Permission for a mixed use development. The development will consist of: 1) demolition of the existing four-storey Creidim Centre (approximately 3,718 sq. m. (gross)) and one/two storey St Michael's House Grosvenor School (approximately 2,506 sq.m. (gross)) on the site; 2) Construction of a new three/four storey Creidim Centre (2,520 sq. m. (gross) with 18 no. surface car parking spaces (including 2 no. disabled spaces and 5 no. spaces with electric charging points), 2 no. motorcycle parking spaces, 32 no. surface cycle parking spaces (short stay) and 8 no. cycle parking spaces (long stay) and associated landscaped gardens; 3) Construction of a new two/three storey St. Michael's House Grosvenor Schools incorporating junior and senior cycles (3,412 sq. m. (gross)) with 32 no. surface car parking spaces (including 4 no. disabled spaces and 5 no. spaces with electric charging points), 2 no. motorcycle parking spaces, 20 no. surface cycle parking spaces (short stay) and 8 no. cycle parking spaces (long stay), 6 no. covered bus parking spaces and 8 no. bus set down queuing spaces and associated secure open space and play area; 4) Construction of a 22,733 sq. m. (gross) office development comprising two buildings; Block 1 - 10,062 sq. m. (gross) office space over four floors and Block 2 - 12,671 sq.m. (gross) office space over five floors above a single level basement accommodating 150 no. car parking spaces (including 6 no. disabled spaces and 30 no. spaces with electric charging points) 336 no. cycle parking spaces (long stay), 8 no. motorcycle parking spaces, staff changing/shower/toilet areas, service and plant areas, waste management areas and storage areas; 5) Provision of a central open space incorporating soft and hard landscaping and a pedestrian plaza and 168 no. surface cycle parking spaces (short stay) and 2 no. disabled car parking spaces; and all other associated site works required to facilitate the proposed development including the upgrading and realignment of existing access to site from Central Park and of the existing emergency access route from Leopardstown Road; internal access roads and pedestrian and cyclist routes; perimeter/boundary landscaping and fences; installation of signage on the southern elevation of the proposed Creidim Centre, on the entrance gate to the Creidim Centre and St Michael's House Grosvenor Schools car park and on the side of the canopy over the bus setdown area on the northern elevation of the St Michael's House Grosvenor Schools; and 1 no. single storey ESB substation/switchroom, store and waste compound building (105 sq. m.). An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
4.33 hectare site on, Leopardstown Road, Sandyford Business Estate, Dublin 18
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
11% of nearby decided applications were refused. The preview found 8,294 nearby planning records within 5 km where a location match is available.
- Matched source
- D22A/0360
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Permission for development. The proposal consists of the construction of 3 no. office buildings ('N1'; 'N2' and 'N3') ranging in height from 6 to 8 storeys, over lower ground floor and basement level. The total GFA of office floorspace proposed is c.47,216 sq.m. The proposal includes plant areas at basement, lower ground and roof level. The proposal includes a wellness pavilion building (GFA of c. 148 sq.m), public open space, sunken gardens, shared entrance plaza, upper level / roof terraces to buildings and all associated works. The proposal includes 474 no. car parking spaces at basement and lower ground floor level. 474 no. cycle parking spaces are proposed at lower ground and surface level. The associated site and infrastructural works include site access and internal roads, entrance ramp to car park, cycle path, footpaths, 4 no. ESB substations, bin stores, plant rooms, foul water drainage, surface water drainage including attenuation tank watermains including water storage tank, utilities, hard and soft landscaping, public lighting, boundary treatments and all ancillary works on an application site area of c. 1.97 hectares.
Permission for development. The proposal consists of the construction of 3 no. office buildings ('N1'; 'N2' and 'N3') ranging in height from 6 to 8 storeys, over lower ground floor and basement level. The total GFA of office floorspace proposed is c.47,216 sq.m. The proposal includes plant areas at basement, lower ground and roof level. The proposal includes a wellness pavilion building (GFA of c. 148 sq.m), public open space, sunken gardens, shared entrance plaza, upper level / roof terraces to buildings and all associated works. The proposal includes 474 no. car parking spaces at basement and lower ground floor level. 474 no. cycle parking spaces are proposed at lower ground and surface level. The associated site and infrastructural works include site access and internal roads, entrance ramp to car park, cycle path, footpaths, 4 no. ESB substations, bin stores, plant rooms, foul water drainage, surface water drainage including attenuation tank watermains including water storage tank, utilities, hard and soft landscaping, public lighting, boundary treatments and all ancillary works on an application site area of c. 1.97 hectares.
Permission for development at this site. The erection of 1 No. high level wall
Permission for development. The application site is located adjacent to Block H
Permission for development. The development will consist of:
The full report covers all 8,294 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record D22A/0360The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report