Renovation and modifications to the original building including a change of use to office, training and distribution centre; proposed changes to the existing internal layout; internal fire stair location moved; extended mezzanine area, additional new toilets; external windows and modifications to the roller door on the rear elevation; new signage to the front elevation and all ancillary works.
Change of use of 58.4sq.m of the front ground floor single storey part of Unit 1 from office/light industrial use to click-and-collect retail use and ancillary site works.
The proposed development, Innovate Health, Centre of Excellence in Brain Health and Dementia, which will consist of: The demolition (in part) of the existing concrete beams adjoining the neighbouring unit and relocation of existing underground services. A five-storey building with part six-storey elements and set-back accommodation and plant rooms. (c. 6,590m²). The building functions comprise a reception area, café/restaurant, central atrium, radiology department, treatment, assessment and consultation rooms, research facilities, associated offices and meeting rooms and associated staff facilities, plant and storage rooms. Roof terrace at Level 05 at the south end of the building. Extract flues above roof level for laboratory ventilation. The removal of 14 car park spaces in the existing adjacent TUH car park to facilitate a new Entrance Park consisting of hard and soft landscaping and lighting. New footpath, signage, loading bay and accessible parking space off Fourth Avenue. New footpath, signage, set down area and two accessible parking spaces off the internal hospital campus road to the west. Extended footpath to the west of the adjacent car park and new pedestrian crossing to enhance pedestrian access to the existing multi-storey car park. New pedestrian crossing to connect the new Entrance Park with the main entrance to Tallaght University Hospital. Secure enclosed staff bike store to the North and visitor bike racks in the Entrance Park. Bin store to east side of building. Boundary fencing, walls and gates to east of site. The new facility will employ an extension to Tallaght University's Hospital current waste license. All associated ancillary site development and drainage works.
Planning Permission for the Demolition of existing Garden Shed and proposed creation of new work from home office/ home gym and garden toom to the rear of existing dwelling
Change of use of premises from offices and showrooms to health club and for sign on south façade of building.
Aldi Stores (Ireland) Limited are applying for permission for the construction of a single storey Deposit Return Scheme (DRS) Kiosk (Gross Floor Area: 17 sq.m) including 2 no. signage panel areas for branding on the side elevation of the DRS Kiosk (1.0m x 2.0m), and all associated site development works. The development will result in the removal of 2 no. existing car parking spaces in the car park that serves the existing Aldi store at Belgard Road, Tallaght, Dublin 24 D24 VY77.
Sliding steel entrance gate to the main entrance; partial demolition of a section of existing boundary wall; construction of new site entrance piers and the extension of the existing perimeter railings to meet the new piers; 2 new bicycle shelters and all associated site development works.
Amendments to a previously consented natural gas combined heat and power system and associated infrastructure (Ref. SD21A/0013).
Installation and operation of a natural gas combined heat and power system and the associated infrastructure.
Works to the existing roof including installation of 173sq.m of solar pv panels; the erection of a new guardrail on the existing parapet to the perimeter of the roof; alteration to a portion of the existing roof from a pitched roof to a flat roof, installation of roof access hatches and all associated site development works.
Change of use from permitted retail use to retail use including the sale of alcohol for consumption off the premises (i.e. off licence use) within the overall permitted retail unit; off licence floor area 8sq.m and is ancillary to the primary retail use.
The development consists the installation of 2no. new water tanks and an associated enclosure to the north of the existing office building, the relocation of a previously granted bicycle shelter under planning reference SD21A/0123, from the east of the site to the south-west, and all associated site works at PM Group, Kearney House, Belgard Square, Dublin, D24 XFW2.
(a) the demolition (total area approx. 4,319.9 sqm) of the existing buildings on site and the existing front boundary treatment; and (b) the construction of a new residential and mixed use scheme of 242 apartment units in 5 blocks (Blocks A to E) ranging from 4 to 7 storeys in height as follows: Block A (5 storeys) comprising 40 apartments (4 one bed, 31 two bed and 5 three bed units); Block B and C (7 storeys) comprising 102 apartments (45 one bed and 57 two bed units); Block D (5 - 7 storeys) comprising 36 apartments (16 one bed and 20 two bed units); Block E (4 - 5 storeys) comprising 64 apartments (31 one bed and 33 two bed units); Block D will accommodate a Childcare Facility/creche of approx. 465sqm at ground floor level; The proposal will also provide for a café of approx. 50.9 sqm at the ground floor of Block C. Residential amenity areas will be provided in the form of a reception of approx. 125.1sqm, resident lounge of approx. 45sqm, a letting office of approx. 11.8sqm, a rentable room/studio space of 39sqm, a public gym of approx; 128.5sqm and a public co-working space of approx. 128.4sqm, all at the ground floor level of Blocks B & C; Each residential unit will be afforded with private open space in the form of a balcony or terrace. Communal open space of 1,797.4sqm is proposed in the form of 2 roof top terraces at Blocks D and E, courtyard space at ground level, outdoor seating and planting and pedestrian and cyclist links; Public open space of 1,400sqm is also proposed in the courtyard area, fully accessible to the general public and includes outdoor seating, paved areas, a lawn area, and play areas in addition to an outdoor seating area to the front of the proposed café at Block C; A total of 136 car parking spaces are provided at ground floor level, including 7 Accessible spaces at surface level; and 426 bicycle spaces (Visitor and Resident in bike stands and secure stacked bike spaces) are proposed; The development shall be served via a new vehicular access point from Broomhill Road; Upgrade works are proposed to the vehicular access point to facilitate the proposed development and to provide for improved access and egress for the overall development. New pedestrian and cyclist access points will be provided on to Broomhill Road from the site; The associated site and infrastructural works include provision for water services; foul and surface water drainage and connections; attenuation proposals; permeable paving; all landscaping works; boundary treatment; internal roads and footpaths; waste storage areas and electrical services and all associated site development works; The application contains a statement setting out how the proposal will be consistent with the objectives of the relevant development plan; The application contains a statement indicating why permission should be granted for the proposed development, having regard to a consideration specified in section 37(2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development materially contravenes a relevant development plan or local area plan other than in relation to the zoning of the land.
Single storey attached metal storage unit floor area of 11sq.m and metal canopy to front elevation; Internal extension of first floor area by 50sq.m
Planning permission for attic conversion with 2 dormers to rear roof to accommodate stairs to allow access to attic conversion as non-habitable storage space with roof windows to front all with associated ancillary works
Change of use of part of existing unit from industrial use for use as a restaurant facility with sit-down facility, cafe and deli with take away produce (teas, coffees, sandwiches etc) over two floors and all associated site works.
Construction of a new two storey extension adjacent to the existing Pharmacy Department located on the east side of the campus to provide a new Aseptic Pharmacy Unit incorporating laboratory areas; support rooms and first floor plantroom; external stairway; new exit door from the Pharmacy corridor to the adjacent service yard; new exit door from the delivery bay area to the hospital delivery yard and associated site and landscaping works.
Change of use from 2 existing office units to 2 two bedroom student accommodation units located at first floor level including minor internal modification works and retaining the existing entrances off the main courtyard.
Change of use from existing cafe bar to 15 studios for short-term accommodation / student accommodation / emergency accommodation units on the ground floor to include internal modifications and external modifications with associated private open space and communal facilities; All with associated signage, drainage and site works.
Amendments to the east elevation comprising of the enclosing wind break wall cladding to the existing covered yard area. Cladding to match existing and to be no more than 4.5 metres in height all with ancillary site works.
Amendments to south elevation to Airton Road to include new entrance porch, new fenestration, and new corporate logo / signage construction of extension to include meeting room and canteen covered seating area in internal courtyard with ancillary site works.
A bicycle storage unit to accommodate 75 no. bicycles to be located within the TU Dublin Tallaght campus, on an area of existing hardstanding to the east of the Main Campus Building and to the west of the Quad, along with all associated site works and services. The bicycle storage unit will be an enclosed, covered single-storey structure. The gross development floor area of the unit will be 101 sqm.
Development on a site of c. 0.008 ha located West of the SSR Building of the TU Dublin Tallaght Campus. The development shall consist of the construction of a M&E plant area (28m2) comprising an enclosed pump house and external water tank with 2.4m high screen fencing surround.
Development on a site of c. 0.021 ha located West of the SSR Building on the TU Dublin Tallaght Campus, Old Blessington Road, Tallaght, Dublin 24. The development shall consist of the construction of a 90m3 underground fire fighting storage tank.
The proposed development will consist of a high-power electric vehicle charging points and associated infrastructure consisting of the following: I. Installation of 4no. electric vehicle charging bays & 2no. charging units. II. Installation of a new ESB Unit Substation. III. Installation of a new CT Metering cabinet. IV. Associated revisions to existing car parking spaces & landscaped area. V. Erection of associated signage. VI. All associated site development works including lighting, drainage infrastructure and line marking.
Alterations to the existing front facade of the existing industrial unit inclusive of external finishes; Proposed facade feature, new windows and new front door; Proposed internal alterations to existing floor plans; Alterations to existing parking lot to include 12 proposed parking spaces inclusive of 1 disabled parking and 2 EV charging point; Proposed new signage and freestanding signage to vehicular entrance inclusive of all associated siteworks.
Change of use of existing uncompleted and vacant office building to motor showroom and service workshop use (1300sq.m) with ancillary office, staff and customer accommodation; removal of existing projecting porch and stairwell at ground floor level (16sq.m); removal of section of existing floor and projecting stairwell (927sq.m) at first floor level; alterations to existing elevations to include for new glazed curtain walling and insulated wall cladding; new attached illuminated building signage; construction of new single storey extension (90sq.m) to rear to form part of new service workshop; all associated drainage and site works.
Change of use and conversion of an existing vacant two storey office building to provide 38 residential accommodation units to be used as a family hub; 16 units at ground floor level and 22 units at first floor level; with communal kitchen facilities, storage space, family rooms, internal play spaces, staff and ancillary rooms at ground and first floor level; external playground; 19 bicycle spaces and 45 car parking spaces located at ground level; associated site works, services, paving, planting, landscaping, lighting and new boundary walls and fencing; revisions to the existing foul and surface water drainage networks and new tree pit attenuation zones; new boundary treatment; construction of 3 outbuildings and modifications to the existing elevations including the addition of new windows on the rear elevation and rear block; vehicular, pedestrian and cycle access to the development will be maintained via the existing access point on Airton Road. Retention is sought for minor new and altered window arrangements to the north (front) and west (side) elevations.
Change of use and conversion of an existing vacant two storey office building to provide 38 residential accommodation units to be used as a family hub; 16 units at ground floor level and 22 units at first floor level; with communal kitchen facilities, storage space, family rooms, internal play spaces, staff and ancillary rooms at ground and first floor level; external playground; 19 bicycle spaces and 45 car parking spaces located at ground level; associated site works, services, paving, planting, landscaping, lighting and new boundary walls and fencing; revisions to the existing foul and surface water drainage networks and new tree pit attenuation zones; new boundary treatment; construction of 3 outbuildings and modifications to the existing elevations including the addition of new windows on the rear elevation and rear block; vehicular, pedestrian and cycle access to the development will be maintained via the existing access point on Airton Road. Retention is sought for minor new and altered window arrangements to the north (front) and west (side) elevations.
New external signage with internal illumination at high level to Northern façade with internal LED display signage (2.5m x 2.1m) at ground floor level.
Installation of a 7.5m x 8.65m retractable canopy/awning, glazed partitions and planters for a 65sq.m sheltered outdoor seating area to the front of existing commercial unit.
Mixed-use development including 310 "Build-to-Rent" residential apartments, a creche and a number of commercial units (c. 2,289 sqm) on a c. 1.26 ha site; Consisting of the demolition of existing boundary wall and construction of: c. 2,289 sqm of retail/commercial floor space across 10 units including retail, restaurant/café and Class 2 financial/professional services and office use, and a crèche (257sqm) at ground and first floor levels; 310 build to rent residential apartments including 99 one bedroom units, 203 two bedroom units and 8 three bedroom units within a part 6 to part 12 storey development across 3 blocks over partial basement; c. 2,223 sqm of communal external amenity space provided in the form of a ground floor garden and external terraces at fifth, sixth, seventh and eighth floor levels; c. 1,026 sqm of public open space provided in the form of a central courtyard with landscaped areas at site perimeters; c. 1,785 sqm of resident support facilities and services and amenities provided at basement, ground and first floor levels; Vehicular access to the basement development from a new access point at Belgard Square East; A new tertiary route provided in the southern part of the site linking Belgard Square East and Belgard Road; Provision of 130 car parking spaces (including 8 club car spaces and 6 disabled access spaces) at basement level in addition to 5 set down spaces (4 serving creche) and 1 disabled access space at ground level, layby on Belgard Square East, 6 motorcycle spaces and a total of 763 bicycle parking spaces; Provision of 4 Ø0.3m microwave link dishes to be mounted on 2 steel support pole affixed to lift shaft overrun, all enclosed in radio friendly GRP shrouds, together with associated equipment at roof level at Block B; Provision of 3 ESB substations with switch rooms and plant rooms at basement level, hard and soft landscaped areas, bin and bicycle stores, public lighting, attenuation, green roof, plant at roof level, service connections and all ancillary site development works. The application contains a statement setting out how the proposal will be consistent with the objectives of the relevant development plan and local area plan. The application contains a statement indicating why permission should be granted for the proposed development, having regard to a consideration specified in section 37(2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development materially contravenes a relevant development plan or local area plan other than in relation to the zoning of the land.
The proposed development principally comprises: the demolition and removal of existing boundary walls and railings on the main development site's eastern, western and northern sides; and the construction of a mixed-use development in 2 No. blocks (Block A to the south and Block B to the north) with a gross floor area of 23,540 sq m (including basement of 275 sq m) and ranging in height from 1 No. to 7 No. storeys (with mezzanine level) over basement. The development includes a total of 199 No. residential dwellings (6 No. studios, 47 No. 1-bed, 98 No. 2-bed and 48 No. 3-bed) in the 2 No. blocks, with Block A comprising 49 No. 'senior living' apartment units and Block B comprising 150 No. 'standard' apartment units. The development also includes 2,123 sq m of non-residential floor space, with the following uses proposed: 4 No. retail units (totalling 331 sq m); 4 No. class 1 / class 2 commercial units (totalling 387 sq m); a bicycle sales and repair shop (81 sq m); an off-licence (64 sq m); a bar (151 sq m); a café (87 sq m); a medical centre (210 sq m); a dental practice (72 sq m); a pharmacy (195 sq m); a beauty/health salon (195 sq m); and a crèche (350 sq m) with external play area. The development also comprises: an undercroft car park accessed via a new entrance/exit at Belgard Square East which provides 58 No. car parking spaces; a gated service lane to the south of Block A, with entrances/exits off Belgard Square East and Belgard Road; 2 No. pedestrian/cycle crossings, at Belgard Square East and Belgard Road; continuation of the northbound cycle lane from Belgard Road onto Old Blessington Road; alteration to the median and northbound right turn at Belgard Road onto Abberley Square; cycle parking; internal communal amenity spaces for the senior living units; hard and soft landscaping, including public open space, communal amenity space and incidental spaces; private amenity spaces (as balconies and terraces facing all directions); boundary treatments; 2 No. sub-stations; plant/operational rooms; bin stores; public lighting; blue roofs; rooftop PV arrays; lift overruns and rooftop opening vents atop both blocks; 4 No. 0.3 m diameter microwave link dishes mounted on 2 No. steel support poles affixed to the Block B lift overrun, all enclosed in radio-friendly GRP shrouds; and all associated works above and below ground. Note for the mixed-use question below: there are too many non-residential uses proposes relative to the lines available, so we have provided the residential floor area and the combined non-residential floor area. See submitted materials for details of the individual non-residential uses. The main development site (approximately 0.91 Ha) is generally bound: to the north by Old Blessington Road; to the east by Belgard Road.
Permission to permanently retain the change of use from Civic Offices to medical centre on foot of now expired, 10 year temporary permission (SD08/0594). Proposed uses include public attendance for consultation, treatment and general healthcare provision on all levels from lower ground floor to fourth floor, including retention of existing signage and roof top plant.
For the demolition of single storey pitched front roof and rear conservatory and construction of new flat roof to single storey front structure, new single storey rear extension and internal ground first floor modifications together with new dormer attic structure consisting of bedroom and en-suite, conversion of existing shed to games room with new front elevation window and new rear glazed doors and all associated works.
(i) Conversion of existing attic to non habitable storage use; (ii) provision of dormer window to the rear and all associated site works.
(i) Retention permission is sought for the mezzanine floor, stairwell and associated meeting room; (ii) (a) change of use of Unit F1 from cafe to car rental office and erection of partition walls to create a reception area, staff offices, staff mess area, wc, store room and staff canteen at ground floor; (b) upgrade works including replacement of mezzanine floor and stairwell; (c) installation of company signage to front of unit; and (ii) change of use from commercial car park to car rental and car share facility at basement level comprising of the following: (a) removal of 3 car parking spaces to provide for single storey car rental kiosk (28.82sq.m) comprising reception area; (b) redesignation of 30 commercial car parking spaces as car rental spaces (3 car club, 3 staff, 12 return and 12 rental spaces); (c) removal of 7 car parking spaces to provide circulation route, and car washing area (69.18sq.m) comprising 2 power washers, 1 wash pad connected to the existing petrol interceptor in the car park and car drying area. The car wash will connect to the mains water connection; (d) erection of company signage over entrance to car park from Belgard Square North; and (e) drainage and all associated site development and ancillary works necessary to facilitate development.
Construction of two new warehouse units (481 sqm each), namely unit 69A and 70A, with ancillary offices located to the north-west of the existing unit 70 and the north-west of the existing unit 69, the reconfiguration of twelve parking spaces to the front of each of the new warehouse units and associated site works.
Alterations to existing external service area to the north eastern side of The Square Shopping Centre at the entrance to the existing service yard comprising of construction of an external plant area (c.135sq.m) enclosed by 2.4 metre high galvanised fencing to accommodate an Air Handling Unit (AHU) and a Chiller Unit ancillary to the shopping centre; new flat roof boiler room building (c.34sq.m gross floor area) within the proposed new enclosed plant enclosure; installation of a metal frame (2.4 metres wide x 1 metre high and located 2-3 metres above the ground supported by metal stilts) to facilitate the connection of the Air Handling Unit and Chiller within the plant area to the covered service yard area; replacement of mesh panels on existing wall on the western and norther side of the service yard with metal louvered panels; all associated site and development works.
Front porch and two storey extension to the side and rear of existing dwelling.
Change of use from retail unit to unit for Day Care Centre use along with signage.
The development will consist of (a) the removal of the existing fascia signage, (b) the installation of green powder coated aluminium cladding panels overlaid on the existing shopfront, (c) the installation of a new double glazed Crittall framed glazing and entrance door complete with repairs to the shopfront, (d) the installation of new internally illuminated fascia signage, (e) the installation of a new internally illuminated projecting sign and (f) all associated site works.
Change of use of existing open plan 997sq.m shell and core retail unit to the use as a spa/recreational facility to include swimming pool area; relaxation areas; treatment rooms; associated office/administration areas; changing facilities; internal dining/restaurant area; associated kitchen facilities; plant areas; associated ducting/extraction vents with associated elevational changes; connections to all services and site development works; new internal mezzanine floor to provide additional 602sq.m at new first floor level and on-street bicycle parking outside the building for 18 bicycles at the corner of Abberley Square and Abberley Square East.
Permission for development at McDonald's restaurant, Belgard Square East, Belgard Road, Tallaght, Dublin 24, D24 HW74. The development will consist of proposed new revised signage to the south, east and west elevations, upgrade works to the existing sky sign including new flat display panel sign, and all associated works necessary to facilitate the development.
Provision of a 9.7sq.m extension to the north-western corner of the building to facilitate additional staff room space; the installation of a new high level window along the western elevation of the building; the replacement of the existing sliding entrance door with a new automatic swing door along the southern elevation of the building; the removal of the existing wall in the external bin storage area/corral to facilitate an increase in area by 17sq.m and the provision of close boarded timber fencing; the removal of a door on both the northern and eastern elevation of the building. The proposed development will also include: the removal of 1 No. Parking space; the replacement of 3 No. car parking spaces with 2 No. Electric Vehicle Charging spaces; the provision of 3 No. additional pedestrian entrances along the southern boundary of the site onto the pedestrian walkway connecting Belgard Square East to the R113; bicycle parking; the rearrangement of the external seating area; signage; and all associated site development works.
Alterations to previously approved design (Reg.Ref:SD25A/0001W) comprising modified internal apartment layouts, additional window/door ope to terraces in Apts 1 & 2, fenestration alternations to southern and eastern facades, additional floor area to Apt. 4 to northern elevation, additional of 2 no. AOV's to roof level and all associated site works.
Change of use of a vacant unit to four one bedroomed apartments.
Erect 224sq.m of photovoltaic panels on the roof of existing building with all associated site works.
Warehouse extension (circa 87sq.m) at rear.
Subdivision of the existing retail department store (Unit 116 - 5,396sq.m. - formerly Debenhams) to comprise 2 retail units - 116A (2,431sq.m) and 116B (2,270sq.m) and new service corridor (176sq.m) to the rear of the proposed unit 116B to provide access to the existing service yard; associated modifications including the removal of the existing mezzanine floor within Unit 116 (497sq.m); creation of new retail frontage within the internal mall and associated signage; revisions to existing retail Unit 117 (113sq.m) and 118 (102sq.m) to form a single amalgamated unit (169sq.m) and creation of additional mall floor space (47sq.m) arising from the unit reconfiguration; all associated site and development works including minor revisions to the layout of the existing service yard.