The development will consist of 1 no. building for warehouse/logistics use, to be known as Unit 6, with a gross floor area of 9,821 sq.m. The building will measure 18.1m high (at parapet level) and have 2 storey ancillary offices. Elevational signage will be provided. The unit will form part of Phase 2 of Vantage Business Park along with Units 3, 4 and 5 (permitted under reference FW20A/0211), Phase 1 to the south consists of Unit 1 under construction and Unit 2 complete in 2019. The proposed development includes 6 no. HGV parking spaces, 82 no. car parking spaces, 58 no. cycle parking spaces, 8 no. dock levellers and 2 no. grade loading bays. All associated siteworks including diversion of existing foul rising main, boundary treatments, landscaping, service yards, internal road and footpaths, dry detention basins/swales, lighting, 1 no. free standing sign, security and access control room, signage at entrance, refuse storage, heat pumps and all associated siteworks including drainage infrastructure.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Lands between the N2 and R135, Coldwinters, St. Margarets, Co. Dublin.
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
12% of nearby decided applications were refused. The preview found 2,138 nearby planning records within 5 km where a location match is available.
- Matched source
- FW22A/0068
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Amendments to previously approved application (ref FW14A/0162) which c
The proposed development will consist of the installation of 10 No. co
Permission for an amendment to the original planning permission, at this site, for a gas peaking facility with 10 no. containerised gas fired generating units, with an export capacity of 20 megawatts (MV) under planning reference FW19A/0090. Amendments are proposed to the gas peaking will consist of the installation of 6 no. battery storage units with an export electricity capacity of 10-15 MV and 4 no. containerised gas fired generating units with an export electricity capacity of 10 MV, in replacement for the 10 no. containerised gas fired generating units, granted under planning reference FW19A/0090. 3 no. inverter transformers will also be added to the site, being the battery storage units. Other elements of the development will remain the same as FW19A/0090 and include an underground cabling route c 1.45km along the R135 road. 1 no. single storey electrical substation building, 1 no. customer switch entrance, security gates gear, electrical inverter/transformer station modules, concrete support structures, heating, ventilation and air conditioning units (HC/AV units), underground gas pipework and connection points, access tracks and new site entrance, security gates, perimeter security fencing, CCTV security monitoring system, landscaping works, and all associated ancillary infrastructure.
The construction of 2 no. Single-Storey Units for industrial and/or Warehouseuse with ancillary Two-Storey offices with a gross floor area 11,157.90 square meters. The development will also include 2no. ESB substations, ancillary site development works for underground duct work, drainage and utility services, service yards, car parking, signage to the proposed units, the extension of Cedar Drive to the west, on a site area of 2.97 hectares Additional Information Lodged on 5th Dec 2019. Additional Information was deemed SIGNIFICANT on 6th December 2019. Significant Additional Information Public Notices received on 14th Jan 2020
An amendment to original grant of permission (F16A/0128) to relocate 2
Source match
Matched from public planning record FW22A/0068The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.