To construct a single storey dwelling house, domestic garage, proprietary treatment system and associated percolation area, bored well, new site entrance, all ancillary site works and services
Permission to construct (I) Wall Silage Pit with dung stead and all associated site works
Permission to construct (i) extension to existing cubicle shed with slatted tank and dairy wash tank (ii) Slatted loose shed and all associated site works. Demolition of loose shed is also required.
For change of use from agricultural use to industrial use for the storage of concrete products prior to dispatch off site, and associated site works
Permission for erection of an extension to existing clubhouse building, installation of a playground, modifications and expansion of existing car parking facilities including lighting, upgrade to existing sewage facilities to include installation of treatment system and percolation area and all associated site work
The construction of a dormer style dwelling, wastewater treatment system, bored well, new entrance and all ancillary site works.
The Change of Use from an existing holiday home use to permanent domestic dwelling house residential use
Permission for development consisting of the construction of a single storey dwelling, on-site wastewater treatment system, connection to water mains, new splayed entrance and all ancillary site works
The change of use from holiday home use to permanent residential use
2 no. stables with associated storage areas, external concrete apron & walls to horse / pony loading area & ancillary floodlight pole with associated lighting fixtures and all ancillary site works
Demolish 2 No. existing hen houses and permission for the erection of a new hen house and all associated site works
The construction of a single storey dwelling, domestic garage, connection to services, septic tank & percolation area, new entrance, and all associated site works
Permission for the erection of a garage and all associated site works
The construction of a two storey dwelling, appropriate waste water treatment system, bored well, new entrance, domestic garage and all ancillary site works and landscaping
The change of use from holiday home use to permanent residential use
Permission for construction of a single storey / part storey and a half dwelling with detached garage, septic tank and percolation area, new vehicular entrance and all associated site works
For a new agricultural entrance and all associated site works
Alterations and additions to an existing single storey dwelling house, namely erection of a single storey extension to the rear of existing dwelling, removal of existing lean-to extension to side of dwelling and removal of garage at rear of existing dwelling, internal alterations, and all associated ancillary site works
The change of use from holiday home use to permanent residential use
To construct a single storey dwelling, detached single storey garage, new entrance, bored well, waste treatment system & percolation area and all associated site works
Retention of the installation of an overflow service yard and for the position of windows as constructed from that granted under PL Ref No. 08/451 & 19/467 and for permission for a proposed vehicle entrance to serve and approved carpark (carpark granted under PL Ref No. 19/467) and the installation of PV Solar Panels to the roof together with all associated site works
Alterations to existing three storey facility (site numbers 9 & 13 of planning reference no. 07/659 and building constructed under PL 08/451). Alterations to include widening of existing entrances, additional windows at second floor level, additional parking area, perimeter fencing, 2 no. new entrances and internal access to adjacent sites (site numbers 10 & 11 of planning reference no. 07/659), connection to all existing services and retention for an existing portacabin unit and all associated site works
Permission for retention of a wall and cappings to the front boundary of existing dwelling and all associated site works
Retention permission for an existing domestic garage and storage area and associated site works which is constructed to the rear of existing dwelling
Single storey residence, garage and the installation of a septic tank and wastewater treatment system and all ancillary site works
Change of use from holiday home use to permanent residential use
The proposed erection of a warehouse building including external signage and all auxiliary accommodation, a self-storage facility to the rear consisting of container units, the erection of paladin fencing to site boundaries including entrance gates together with all associated site works and landscaping
For the change of use from holiday home use to permanent residential use
New vehicle entrance, and closing existing entrance that services the existing storey and a half house, and all associated site works
The internal modifications, renovation and extension of an existing bungalow dwelling into a part one, part two storey dwelling. The works will consist of 1. Demolition of an existing single storey boiler house with lean-too roof, 2. Demolition of an existing single storey utility room with lean-too roof, 3. Internal modifications to existing layout, 4. The addition of a first-floor level over part of the dwelling, 5. The construction of a single storey flat roof extension to the south and east and 6. All associated site works
Development at a site at the entrance to the Tullow Wastewater Treatment Plant, Bunclody Road (N81), Tullow, Co. Carlow, R93 RY69 measuring approximately 0.14 hectares. The development will consist of [1] the retention of the existing ‘as built’ wall to the north and south of the site entrance to the Tullow Wastewater Treatment Plant; [2] the demolition of part of the ‘as built’ southern wall, fence and hardstanding; [3] the construction of a new realigned section of wall, concrete hand standing and fence to tie in with the remainder of the ‘as built’ wall, footpath and fence; and [4] hard and soft landscaping works and other associated site development works above & below ground necessary to deliver the development
Development at a site entrance to the Tullow Wastewater Treatment Plant, measuring approximately 0.0605 hectares. The development will consist of works to improve the visibility splay at the ertrance to Tullow Wastewater Treatment Plant, including; demolition of the existing boundary fencing; construction of new retaining boundary walls and new boundary fencing and the provision of a new grass verge along the N81. The development will also consist of the: relocation of existing road signage; relocation of utility and light standard poles; all hard and soft landscaping; and all other associated site excavation, infrastructural and site development works above and below ground including changes in level and boundary treatments
For the proposed erection of a warehouse building including external signage and all auxiliary accommodation, the erection of paladin fencing to site boundaries including entrance gate together with all associated site works
The construction of a 2-storey detached dwelling, connection to existing site services and existing vehicular access road, provision of landscaping and boundary treatment works, and all associated and ancillary development works
The construction of two new production halls, (No.s 4 and 5, floor area 3,750m2) and extension to existing car-parking facilities and associated civil works
Permission for the reconstruction and expansion of welfare facilities and office accommodation and associated civil works
Permission for development for a dormer dwelling, car garage, packaged wastewater treatment system and polishing filter, new vehicular entrance, and all associated site works
Permission for development consisting of alterations and additions to an existing two storey detached dwelling consisting of a two storey extension to the side, internal alterations and all ancillary site works
To construct a single storey dwelling house with detached garage, septic tank and percolation area, new site entrance and all ancillary site works
Permission for the construction of an Aviary Building, an Imprint Building, a Hack Pen, a hard surface laneway to serve the buildings and all ancillary site works.
Permission for 2 no. New steel framed warehouse/light industrial units (including ancillary offices and operational facilities over two storeys to the front of unit no. 2), associated car parking, site vehicular entrance, perimeter fencing, sign to front façade of unit no. 2, connection to existing services and all associated site works
Permission for the construction of a dormer style extension, to the East elevation of existing dwelling and all associated site works at Castlemore, Tullow, Co. Carlow.
The following areas as part of a 2 storey existing dwelling (granted under PL99-584); additional basement area with internal access, conversion of attic area, alterations to footprint of original dwelling house, alterations to external façade, construction of a detached dormer style studio (originally in ruins), a detached garage unit with a loft area, 1 no. additional site entrance and all associated site works
The restoration of an existing farm cottage and a two storey extension, domestic well, onsite waste water treatment system, percolation area and all associate site and landscaping works
Alterations to perimeter fencing including removal of existing v-mesh on northern and partial west perimeters and replaced with a 900mm concrete retaining wall with v-mesh reinstated on top to maximum height of 2,400mm along with all associated site works
For 3 wooden storage shed used for domestic storage, 1 boiler room and stick storage shed attached to existing dwelling and associate works
The proposed development comprises the construction of: A) a 1062m2 warehouse extension to the south of an existing light industrial warehouse building; B) demolition of an existing 92m2 light industrial unit; C) a 105m2 extension to the west of an existing light industrial warehouse building; D) hard and soft landscaping, boundary treatments, and all associated works and site works to facilitate the development
The construction of a single storey dwelling, use of an existing mechanical aeration unit and percolation area, connection to services, alterations to existing entrance, and all associated site works
The construction of single storey extension to north and east elevations of existing office area with all associated site development works
Retention Permission is sought for the as-built Extension to the west of the existing factory premises