Planning records

Showing 1-2 of 2 public records
PreviousPage 1 of 1Next
FW24A/0178E

The subject site currently has planning permission for 4 no. buildings which are under construction. Units 3, 4 and 5 were granted under Reg. Ref. FW20A /0211 and Unit 6 was granted under FW22A/0068. All units are under construction with units 3, 4 and 5 substantially completed Retention permission is sought for: • Omission of green roof to offices (Units 3 & 4) • Upgrade of Marshalling Yard Oil Interceptor from Bypass to Full Retention Separator (Units 3 & 4) • Landscape works (ground profiling) to Unit 3 • Omission of 1no. grade level access door on Unit 3 North-West Elevation • 9sqm of precast concrete wall has been replaced with curtain walling on the Unit 5 Office North-West Elevation • Hall parapet heights for Units 3,4,5,6 are 235mm lower than Hall parapet heights shown on the 'Permitted including compliance' Elevations Permission is sought for: • Reduction in size of swale adjacent to Unit 3 and relocation of western swale northwards (unit 6) • Amendment of car parking layout to the Unit 4 carpark (reduced from 64 to 63) and Unit 5 (reduced from 58 to 57) • Omission of green roof to offices (units 5 and 6) • Upgrade of Marshalling Yard Oil Interceptor from Bypass to Full Retention Separator (unit 5) • The Vertical feature trims on unit 3, 4, 5 and 6 elevations are omitted • All associated site works. AI Rcvd 08/11/2024

Vantage Business Park, Coldwinters, St. Margarets, Co DublinFingal County CouncilPermission and Retention0 reasons0 conditions
Granted25 November 2024
FW22A/0068

The development will consist of 1 no. building for warehouse/logistics use, to be known as Unit 6, with a gross floor area of 9,821 sq.m. The building will measure 18.1m high (at parapet level) and have 2 storey ancillary offices. Elevational signage will be provided. The unit will form part of Phase 2 of Vantage Business Park along with Units 3, 4 and 5 (permitted under reference FW20A/0211), Phase 1 to the south consists of Unit 1 under construction and Unit 2 complete in 2019. The proposed development includes 6 no. HGV parking spaces, 82 no. car parking spaces, 58 no. cycle parking spaces, 8 no. dock levellers and 2 no. grade loading bays. All associated siteworks including diversion of existing foul rising main, boundary treatments, landscaping, service yards, internal road and footpaths, dry detention basins/swales, lighting, 1 no. free standing sign, security and access control room, signage at entrance, refuse storage, heat pumps and all associated siteworks including drainage infrastructure.

Lands between the N2 and R135, Coldwinters, St. Margarets, Co. Dublin.Fingal County CouncilPermission0 reasons0 conditions
Granted03 June 2022
Showing 1-2 of 2