The proposed development will consist of the installation of 10 No. co
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Newtown & Coldwinters, North Road, Fingal, Co. Dublin
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
12% of nearby decided applications were refused. The preview found 2,019 nearby planning records within 5 km where a location match is available.
- Matched source
- FW19A/0090
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Permission for an amendment to the original planning permission, at this site, for a gas peaking facility with 10 no. containerised gas fired generating units, with an export capacity of 20 megawatts (MV) under planning reference FW19A/0090. Amendments are proposed to the gas peaking will consist of the installation of 6 no. battery storage units with an export electricity capacity of 10-15 MV and 4 no. containerised gas fired generating units with an export electricity capacity of 10 MV, in replacement for the 10 no. containerised gas fired generating units, granted under planning reference FW19A/0090. 3 no. inverter transformers will also be added to the site, being the battery storage units. Other elements of the development will remain the same as FW19A/0090 and include an underground cabling route c 1.45km along the R135 road. 1 no. single storey electrical substation building, 1 no. customer switch entrance, security gates gear, electrical inverter/transformer station modules, concrete support structures, heating, ventilation and air conditioning units (HC/AV units), underground gas pipework and connection points, access tracks and new site entrance, security gates, perimeter security fencing, CCTV security monitoring system, landscaping works, and all associated ancillary infrastructure.
The development will consist of 1 no. building for warehouse/logistics use, to be known as Unit 6, with a gross floor area of 9,821 sq.m. The building will measure 18.1m high (at parapet level) and have 2 storey ancillary offices. Elevational signage will be provided. The unit will form part of Phase 2 of Vantage Business Park along with Units 3, 4 and 5 (permitted under reference FW20A/0211), Phase 1 to the south consists of Unit 1 under construction and Unit 2 complete in 2019. The proposed development includes 6 no. HGV parking spaces, 82 no. car parking spaces, 58 no. cycle parking spaces, 8 no. dock levellers and 2 no. grade loading bays. All associated siteworks including diversion of existing foul rising main, boundary treatments, landscaping, service yards, internal road and footpaths, dry detention basins/swales, lighting, 1 no. free standing sign, security and access control room, signage at entrance, refuse storage, heat pumps and all associated siteworks including drainage infrastructure.
An amendment to original grant of permission (F16A/0128) to relocate 2
Amendments to previously approved application (ref FW14A/0162) which c
The proposed development will consist of plant located outside of the existing warehousing and logistics building granted under FW19A/0143; sprinkler pump house (7 x 6 x 3.6m high), sprinkler tank (8.4m high and 10m diametre), chiller (3.5m x 2.5m x 2.5m high) and oxidiser storage unit (6 x 3 x 3.4m high) in the rear service yard, and a standby generator (4.2m x 1.5m x 2.2m high) to the north of the existing warehouse, all on concrete bases. An ancillary logistics office (69sq.m) and mezzanine plant area (247sq.m) are proposed within the existing warehouse. An additional window (1.35m high x 1.12m wide) and 2 No. relocated doors are proposed along the eastern elevation of the existing building. Additional metal louvres are proposed on the north, south and east elevations.
Source match
Matched from public planning record FW19A/0090The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report