Modifications to planning previously granted under F24A/0732E: (i) reduction in area of an external heat pump and primary pumps compound, (ii) reduction in area of a separate external high temperature heat pump compound, (iii) reconfiguration and additional area for medical gases and mechanical rooms, (iv) additional area for medium voltage client room, (v) hardstanding, fencing, and all associated site works necessary to facilitate the development. Additional information received 20/08/2025
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Swords Business Campus, Balheary Road, Swords, K67C6H6
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
16% of nearby decided applications were refused. The preview found 1,914 nearby planning records within 5 km where a location match is available.
- Matched source
- F25A/0549E
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
The development will consist of (i) an external heat pump and primary pumps compound, (ii) liquid oxygen compound, comprised of a VIE (vacuum insulated evaporator) liquid oxygen primary tank (20,000 litres) of 8.40m in height and back-up VIE liquid oxygen tank (10,000 litres) of 7.50m in height, vaporisers 4.32m in height) and associated manifold plant room, (iii) bottle gases stores rooms, (iv) vacuum and medical air plant room, (v) an external high temperature heat pump compound, (vi) medium voltage, transformer and offloader rooms, (vii) backup electricity generator compound with associated fuel tank (18,000 litres) of 2.8m height, (viii) an external condenser unit compound, (ix) relocation of existing carparking and, (x) hardstanding, fencing, and all associated site works necessary to facilitate the development. AI Rcvd 16/12/2024 CAI received 31/01/2025
Additional permanent car parking to existing office campus consisting of 48 no. car spaces and associated circulation entrances, exits, drainage and landscaping with an overall area of 0.2 hectares adjacent to Unit 1. Add Info received 7th July 2020. Add Info deemed Significant 8th July 2020. Revised Public Notices received 16th July 2020.
Planning Permission for modifications to planning previously granted under F24A/0732E: (i) re-location of car parking spaces granted under F24A/0732E to alternative areas on the Swords Business Campus, (ii) modification of location and details regarding the attenuation storage, and all associated site works necessary to facilitate the development. Additional information received 12/09/2025 Clarification of Additional information received 17/10/2025
The proposed development will comprise: (i) Change of use of existing two storey building (Unit 1 ) from office/warehouse to a surgical service hub; (ii) Internal fitout to facilitate development including: main reception area, cafe retail area, admission suites, sub-waiting areas, treatment rooms, exam rooms, anaesthetic rooms, operating theatres, second-stage recovery rooms, discharge lounge, and all ancillary rooms required to facilitate the surgical service hub use; and (iii) Drainage, landscaping, boundary treatments and all associated works necessary to facilitate the development. AI rcvd 17/11/2023
Additional temporary car park spaces, to be removed upon Estuary MetroLink station becoming operational, to existing office campus consisting of 113 no. car spaces and associated circulation, entrances, exits, drainage and landscaping with an overall area of 0.3 hectares adjacent to Unit 1, Swords Business Campus.
Source match
Matched from public planning record F25A/0549EThe full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report