25m), Building X12 (c. 15,038.4 sq.m and a height of c. 17.25m), each building will include an attached 2 to 3-storey ancillary office building ranging in height c. 8.35m to 12.10m; associated yard areas, trailer and truck parking, and car and bicycle parking spaces at surface level; ancillary facilities to include a campus management/community building (c. 689 sq.m) with associated outdoor sports/amenity space, a retail/café unit (c. 45 sq.m) and 12 no. substations (c. 604 sq.m combined); internal pedestrian, bicycle and vehicular circulation roads, lanes and pathways, with primary access via the existing roundabout at Cherryhound-Tyrrelstown M2-M3 Link Road and secondary emergency access via R121; new pedestrian/bicycle links to adjoining lands, including the provision of a pedestrian crossing and bus shelter at Hollywoodrath Drive, and pedestrian/bicycle links to Hollywoodrath Drive, the R121 and lands to the northeast; associated landscaping, public open space, boundary treatments, lighting, signage and CCTV; associated drainage, attenuation and service connections; and all associated temporary construction compounds and site works. An Environmental Impact Assessment Report accompanies the planning application. AI rcvd 31/10/2023 SAI rcvd 07/11/2023
Construction of a single storey extension to the rear and side of existing dwelling and a single storey porch to the front of the existing dwelling. The development will consist of a new porch, new playroom and home office and other minor alterations to existing internal layout together with all associated site works. AI received 17/10/2022
Permission for the decarbonization by erecting a new single storey, free-standing energy centre, comprising biomass fuel store and enclosed plant room with flue, together measuring 70 sqm in area, and three open-air liquid petroleum gas tanks in a fenced enclosure; installing cowls on elevations of existing school to enable operation of new internal heat recovery units; replacing the existing windows to Tyrrelstown Community Centre and Tyrrelstown Educate Together National School, and the external doors to all existing buildings, with ones matching in appearance but improved in performance; fitting photovoltaic array on the roofs of the existing buildings, relocating two existing open-air bicycle shelters and erecting two new ones in front of Tyrrelstown Educate Together National School; and constructing a new metal fence to protect the existing soft landscaping along part of the western boundary of the site. The project will be carried out in conjunction with remediation of the existing buildings on the site. AI Rcvd 02/05/24
Proposed extension of playground area to include revised boundary realignment and new vehicular access. Additional Information Lodged on 14th Jan 2020
Development comprising erection of 1 no. single storey ancillary garden room area (34m2 nett internal approx) 40m2 gross approx to including associated site works in rear garden (area 134m2 & overall site of area 323m2 0.032ha).
Construction of a single storey garage/shed (50m2) to rear of existing house, with amended side entrance and ancillary site works,
New ground floor extension to rear/side with internal modifications and associated site works.
The diversion of an existing watercourse, (Powerstown Stream) into an existing drainage channel located adjacent to the north, west and east boundaries of the site. The diverted watercourse will incorporate the provision of a riparian zone (approx. 18-26 metres in width) and a series of swales and ponds. The proposed development will also comprise the provision of 3 No. pedestrian/cyclist bridges on the north, west and east site boundaries; hard and soft landscaping; boundary treatments; signage; changes in levels; and all associated site development works. The proposed development will enable the future development of the subject site. AI received 26/01/23
Retention development will consist of vehicular entrance to the side/front of the site. A partial flat roof single storey extension connecting the existing dwelling to the game's room/art studio. Retention for single storey extension to the side connecting with partial flat roof single storey to existing house. Moving the existing entrance door into the retention works. Retention for single storey detached office to the side of the existing house. Planning permission will consist of a proposed new dormer roof to the front of the existing dwelling roof to bring more natural light into the kitchen/living area. A new stone cladding finish to the side elevations of the dwelling matching in with neighbouring stone finishes and all ancillary works.
Permission for proposed two attached garages to side of two dwelling houses with associated site development works.