Construction of new two storey extension to rear of existing dwelling comprising ground floor kitchen dining area, first floor bedroom with ensuite, and associated site works.
Alterations and change of use to two ground floor commercial units. The Alterations will consist of combining 2 no. existing ground floor commercial units (4 Ashe Street and 6 Ashe Street) into a single unit. 4 Ashe Street as constructed has an area of 159 sqm. 6 Ashe Street as constructed has an area of 159 sqm. The proposed combined unit will have an area of 322 sqm. The existing elevations of the building will not be effected by this application. The application will also seek to change the use of the units. The permitted use of 4 Ashe Street is retail and of 6 Ashe Street is also retail. The proposed new use for the combined unit will be as a shop use with an ancillary off-license.
The development will consist of 1) 2 no. single storey extensions to the rear. 2) Increasing the height of the existing roof over the ground floor playroom to allow for attic accomodation. 3) Dormer windows to the front & rear. 4) Internal alterations. 5) Roof lights and solar panels to the rear of existing detatched dwelling and all associated site works.
Planning permission is sought for a new two storey detached dwelling to the side of existing dwelling site with shared vehicular entrance, demolition of existing detached domestic garage & all associated site works. AI Rcvd 16/06/2025
Planning Permission for the following: A single-storey, side and rear, ground-floor, extension to dwelling.
Permission for development on a 0.353 ha site, a former builder's yard, that will consist of: (a) Demolition of 3 no. sheds; (b) Blocking up of disused access gate to Benson Close; (c) Construction of 9 no. 2 storey houses with attic accommodation; consisting of (i) 2 no. 5 bedroom detached houses, (ii) 3 no. 3 bedroomed terraced houses; and (iii) 4 no. 4 bedroomed semi-detached houses, (d) Widening of existing entrance to provide a new access road and footpaths off Beaverstown Road, (e) Provision of open space; (f) All associated site works and boundary treatment works. Add Info received 30th January 2020. Add Info deemed Significant 4th February 2020. Revised Public Notices received 7th February 2020.
Alterations and change of use to two ground floor commercial units. The alterations will consist of combining 2 no. existing ground floor commercial units (82 Scholars Walk and 2 Ashe Street) into a single unit. 82 Scholars Walk as constructed, has an area of 166 sq.m; 2 Ashe Street, as constructed, has an area of 109 sq.m. The proposed combined unit will have an area of 277 sq.m. The existing elevations of the building will not be affected by this application. The application will also seek to change the use of the units. The permitted use of 82 Scholars walk is retail and of 2 Ashe Street is café. The proposed new use for the combined unit will be as a café/restaurant with an ancillary take out area for retail sales. AI received 15/12/22 SAI received 22/12/22
The construction of a single storey extension to the rear, alterations to the first floor fenestration on the rear elevation, the widening of the existing vehicular entrance and associated site works.
The development will consist of a 2-storey extension to the existing house, between the existing house and the site boundary to primarily allow for disabled adaption. AI received 28/11/23
Change of material to the side elevation and side extension of Dwelling No. 5 approved under Reg. Ref. F19A/0311 to now provide for a render finish in lieu of the previously approved brick.
Retention Planning Permission for conversion of garage to habitable room and demolition of existing chimney flue along with ancillary works. AI Rcvd 23/1/25
Permission for new 20 sq.m. of photo voltaic solar panels to roof of barn shed in rear garden as previosly approved under pallning ref. F13B/0197.
Bungalow & waste water treatment system
Planning permission is sought for a single storey
Planning Permission for revisions to part of previously permitted development PL 06F.247787/Reg. Ref F15A/0565 to omit 2-storey commercial Block 2 (642m² food-drink use) and 3-storey mixed residential Block 3 (1 No. 2-bedroom gate lodge and 6 No. 2-bedroom village apartment, 3 No. 3 bedroom village apartments over 259m² retail use, 157m² non-retail services use and 217m² food-drink use) and to now provide 12 No. 3-bedroom 2-storey houses. The development includes 24 No. car parking spaces and all associated and ancillary site works. Add Info received 9th January 2020.
The demolition of the existing single storey house and the construction of 6 No. 2.5 storey semi-detached dwelling houses and all associated and ancillary site development works including relocation of the vehicular access from Portrane Road. Add Info received 17th April 2020. Add Info deemed Significant 24th April 2020. Revised Public Notices received 7th May 2020.
Development will consist of a new gable wall to the side of the existing house with a new window added at attic level and a proposed new dormer roof to the rear of the existing house roof & 1No. new Velux window to the rear of the existing house roof and all ancillary works.
Permission for the renovation of a single storey dwelling with amendments to window opes, a single storey domestic extension, new proprietary waste water treatment system and surface water disposal system, relocation of vehicular access and all associated siteworks. Additional Information received 19/11/2025
Renovation of a single storey dwelling with amendments to window opes, a one and a half storey domestic dormer extension, new proprietary waste water treatment system, relocation of vehicular access and all associated siteworks.
Permission is sought for single-storey extensions to the side and rear of existing dormer bungalow and all associated drainage & siteworks at Bridgefield House, Lane Farm, Skerries, Co. Dublin K34 K041. Signed B & A Rice.
Planning Permission is sought for attic development for study / storage, to include removal of existing hipped section of roof, construction of a raised gable end, with new flat roof type dormer extension & window to rear, installation of 1 Nr. window to side and 2 Nr. Rooflights to rear, together with associated site works.
Planning Permission for attic conversion with dormer to rear and roof windows to accommodate stairs to allow access to attic conversion as non-habitable storage space, roof windows to front roof all with associated ancillary works.
The development will consist of re-design & some alterations to previously approved planning application F16B/0043/E1. New proposal is a 2 storey pitched roof extension to the side of the existing dwelling with dormer window at first floor level to the front elevation to match existing dormer. All new works are to the northern end of the site facing Portrane Road. The development is to include internal alterations, landscaping and all ancillary site works and drainage as required. AI received 22/11/24 SAI received 22/12/24
New two storey pitched roof extension to front/side/rear & new entrance porch, revised vehicular access and all associated works at end terrace house. AI Received 03/05/2022 CAI received 20/6/2022
Minor alterations to previously approved double garage/workshop (Ref No: F17A/0231) to accommodate: (a) 3 no Velux roof lights to eastern elevation; (b) New gable window to front and rear elevation; (c) all associated site works.
Planning Permission for an extension to their existing
Alterations to existing dwelling house including demolition of existing extensions and new extension to rear of existing dwelling house along with all associated siteworks.
The development will consist of a single storey pitched roof extension to the side of existing two storey semi detached house comprising a bedroom and a shower room, and all associated site and ancillary works.
The development will consist of retention planning permission for single storey extension to rear, and conservatory to rear.
Permission for development at a site of c. 0.52 Ha at Kavanagh's Garden, Beaverstown Road, Donabate, Co. Dublin. The site is bounded to the north by lands associated with a 2-storey detached dwelling at Beaverstown Road and the single storey detached dwelling known as 'Strawberry Bungalow', to the south by the 1 - 2 storey Donabate Portrane Educate Together National School, to the east by the rear gardens associated with 2-storey semi-detached dwellings at Nos. 77, 78, 79 and 80 Somerton and to the west by Beaverstown Road. The development will consist of: Construction of 18 no. 2 - 4 bedroom 2 storey semi-detached and terraced dwelling houses with rear gardens (houses range in size from c. 103 sqm to c. 153 sqm GFA each); public open space (c. 563 sqm in area); proposed vehicular and pedestrian access from Beaverstown Road; proposed internal access/shared road through the site; car parking (19 no. spaces); bicycle parking; bin storage; lighting; hard and soft landscaping; boundary treatment works; services provision; drainage works including Sustainable Urban Drainage Systems (SuDS) and all associated site excavation, infrastructural and site development works above and below ground (including pumping station and associated kiosk). The planning application is accompanied by a Natura Impact Statement.
Planning permission for demolition of existing single storey rear extension & side garage. Construction of single storey side & rear extension with pitched roof over & 3 no. roof lights over at 27 Beaverstown Orchard, Beaverstown, Donabate, K36 HF78.
Planning permission is sought for alterations and extensions to house and for retention of extension at side of house. AI Rcvd 19/03/24 - Deemed Significant SAI Revised public notices rcvd 22/04/24 CAI Received 07/08/2024 CAI deemed SAI 8/8/24 SAI Receieved 20/09/2024
A development consisting of the construction of 1 no. skills wall and 1 no. single storey storage building, new path and associated site development works. AI received 01/06/21
The proposed development will consist of: (A) Subdivision of existing family landholding with provision of new internal boundary wall to facilitate the construction of a new 1 ½ storey, 4 no. bedroom, detached dormer dwelling (c. 171.4 m2 GFA). (B) Provision of Velux rooflights to front and rear of the proposed dwelling. (C) Modification to existing front entrance wall and pillar to facilitate vehicular access to proposed site. (D) The provision of 2 no. within curtilage car parking spaces to serve the proposed dwelling and modification of existing car parking provision serving family home. (E) All associated site development and engineering works necessary to facilitate the development. AI Received 07/04/2025
Planning permission is sought to demolish existing single storey extension to rear and to build new single storey to rear/ side, together with new porch to front and retention of single storey storage room to side and associated site works.
The development will consist of a residential scheme providing 28 no. units in total. The scheme comprises: (i) the construction of 9 no. two-storey buildings, consisting of 17 no. one-bedroom apartments and 1 no. ground floor level community facility in the form of a multi-purpose room with storage space. A communal garden is provided to the rear of the proposed communal facility. Each of the 17 no. apartments proposed is provided with private amenity space to the rear (west) and 1 no. car parking space provided to the front (east). These 17 no. one-bedroom apartments and the associated communal facility are provided on-site for visually impaired persons and will be provided in association with The National Association of Housing For The Visually Impaired (NAHVI), an Approved Housing Body (AHB). The proposed development also includes: (ii) the construction of 11 no. two-storey, three bedroom, terraced dwellings, each served with private amenity space to the rear and 1 no. on-curtilage car parking space; (iii) the provision of 1,018 sq.m of open space; (iv) the provision of new road surfaces and footpaths, with access to the development site provided from the existing road network in 'The Paddocks' Residential Development to the east; and (v) all associated works including landscaping, boundary treatments and drainage, necessary to facilitate the development.
No1. The construction of 364 no. new residential dwellings consisting of 158 no. houses, 82 no. duplex units and 124 no. apartment units set out follows: • Construction of 158 no. 2-storey houses (54 no. 2-beds, 99 no. 3-beds, 5 no. 4-beds). • Construction of 82 no. 2 to 3 storey duplex units (8 no. 1-beds, 33 no. 2-beds, 41 no. 3- beds), with balconies on all elevations. • Construction of 3 no. apartment blocks, ranging from 3 to 6 storeys in height, with balconies on all elevations, green roofs, and external amenity courtyards, providing a total of 124 no. apartment units (48 no. 1-beds, 66 no. 2-beds, 10 no. 3-beds). 2. The scheme provides c. 17% public open space of the net site area comprising 2 no. small parks and 1 no. pocket park which total c. 13,646 sq.m. These parks are located centrally within the site providing a series of north-south linear spaces linking to permitted Ballymastone Phase 1 (FCC Ref. LRD0008/S3 & ABP Ref. 315288) to the south. 3. A total of 278 no. car parking spaces are provided (in-curtilage for the houses and in a mix of both on-street and communal car parking areas for apartment and duplex units). A total of 1,457 no. cycle spaces are provided for residential units (comprising 1,353 long-stay/ resident spaces and 104 no. short-stay/ visitor spaces). 4. The development provides for vehicular access from The Links Road, Donabate Distributor Road (DDR) and permitted Ballymastone Phase 1 (FCC Ref. LRD0008/S3 & ABP Ref. 315288). 5. A north-south pedestrian/ cycle route is proposed within the site connecting permitted Ballymastone Phase 1 (FCC Ref. LRD0008/S3 & ABP Ref. 315288) and future development lands to the north. A series of east-west pedestrian/ cycle routes are proposed connecting the site to permitted Ballymastone Recreational Hub to the east (PARTXI/004/21). 6. Proposed new foul pump station located to the north-east of the site. 7. The proposed application includes all site enabling and site development works, landscaping works, PV panels, bin stores, plant, boundary treatments, ESB Substations, lighting, servicing, signage, surface water attenuation facilities and all site development works above and below ground. An Environmental Impact Assessment Report and a Natura Impact Statement have been prepared in respect of the proposed development. The application may also be inspected online at the following website set up by the applicant: www.ballymastonelrd2.ie AI - received 8/7/24
The erection of new illuminated shop-front signage.
Permission for development to consist of: (i) The change of use of a portion of the existing ground floor retail to doctors surgery including all associated site and ancillary works.
Permission for the following: 1. Retention of an unauthorised garden shed (35.6m²) 2. Change-of-use of garden shed to home offices and 3. Extension of the shed building by 6.7m². Total Floor Area: 35.6m². Additional Information Received 5/5/2026
New detached one and a half storey dwellinghouse along with on site wastewater treatment system, percolation area & surface water soakaway, siteworks to include replacement of existing septic tank serving existing dwellinghouse with wastewater treatment system, percolation area and new surface water soakaway. AI Rcvd 21/01/2025 SAI Received 08/02/2025 CAI Rcvd 15/04/2025
The development will consist of the following: retention permission for the demolition of part of converted garage and outbuildings (67 sq.m) and permission for the demolition of remaining part of existing single storey dwelling (98 sq.m); the construction of 3 no. 2-storey detached dwellings made up of 2 no. 4-bedroom dwellings Type A & A1 (128.85 sq.m) and 1 no. 3-bedroom dwelling type B (114.24 sq.m). The development also includes 1 no. private car parking space to the front of each residential dwelling; the repositioning of the existing entrance on to Station Road; the provision of two entrances, one entering from Station Road and one entering from The Avenue, Orlyn Park; hard and soft landscaping; boundary treatments; and all other associated site works above and below ground. AI received 30/08/23
Alterations, extension & renovations to house and for waste water treatment system.
Planning Permission is sought for Construction of new vehicular entrance gate for the purposes of accessing an agricultural field, and associated site works.
New front porch (east facing) onto existing two-storey dwellinghouse and associated siteworks.
Permission sought for proposed single storey detached garden room to side/rear garden of dwelling house with mixed use of massage therapy use as a small- scale home-based economic activity appointment based, along with residential use ancillary to the enjoyment of the house with associated site development works.
Planning permission for the construction of 65 two storey family houses comprising 10 no. four bedroomed houses and 55 no. three-bedroomed houses. The development includes 111 on curtilage vehicle parking spaces, the installation of a new vehicular access to the lands from the R127 Skerries Road, the closing of an existing field access on the R127 Skerries road, the creation of a new pedestrian and cycle link from the development through to Clonrath Close, the creation of a new pedestrian link from the development to Rathmore Park, and new pedestrian path and associated landscaping in Rathmore Park. The development includes associated site works and infrastructure including landscaped open spaces, boundary treatments, internal roads, paths, public lighting, services, utilities, drainage and surface water attenuation and all ancillary and associated works. AI Rcvd 21/12/23 CAI received 15/03/24 SAI Rcvd 27/03/24
The development consists of retention for part change of use of previously approved Stock Room (permitted under planning ref: F06A/0095) within the existing supermarket (parent permission F04A/0132) from ancillary storage area to retail use.
The development will consist of the installation of new and replacement wall mounted, illuminated signage to the existing building including electrical supply and installation. Additional Information received 19/12/25
The development will consist of the removal of the existing advertising monolith and replacement with new totem in alternative location at the entrance to the site, including electrical supply and installation and reinstatement of existing rendered boundary wall.