Applications tied to the site
Partial coverage9 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
9 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 755 decisions within 5 km, 9 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
9 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
9 matched1 of 2 layers are loaded for Cork County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matched2 current citations from the Cork County Council development plan, each with section, page and source URL.
2 matched3 of 4 layers are loaded for Cork County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Citations are current-dated and carry policy name, section, page and source URL from the Cork County Council development plan.
2 matchedOpen preview
Open preview
Construction of 13 no. warehouse/light industrial units in 3 no. buildings with ancillary two storey offices internally and associated site works (part of previous permitted development under planning reg no. 06/6741 and extension of permission Reg No. 11/5459)
Retention of change of use of light industrial unit to personal training gym.
Permission to develop a container storage facility with containers varying in sizes from 20 feet to 40 feet in length, container with toilet/ office facilities connected to existing services on site, 3 m high paladin security fencing around perimeter and all associated site works
Development comprising the subdivision of the existing Retail Building A (2,755.5 sq m Gross Floor Space) to facilitate 2 no. Retail Units (Unit A1 and Unit A2 respectively) through the construction of an internal subdivision wall and the change of use of new Unit A2 from Showroom and Sales Area/Retail Warehousing/Warehousing to Vehicle Sales and Leasing Outlet with Vehicle Servicing/Maintenance Garage (1,373.6 sq m) with ancillary infrastructure and associated site development works (all totalling 2,815.1 sq m Gross Floor Space), at this site of approximately 0.49 hectares located at the existing Retail Building A, Cobh Cross Industrial Estate (also known as Fota Junction Retail Park) in the Townland of Killacloyne, Cobh Cross, Carrigtwohill, Co. Cork. The proposed development will consist of: The construction of an internal dividing wall within existing Retail Building A to facilitate 2 no. Retail Units (Unit A1 of 1,373.6 sq m and Unit A2 of 1,373.6 sq m respectively). The change of use of Unit A2 from Showroom and Sales Area (228.1 sq m), Retail Warehousing (584.5 sq m) and Warehousing (564 sq m) to Vehicle Sales and Leasing Outlet with Vehicle Servicing/Maintenance Garage (1,373.6 sq m) with sales showroom, public facilities (incl. customer lounge, toilets and meeting rooms), staff facilities (incl. lobbies, staff room, toilets, cloak/change rooms, showers and conference room), service area, office, IT room, plant room and storage. External works to Unit A2 include 2 no. building mounted signs (19.4 sq m), new fire escape door on northern elevation, replacement of existing glazed screen and doors with roller shutter door on southern elevation, 13 no. surface car parking spaces (3 no. disabled, 7 no. EV charging and 3 no. regular), enclosed secured open service yard area with 6 no. EV charging points, vehicle wash-bay (59.6 sq m) and waste storage area. Boundary treatments, secure fencing, services (including connection to existing below ground services) and all other ancillary infrastructure and associated site development works above and below ground level. Primary vehicular and pedestrian access will be maintained via the existing permitted Cobh Cross Industrial Estate (also known as Fota Junction Retail Park) access from the L-3004 Local Road (Killacloyne Road) to the north of the site. Secondary vehicular and pedestrian permeability will be maintained from existing routes within the overall Cobh Cross Industrial Estate (also known as Fota Junction
Permission for: • The construction of 4 no. outdoor padel tennis courts located to the rear of unit A1 with each court individually floodlit and enclosed with a combination of perimeter clear tempered glass and fencing ranging in height between three and four metres in height: • The construction of a 2 metre high concrete block boundary wall around the 4 no. outdoor padel tennis courts with associated hard and soft landscaping treatments and access gate: and • Services (Incl. connection to existing below ground services) and all other ancillary infrastructure and associated site development works above and below ground level. Primary vehicular and pedestrian access will be maintained via the existing Cobh Cross Industrial Estate (also known as Fota Junction Retail Park) access from the L-3004 Local Road (Killacloyne Road) to the north of the site. Secondary vehicular and pedestrian permeability will be maintained from existing routes within the overall Cobh Cross Industrial Estate (also known as Fota Junction Retail Park) development, access from the L-7626 Local Road (Killahora Road) to the east.
Change the use of existing Unit A1 (1,373.6 sq.m) from showroom and sales area to indoor recreation facility, at this site of approximately 0.32 hectares. The proposed development will consist of; 1) change of use of Unit A1 (1,373.6 sq.m) from show room and sales area to an indoor recreation facility and construction of 4 no. enclosed padel tennis courts, reception and seating area, merchandise display and sales area, welfare facility units (incl. toilets and shower/change rooms), training area, tiered spectator seating, storeroom; 2) external construction works to Unit A1 include the closing of existing fire escape door on the eastern elevation to match existing elevation, 2 no. building mounted signs (9 sq.m), reconfiguration of internal vehicle circulation and existing surface car parking area to facilitate 31 no. surface car parking spaces (2 no. disabled and 29 no. regular), 8 no. bicycle spaces, and pedestrian footpath linkages (as conditioned under Pl.Reg.No. 22/6600) to a future “Toucan” crossing width zone to accommodate a connection to the Greenway Route along the north of the L-3004 Local Road (Killacloyne Road); and 3) services (incl. connection to existing below ground services) and all other ancillary infrastructure and associated site development works above and below ground level. Primary vehicular and pedestrian access will be maintained via the existing permitted Cobh Cross Industrial Estate (also known as Fota Junction Retail Park) access from the L-3004 Local Road (Killacloyne Road) to the north of the site. Secondary vehicular and pedestrian permeability will be maintained from existing routes within the overall Cobh Cross Industrial Estate (also known as Fota Junction Retail Park) development, accessed from the L-7626 Local Road (Killahora Road) to the east.
The brief summarizes the pattern across all 755 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 21/7424The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief