Permission for development consisting of the following: 1. Demolition of existing garage to side of existing dwelling house and demolition of existing boiler room to the rear, 2. Construction of a new single storey extension to rear of existing dwelling house, 3. Changes to existing elevations to facilitate new windows, doors and stonework, 4. Construction of new garage to rear of site, 5. Together with all ancillary site works atDecision record indexed
Permission for the construction of 96 no. residential units, a two storey creche facility and all ancillary site development works. The proposed development provides for the construction of 76 no. dwelling houses comprising 8 no. 4 bedroom semi-detached units (which have an option for an alternative house type design), 52 no. 3 bedroom semi-detached/townhouse units and 16 no. 2 bedroom townhouse units. The proposed development also provides for 20 no. 2 bedroom apartment/duplex units to be accommodated in 4 no. 2-3 storey apartment buildings. Access to the proposed development will be provided via the existing estate entrance from the Carrigane Road and internal road network of the Elmbury residential development and via a new entrance from the Carrigane road to the north of the site. Ancillary site development works include the partial demolition of an existing agricultural building and boundary wall to facilitate the construction of an extension of the existing shared pedestrian/cycle path on Carrigane Road. Other ancillary site development works include the provision of bicycle and bin storage facilities serving the proposed creche facility and apartment buildings.Decision record indexed
Waterways Ireland Shannon Navigation, downstream of Victoria Lock in the townland of Clonahenoge (river location adjacent to R42WF97), Co. Offaly
Essential maintenance works to the Shannon Navigation in accordance with Waterways Ireland’s statutory remit comprising of the following: (i) Removal of 710m3 silt build up, downstream of Victoria Lock. (ii) All works ancillary and incidental to the maintenance item referred to in (i) above. An Ecological Impact Assessment (EcIA) and Natura Impact Statement (NIS) has been prepared in respect of the planning application. The proposed maintenance works will require access through the front and rear curtilage of Victoria Lock House (RPS No. 38-04) and use of the field to the rear of Victoria Lock House beyond its immediate curtilage & access only through the east and south curtilage of Victoria Lock (RPS 38-05). No works or alterations to the physical structure of either the Lock House, its associated outhouses or to the Lock, are required as part of proposed maintenance works.Decision record indexed
Site to the east of Commons Road, in the townlands of Balreask Old and Duffsland, Navan Co. Meath C15 CKW2
The proposed residential development will consist of the construction of 96 no. dwellings, comprising: 80 no. two-storey houses (comprising a mix of terraced and semi-detached houses providing 72 x 3 bed and 8 x 4 bed houses) and 16 no. Duplex Units arranged within 2 no. two-storey blocks (comprising 8 no. 2-bed units and 8 no. 3-bed units). The extension of the permitted Phase 1 LDR2(a) link road (that forms a T-Junction onto Commons Road (to the west) in an easterly direction by c. 100.3m along the southern site boundary to deliver the Phase 2 section of the LDR2(a) link road that will ultimately connect to Trim Road to the east. An internal distributor road to serve the proposed development forms a junction onto the northern side of the proposed Phase 2 LDR2(a) link road. Associated road infrastructure work includes the delivery of access roads, pedestrian footpaths and cycle tracks, green verges and street lighting. Other associated infrastructure works include foul and surface water drainage; water supply; attenuation areas; ESB sub-stations; bin / bicycle store and landscaped open spaces (totaling 11,372 sq.m in area), including 5,853 sq.m of Public Open Space provision and a children’s playground; communal open space of 496 sq.m (associated with the proposed Duplex Units); boundary walls and fences. Provision is made for a total of 178 no. car parking spaces and 74 no. bicycle parking spaces together with all other associated site development works. This application is accompanied by a Natura Impact Statement. Significant further information/revised plans submitted on this applicationDecision record indexed
Within the townlands of Gilbertstown and Bendinstown, Co. Carlow, Ireland
A 10 year permission for a Battery Energy Storage system. The proposed development will comprise of the following; A Battery Energy Storage System with associated infrastructure including a new internal access road, approximately 50 metres in length to the permitted Garreenleen Solar Farm (Planning Ref. 22163); An approximately 90 metre 33kV double circuit underground cable grid connection to the permitted Bendinstown 110kV Substation (Planning Ref. ABP–313139), to be installed in an excavated trench including underground ducting; Modular office and welfare buildings; Six steel storage containers and all associated site development and reinstatement works. A Natura Impact Statement (NIS) has been prepared and is included with this planning application.Grounds not yet categorised
Development of an amendment to the permitted Planning Application (Planning Reference 24/60390) located on Bord Na Móna lands within the townlands of, Derries, Carrickobreen, Bunnahinly, Cloonbonny, Corralena, Kilgarvan Glebe, Ballynahownwood and Ballynahown, in County Westmeath. The proposed amendment which is the subject of this application is located on a site extending to 0.06 hectares in the townland of Corralena in County Westmeath. The proposed amendment will consist of; i.The development of a wayfinding Thematic Experience to enhance the permitted recreational shared cycle and walkway on Bord na Móna lands. The Thematic Experience will consist of a wayfinding landmark structure comprising a ring beam and wind vanes (40m2).Decision record indexed
Permission for development which consists of: We, O’Malley Construction Company Limited, intend to apply for planning permission to Galway City Council for development on a site located to the east of the Ballymoneen Road (L5024) in the townland of Ballyburke, Co. Galway. The proposed development is an amendment to the Maolchnoc Strategic Housing Development permitted under ABP-304762-19. The proposed development will consist of the following: 1. A change in the permitted apartment types on the 3rd floor of Apartment Blocks D, E and F from 6 no. 2-bed apartments and 6 no. 3-bed apartments to 18 no. 2-bed apartments and 3 no. 1-bed apartments (an additional 9 no. apartments in total). 2. Revisions to the floor plate of the 3rd floor of the permitted Apartment Blocks D, E and F including the omission of the permitted setback to accommodate the additional units. The proposed 3rd floor layout will match the floor plate of the lower floors. 3. Changes to the elevational treatment of Apartment Blocks D, E and F. 4. Minor amendments to the layout of the permitted central open space area including the addition of 3 no. car parking spaces to service the new apartment units. 5. Provision of additional bicycle parking spaces including accessible bicycle parking spaces. 6. The provision of photovoltaic panels at roof level of each of the apartment blocks. 7. All associated site works and ancillary services necessary to facilitate the proposed development.Decision record indexed
In the townland of Ballythomas West within the existing Eli Lilly pharmaceutical plant at Ballythomas East, Ballythomas West, Horsehill More North and Ballyvrin Lower, Kinsale, Co. Cork, P17 NY71
The development will consist of the provision of a single-storey building extension (gross floor area of approx. 172sqm and building height of approx. 6.6m) to an existing electrical load centre building (LC7) and associated site development works. The development will be located on a site that currently operates under an Industrial Emissions (IE) Licence (P0009-04) under Part IV of the Environmental Protection Agency Act 1992 ( as amended for the Protection of the Environment Act 2003). The site comprises of an establishment to which the Chemicals Act (Control of Major Accident Hazards Involving Dangerous Substances ) Regulations 2015 (S.I.209 of 2015) applies.Decision record indexed
The Holly, Waterrock Manor, Water -Rock (Townland),Midleton,Co.Cork
Mortimer We Re Back Limited intend to apply to Cork County Council for Proposed Planning Retention & Completion of modifications to 14 no. dwelling units, House numbers 10,11,12,13,14,15,16,17,18,19,20-21,24-25. Proposed Planning Permission amendments to 5 no. dwelling units, House Numbers 28-29-30 & 33-34. At The Holly, Water Rock Manor, previously permitted under Cork County Council, Large-scale Residential Development, Planning Reference 22/5839 & all associated site development works at The Holly, Water Rock Manor, Water – Rock (townland), Midleton, Co. Cork. The proposed retention & Completion of modifications includes for the following: • House Type L at Nos. 10,11 & 12, The Holly, Water Rock Manor to increase in overall floor area & alter previous granted elevations. • House Type U at Nos. 13,14 & No. 15, The Holly, Water Rock Manor to increase in overall floor area & alter previous granted elevations. • House Type U2 at Nos. 16,17,18 & No. 19, The Holly, Water Rock Manor to increase in overall floor area & alter previous granted elevations • Revised House Type at No. 20 & 21 The Holly, Water Rock Manor from a Semi-Detached House Type H to semi-detached Type B5. • Revised House Type at No. 24 & 25 The Holly, Water Rock Manor from a Semi-Detached House Type B1 to semi-detached Type B5. The proposed permission amendments includes for the following. • House Type L at Nos. 28,29 & 30, The Holly, Water Rock Manor to increase in overall floor area & alter previous granted elevations. • House Type C at Nos. 33 &34, The Holly, Water Rock Manor to increase in overall floor area & alter previous granted elevations.Decision record indexed
To retain (a) an existing slatted shed with underground storage tank (b) an existing underground storage tank within an existing shed. Permission is sought for (a) demolition of an existing hay shed and attached lean-to structures along with an existing underground storage tank (b) the construction of a new slatted shed with underground storage tank (c) the construction of a new agricultural machinery shed (d) new meal silo (e) bale storage area (f) new site entrance (g) along with connections to all site services and all other associated site worksDecision record indexed
Gortnalahee and Island Townlands, Carraig na bhFear, Co.Cork
Permission for the construction of a single storey dwelling, detached domestic garage, wastewater treatment system, borehole well and site development works including entrance, driveway and hard standingDecision record indexed
In the townlands of Atateemore or Blackneys Ballyhobuck Ballyrahan Carriganurra Charlestown, Davidstown Drumdowney Lower Drumdowney Upper Gorteens Grogan Kilmurry Nicholastown, Rathpatrick Scartnamoe Tinvaucoosh and Treanaree in County Kilkenny
A 10 Year Planning Permission for a solar farm with a total area of circa 189 hectares in the townlands of Atateemore or Blackneys, Ballyhobuck, Ballyrahan, Carriganurra, Charlestown, Davidstown, Drumdowney Lower, Drumdowney Upper, Gorteens, Grogan, Kilmurry, Nicholastown, Rathpatrick, Scartnamoe, Tinvaucoosh and Treanaree in County Kilkenny. The solar farm will consist of solar panels on ground mounted frames, 27 no. single storey electrical inverter/transformer stations, 5 no. single storey spare parts containers, 3 no. Ring Main Units, 5 no. weather stations, underground electrical ducting and cabling within the development site, private lands and within the L3429, L7523, L7563, L7469, L3407, L3414, L34144, L7466, L3406, L7483, L3415, N25 and N29 public roads to connect solar farm field parcels, security fencing, CCTV, access tracks, 7 no. watercourse/drain deck crossings and 4 no. horizontal directional drill crossings (under the N25 and N29 public roads and the Luffany River), temporary construction compounds, landscaping and all associated ancillary development and drainage works. Construction and operational access will be via 7 no. existing entrances from the L3429, L7469, L7466, L4783 and L34142 which will be subject to entrance upgrade works. Separate construction phase access options are proposed for Parcel 4 via Port of Waterford and the L4783. The operational lifespan of the solar farm will be 40 years and planning permission is requested for this duration. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the applicationDecision record indexed
Kelland Homes Ltd. and Evara Developments Ltd. wish to apply for permission for a Large-scale Residential Development (LRD) on a site located at Boherboy, Saggart, County Dublin. To the immediate north of the site is the Carrigmore residential estate, to the west are agricultural lands and a single dwelling, to the east is the Corbally residential estate and Carrigmore Park, while to the south is the Boherboy Road. The proposed development consists of 611 no. dwellings, comprised of 306 no. 2, 3, 4 & 4-5 bed, 2 & 3 storey, detached, semi-detached & terraced houses, 133 no. 1, 2 & 3 bed duplex units in 12 no. 2-3 storey blocks, and 172 no. 1, 2 & 3 bed apartments in 5 no. buildings ranging in height from 4-5 & 5 storeys. The proposed development also includes a 2-storey crèche (c.630m²). Access to the development will by via one no. new vehicular access point from the Boherboy Road, along with new vehicular connections to adjoining developments at Corbally Heath to the east and Carrigmore Green to the north. Ten no. houses in the south-eastern part of the site will be accessed from Corbally Glade to the east. The proposed development includes for pedestrian and cyclist connections throughout the proposed development and accesses into adjoining lands at Carrigmore Park, Corbally Heath and Corbally Glade to the east and Carrigmore Green to the north. Private amenity space for the residential units is provided in the form of rear gardens for houses and ground floor terraces / upper floor balconies for apartments and duplex units. The proposed development provides for a total of c.2.3Ha of public open space, and c.4,750sq.m of communal open space associated with proposed development. The proposed development also provides for (i) all associated site development works above and below ground, including surface water attenuation & an underground foul sewerage pumping station at the northern end of the site, (ii) public open spaces (c.2.3Ha), (iii) communal open spaces (c.4,750sq.m), (iv) hard & soft landscaping and boundary treatments, (v) surface car parking (861 no. car parking spaces), (vi) bicycle parking (711 no. bicycle parking spaces), (vii) bin & bicycle storage, (viii) diversion of all existing overhead ESB lines underground, (ix) public lighting, and (x), plant / PV panels (M&E), utility services & 8 no. ESB sub-stations, all on an overall application site area of c.18.7Hha. In accordance with the South Dublin County Development Plan (2022-2028), an area of c.1.03Ha within the site is reserved as a future school site.Decision record indexed
Permission for the construction of a single storey extension to the southside of the existing Creon Building and all associated site works at their existing Production Facility. The development is covered by an existing Industrial Emissions Directive Licence Number P1046-01. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with this application.Decision record indexed
Existing Castlebar - Dalton 110kV overhead power line, See Particulars for multiple townlands, Co Mayo
EirGrid PLC, with the consent and approval of the Electricity Supply Board (ESB), intends to apply for permission for works to uprate the existing Castlebar - Dalton 110 kV overhead line (OHL). The proposed development will take place within the following townlands: Liscromwell Carrowkeel Brees Breandrum or Windsor Prison South Facefield Aghalusky Drumnaslooeen Mossbrook Cloontybaunan Ballinagran Ballynastangford Lower Derrynamraher Rathredmond Birchfield Cappavicar South Dooros Garrywadreen Keelkill Drumadoon Drumneen Ballinvoash Legaun Ballynastangford Upper Gneeve Ballymacloughlin Drumneen (Prendergast) Lisnaran Ballyrourke Ballynew Drumcorrabaun Pollavaddy Eskerlevally Kilmacrade Moat Drumneen South Burris Garhawnagh Castlegar Barrackland Carrowgarve Crantahar Rinnahulty Knocknamoghalaun Drumkeen Carrowmore Rathduff Clare Derreen Heathlawn Kilbeg-Malone Prison North Coolaghbaun The Castlebar - Dalton 110 kV circuit is 27.8 km in length and runs between the existing Castlebar 110 kV substation in the townland of Aghalusky in central County Mayo, to Dalton 110 kV substation located in the townland of Clare, eastern County Mayo. The OHL has a total of 144no. supporting structures. The proposed development will comprise:? the replacement (“restringing”) of the existing OHL circuit conductor wires with a new higher capacity conductor between Castlebar 110 kV and the Dalton 110 kV substations;? the replacement of end mast in-situ at 1no. location, with a similar structure;? the replacement of angle masts in-situ at 6no. locations, with similar structures;? the strengthening of tower foundations at 4no. locations;? the strengthening of towers (i.e., member replacement) at 10no. locations;? the painting of towers at 10no. locations;? the replacement of tower bolts at 3no. locations;? the replacement of polesets at 48no. locations, with similar structures. The change in structures will result in standardised heights from 16 m to 24 m along the circuit. The majority of the height increases will be between 0.1 m and 2.0 m;? the replacement of insulating and ancillary hardware at all structure locations;? the replacement of earthwire between structure number 132 and structure number 144;? the replacement of stay wire / anchors and associated fittings at 16no. locations;? the replacement of crossarms at 58no. locations;? all associated temporary site development works to gain access to the existing structures incluDecision record indexed
CARRONTLIEVE CARROWMULLIN FIGARY, LISFANNAN LUDDAN & BALLYMACARRY LOWER, LIFFORD PO
A TEN-YEAR PLANNING PERMISSION FOR DEVELOPMENT AT THE EXISTING BUNCRANA WASTEWATER TREATMENT PLANT (WWTP) LOCATED AT RAILWAY ROAD, BALLYMACARRY LOWER, CO. DONEGAL; THE EXISTING FAHAN WWTP LOCATED AT CARRONTLIEVE, FAHAN, CO. DONEGAL; AND ALONG THE R238 REGIONAL ROAD WITHIN THE TOWNLANDS OF CARRONTLIEVE, CARROWMULLIN, FIGARY, LISFANNAN, LUDDAN, AND BALLYMACARRY LOWER. THE PROPOSED DEVELOPMENT WILL CONSIST OF: (1) UPGRADE WORKS TO THE EXISTING BUNCRANA WWTP REQUIRING AN EXPANSION OF THE EXISTING SITE TO INCREASE ITS DESIGN POPULATION EQUIVALENT (PE) FROM 13,200PE TO 17,700PE COMPRISING (A) CONSTRUCTION OF A SECONDARY TREATMENT TANK, BLOWERS AND SOUND ATTENUATION BARRIER, PUMP SUMP AND VENT STACK, FLOW METER CHAMBER, VALVE CHAMBER, ADMINISTRATION BUILDING, FLOOD PROTECTION WALL, 2 NO. PICKET FENCE THICKENER TANKS, A SITE DRAINAGE PUMPING STATION, INTERNAL SITE ACCESS ROAD, INTERCONNECTING PIPEWORK AND MANHOLES AND 4 NO. PARKING SPACES, (B) INTERNAL UPGRADES TO THE INLET WORKS BUILDING, INTERNAL UPGRADES TO THE CONTROL AND SLUDGE DEWATERING BUILDING, INTERNAL UPGRADES TO THE OUTFALL PUMPING STATION, REPURPOSING OF THE PRIMARY SETTLEMENT TANKS AS FINAL EFFLUENT BALANCING TANKS, RECONFIGURATION OF THE FLOW DISTRIBUTION CHAMBER AND INTERNAL UPGRADES TO THE SLUDGE HOLDING TANK, (C) REPLACEMENT OF THE EXISTING SITE ACCESS GATE WITH A PALISADE SECURITY GATE, (D) INSTALLATION OF ROOF MOUNTED SOLAR PHOTOVOLTAIC (PV) PANELS ON SOUTH FACING ROOFS OF THE EXISTING INLET WORKS, CONTROL AND SLUDGE DEWATERING AND PROPOSED ADMINISTRATION BUILDINGS, (E) DECOMMISSIONING AND DEMOLITION OF THE EXISTING SITE DRAINAGE PUMPING STATION, GAS HOLDING TANK, PICKET FENCE THICKENER AND SLUDGE DIGESTION TANK AND (F) ALL HARD AND SOFT LANDSCAPING WORKS INCLUDING SCREEN PLANTING AND ALL ASSOCIATED ANCILLARY WORKS INCLUDING SITE WORKS AND TEMPORARY WORKING AREAS, (2) UPGRADE WORKS TO THE EXISTING FAHAN WWTP TO CONVERT IT INTO A WASTEWATER PUMPING STATION (WWPS) COMPRISING (A) CONSTRUCTION OF A STORMWATER HOLDING TANK, PUMP SUMP AND VENT STACK, VALVE CHAMBER, INLET FLUME, SURGE VESSEL, WET KIOSK, 2 NO. CONTROL KIOSKS, CHEMICAL SKID, BUNDED CHEMICAL STORAGE TANK, EMERGENCY SHOWER, WELFARE UNIT, FLOOD PROTECTION WALL WITH GATE, INTERCONNECTING PIPEWORK AND MANHOLES, (B) DECOMMISSIONING AND DEMOLITION OF THE SITE GATE AND WING WALLS, SEPTIC TANK AND PRELIMINARY EQUIPMENT, (C) MATERIAL ALTERATION OF THE EXISTING SITE ACCESS TO INCORPORATE A NEW AND REALIGNED SECURITY MESH SITE GATE AND WINGWALLS ANDecision record indexed
The proposed development will consist of the following: 1) Continued use of the existing operational quarry (3.4ha) (granted under Plan File Ref. No. 20140). 2) Recommencement of extraction of a partially extracted area previously authorised under SU0057 (3.9 ha) to a final floor level of 148 mOD. 3) Recommencement of use for stockpiling of the remainder of the historic quarry floor (2.9 ha) previously authorised under plan ref. SU0057. 4) Lateral extension of the existing quarry including extraction of rock and all associated facilities/works over an area of c. 2 ha to a final floor level of 148 mOD. 5) The continuation of use of an existing pre-cast concrete manufacturing building, concrete batching plant, machine storage building and existing yard area (Granted under Plan File Ref. No. 21251). 6) Continuation of use of the existing settlement lagoons granted under Plan File Ref. No. 20140. 7) Construction of two new buildings: - Building 1 (1,595 m2): A shed to enclose the existing pre-stressed beds/moulds, complete with a store. - Building 2 (85 m2): Incorporating a store for two items of equipment associated with block making, compressor house, and substation with switch room for 3-phase supply, to be located adjacent to the existing ready-mix plant. 8) Importation of sand for use in concrete manufacturing. 9) Import approx. 70,000m3 (c. 125,000 tonnes) of Article 27 clean, uncontaminated soil and stone byproduct (a non-EIA scheduled activity that does not require waste authorisation), to construct a screening berm to the south of the extraction area and to restore part of the application area following the completion of extraction. 10) All related ancillary development and associated site facilities/works including processing (crushing, screening and washing) and stockpiling of materials; workshop, site office, block yard, and all other related activities. The proposed development is within an overall application area of c.20 hectares and is for a total period of 25 years, with an additional 2 years for final site restorationDecision record indexed
Permission for development to construct a dwelling house and shed/garage with a wastewater treatment unit & percolation area including all necessary site worksDecision record indexed
25 and 26 Copper Point, Skull Townland, Schull, Co. Cork
Construction of 2 no. Two storey (3 Bed) Dwellings, 4 No. car parking spaces and all associated site works (previous permissions 05/1839, 08/1110, 13/426).Decision record indexed
1. An overall planning application site area of c. 6.3 hectares consisting of a proposed bio-renewables production facility, buffer screening, ancillary facilities and site access via the existing permitted quarry entrance. 2. The proposed bio-renewables production facility (incorporating anaerobic digestion) compound will cover an area of c. 4 hectares. The production facility will convert feedstocks to end of line co-products, namely bio-methane (gas), compressed bio-methane (bio-CNG), carbon dioxide (CO2), electricity (green), organic fertilisers (pelleted) and water, with integrated solar energy generation. The adjacent Roadstone Killough Quarry plant will utilise the electricity, bio-methane and water. Pelletised fertiliser will be available for supply to local agriculture and traders off-site. CNG and CO2 will be pressurised and stored for ongoing draw-off by tankers to points of re-use off-site. Demolition of existing quarry store building (c. 158m²) to facilitate the proposed development. 3. The facility will consist of the following elements to be constructed: a) two-storey administration building with (gross floor area 664m² and 8.15m in height) to accommodate reception and storage areas, canteen, laboratory, first aid room, control room/electrical switch room, storage room, toilets, offices, conference room, training room and kitchenette, and roof solar panels 315m²; b) dry matter reception building (gross floor area 5,215m² and 12.7m in height) with roof solar panels 4,000m²; c) workshop building (gross floor area 122.1m² and 8.9m in height) to accommodate workshop and internal gantry crane, store and office at ground level and office at mezzanine level; d) bio-conversion building (gross floor area 3,257m² and 12.5m in height) with roof solar panels 2,400m²; e) pre-treatment, equalisation and gas upgrading building (gross floor area 5,685m² and 12m in height) to accommodate pre-treatment & equalisation area (3,527m²), utilities area (376m²), heat recovery plant area (361m²), water treatment recovery area (316m²), and gas upgrading facility (1,105m²) with roof solar panels 3,850m²; f) digestate handling building (gross floor area 692m² and 8.6m in height) to accommodate palletiser station/packing station area (150m²), solid dryer/vacuum evaporator area (392m²) and nutrient adjustment facility (150m²); g) warehouse storage building (gross floor area 158m² and 11.2m in height); h) bio-filling station building (gross floor area 300m² and 9.75m in hGrounds not yet categorised
Tobar Bhreandáin Water Treatment Plant, Townland of Baile an Fheirtéaraigh, Ballyferriter
Uisce Éireann intend to apply for A TEN YEAR PERMISSION for development in the townland of Baile an Fheirtéaraigh, Ballyferriter, County Kerry. The development will consist of the following: - 1no. twin-celled precast concrete treated water storage tank and associated retaining wall; -Decommissioning of the existing water reservoir. The top slab shall be removed and infilled with stone chip; -1no. above-ground pump kiosk; - 1no. fully buried valve chamber; - 1no overflow outlet and associated de-chlorination chamber and below-ground chamber; - Installation of by-pass chamber and hydrant for emergency emptying/refilling of the storage tank; - 2no. ground mounted solar photovoltaic panels (one array measuring 24m2 and the other measuring 33m2, all solar panels will be 2.0m above ground level); and -All associated development required to facilitate the proposed development, including associated underground cabling and pipework; extension to existing hard surfaced internal circulation area, internal site road, lighting and drainage, and landscaping.Decision record indexed
Townland of Curraghboy, or Woodfield, Clara Co. Offaly
• 4 no. playing pitches (Pitch 1 and 2: synthetic all-weather playing pitches with floodlighting, and Pitch 3 and 4: grass playing pitches); • 1 no. grass training/warm-up pitch;• A single level facilities building (approximately 865 sq m gross floor space) with rooftop photovoltaic solar panel array (224 sq m) and associated building signage (4.5 sq m), to incl. entrance lobby, function room with servery and reception area, office/meeting room, weight/training room, multipurpose community room, medical/first aid room with toilet, equipment store, 5 no. spectator toilets (3 no. universal accessible), circulation corridor, universal access toilet, universal access change room with shower and toilet, plant room, storage/kit room, 2 no. referee facilities with shower and toilet, 2 no. change rooms with showers and toilets, and 6 no. change rooms with toilets; • 123 no. vehicle parking spaces arranged in 2 no. car parking areas with site lighting (12 no. EV, 6 no. disabled, 105 no. regular), dedicated vehicle set down area, dedicated coach/bus set down area, and coach/bus parking area; and • Hard and soft landscaping (incl. enhanced boundary treatment planting and ecological buffer biodiversity corridors), access road and vehicle circulation, pedestrian walkways, site lighting, services (incl. tertiary waste water treatment system comprising of proprietary secondary wastewater treatment plant with pumped discharged to raised tertiary treatment modules polishing filter bed, and SuDS based surface water management system comprising permeable paving, grasscrete, a series of stormwater bioretention swales/detention basins located on the site, hydrocarbon interceptor, flow control hydrobrake controlled outflow discharge to drainage ditch within site, and ultimately the Gageborough River), and all other ancillary and associated site development works above and below ground level. Access will be via a new vehicular entrance from the L6045 Local Road with associated road upgrade works to accommodate development related traffic movements at this site of approximately 11 hectaresGrounds not yet categorised
For the construction of 39 no. residential units on an infill development site in the townland of Treanrevagh, Mountbellew, Co. Galway. The development will consist of: •1 x Type A Block of 4 no. 2 bed 2 storey terraced houses (4 no. units), •2 x Type B Block of 3 no. 2 bed 2 storey terraced houses (6 no. units), 1 x Type C Block of 2 no. 3 bed 2 storey semi-detached houses (2 no. units), •1 x Type C1 Block of 2 no. 3 bed 2 storey semi-detached houses (2 no. units), •1 x Type D Block of 4 no. 2 bed 2 storey terraced houses (4 no. units), •1 x Type D1 Block of 4 no. 2 bed 2 storey terraced houses (4 no. units), •1 x Type E Block of 5 no. 2 bed terraced houses (5 no. units), •1 x Type F Block of 3 no. 2 storey terraced houses, comprising 2 no. 2 beds and 1 no. 3 bed (3 no. units),•1 x Type G Block of 5 no. bungalow terraced houses, comprising 4 no. 2 beds and 1 no. 3 bed (5 no. units), •1 x Type H Block of 4 no. 2 bed bungalow terraced houses (4 no. units). The proposed development includes; •Provision for pedestrian and vehicular connection onto the R358 College road, via the permitted/existing access road and junction to the south, •Connection to a proposed temporary on-site proprietary treatment plant and pumping station, together with the provision for tertiary pre-treatment of effluent, prior to discharge to the Uisce Éireann sewer network and Mountbellew Wastewater Treatment Plant (WWTP). The proposed development is also designed to provide for an option for direct discharge of effluent to the Uisce Éireann sewer network once the upgrade to the Mountbellew WWTP is operational. •The proposed development includes for connection to the public mains water supply, surface water drainage arrangements, provision of public open space areas with a playground, private open space areas, internal roads, footpaths, bicycle parking, public lighting, landscaping and boundary treatments, together with all associated site works and services. A Natura Impact Statement will be submitted to the planning authority with this application. Gross floor space of proposed works: 3221.40 sqmDecision record indexed
Bord Na Móna lands within the townlands of, Knockballyboy Clonad Rathfeston Gorteenkeel Island Clonarrow or Riverlyons Drumcaw or Mountlucas Esker Beg Killeen Ballyhugh Mullalough or Cavemount, Coole Toberdaly Newtown Ballycon Esker More Colgagh an
The development of a recreational shared cycle and walkway located on Bord Na Móna lands. The development proposes the following: a) The delivery of a shared cycle and walkway on Bord na Móna lands. This will include the repurposing of 18,958 meters of existing former rail bed and 827 meters along pre-existing machine access routes. b) The proposed shared cycle and walkway will connect into the existing Grand Canal Way within the townlands of Coole and Knockballyboy; the Public Amenity Facilities at Mountlucas Wind Farm within the townlands of Clonarrow or Riverlyons and Drumcaw or Mountlucas; and the Cloncreen Wind Farm Amenity Track within the townland of Clongarret. c) The construction of car and / or bicycle parking facilities at a number of gateway locations along the proposed route and the provision of EV Charging spaces at the Gateway locations. This will include; i. 3 Type 3 Gateways, ii. 2 Type 4 Gateways, iii. 7 Minor Rest Points d) Upgrade works to 2 no. local access road crossings, and 6 no. agricultural crossings. e) Upgrade works to the Croghan Tippler Bridge (BNM Ref 37-109) and the Ballycon Rail Bridge (BNM Ref 37-112). f) The construction of a new pedestrian and cycle bridge extending to 30.5 meters spanning the Grand Canal within the Coole townland, located adjacent to the existing Grand Canal lift bridge (BNM Ref 37-05). g) The erection of wayfinding and interpretative signage at Gateway locations along the route. h) The implementation of Sustainable Drainage Systems (SuDS) nature-based drainage proposals at the Gateway locations to cater for surface water drainage at car park locations. i) Fencing and screening will be erected where required for biodiversity reasons which will include 7,636 meters of ecological screening. j) All other ancillary and associated site work. This Planning Application is accompanied by a Natura Impact Statement (NIS)Decision record indexed
For alterations to previously permitted (Planning Ref. 18/734) and partially constructed house no’s 93-110, 119-120, 139-164, 167-168 & 177-182, consisting of changes to window details and façade treatment. Change of house types (Planning Ref. 18/734) partially constructed house no’s 129-130, 165-166 & 169-176 at Copper Close, Kilbarry, Waterford. Along with minor amendments to the internal road alignments and the provision of a new pedestrian access onto the LIHAF Road.Decision record indexed
REAR OF ST MARY TERRACE AND ST MARY ROAD, TOWNLAND OF INCH, KILLARNEY
REF. 22/212 TO CONSTRUCT A TRADITIONAL-STYLE, SINGLE STOREY DWELLING HOUSE, REFLECTING THE DESIGN APPROVED UNDER OUTLINE PERMISSIN ABP-314276-22. THE DEVELOPMENT WILL INCLUDE ALL ASSOCIATED SITE WORKS, UNDERGROUND SERVICE CONNECTIONS, LANDSCAPING AND SURFACE WATER MANAGEMENTDecision record indexed
Withing the townlands of Agall and Glaskill, Screggan, Co. Offaly
For development at this site Agall Quarry, currently permitted under planning references ABP 19.SU.0131 and ABP 19.QD.008 which is located within the Townlands of Agall and Glaskill. The development will consist of further quarry development concerning an authorised quarry, registered as QY28, authorised under substitute consent ABP Ref. 19.SU.0131 and extended under ABP Ref. 19.QD.0008 to include: 1. Extension of the area of the quarry into known aggregate reserves by circa 6.96ha to a depth of 63mAOD. 2. Provision of boundary berms, planting and landscaping generally to the north-west of the proposed extension area together with security fencing; 3. Provision of an access route to the new extraction areas; 4. Re-commencement of quarrying works within circa 3.81ha of the lands subject to substitute consent under ABP Ref. 19.SU.0131 to a depth of 63mAOD, 2m deeper than existing quarry floors permitted under ABP Ref. 19.QD.0008; 5. Continuance of use of existing established pit infrastructure (including mobile processing plant, machinery, fixed plant and associated sheds, vehicular entrance, office/welfare facilities, stockpiling areas, water supply, carpark, wheel wash, haul routes and other ancillary infrastructure); 6. Phased restoration of the site; 7. All associated and ancillary works, including dry screening and short-term stockpiling of aggregates, over an application area of 17 ha; 8. A planning permission of 30 years is being sought for the completion of the proposed development. Accordingly, this permission also seeks to amend Condition 3 of ABP Ref. 19.QD.0008 to facilitate the continuation of use of established pit infrastructure for a period of 30 years from the date of any permission for the proposed development. An Environmental Impact Assessment Report (‘EIAR’) will be submitted to the Planning Authority with the applicationGrounds not yet categorised
The construction of a vehicular entrance and dwelling house, connection to mains services together with all associated site worksDecision record indexed
At Ballygiltenan North Caheragh Glin Demesne, and Killacolla (Barker) (Townlands), Glin Co. Limerick
A 10 year permission for (1) the construction of a wastewater treatment plant at Caheragh, Glin, including rising mains discharge chamber, inlet works with screen, flow distribution chamber with flow monitoring, 2 no. primary settlement tanks with splitter chamber, sludge pumping station and sludge holding tank, storm storage tank, tidal tank, control building, surface water drainage network including swale linking to existing drains, site lighting (both task lighting and road lighting), boundary fencing, landscaping and biodiversity enhancements, solar panels on block mounted frames, and entrance scheme signage. Access to the wastewater treatment plant to be provided via a proposed new entrance onto the public road network to the south (L-6106), below ground interconnecting pipework; (2) the construction of a wastewater terminal pumping station (TPS) including: underground storm storage tank, pump sump chamber, flow meter chamber, overflow chamber with screen, 2 no. valve chambers, bauer connection chamber, wet and control kiosks, vent stack, landscaping to include redesign of Town Park public amenity area, removable bollards, the temporary removal and re-instatement of a portion of the wall, and all ancillary site development works at Ballygiltenan North, Glin; (3) Foul water rising main between the wastewater treatment plant site and terminal pumping station comprising the laying of pipework on private land and within the Coast Road (N69), including along N69 bridge crossing the Glencorbry River; (4) Gravity storm overflow pipeline from terminal pump station to a new outfall in the maritime area comprising the laying of pipework within the town park and Coast Road (N69) including a rodding and scour chamber;(5) the construction of a new effluent outfall gravity pipeline from wastewater treatment plant site to a new outfall in the maritime area comprising the laying of pipework on private land and within the Coast Road (N69), including along N69 bridge crossing the Glencorbry River; (6) partial demolition/decommissioning of the existing tidal tanks and decommissioning of the existing outfall pipeline assets landwards of the High Water Mark (HWM) within the Town Park public amenity area; (7) Proposed upgrades to underground foul sewer network at the junction of Mary Street and Coast Road (N69) comprising the laying of new sewer pipework to the terminal pumping station and; (8) all associated site development and site excavation works above and below grounDecision record indexed
For development. The development consists of the backfilling of a permitted sand and gravel pit (Plan File Ref. No 21204) and agricultural land with article 27 by product soil and stone; all associated ancillary facilities, including, internal haul roads, wheelwash, small portacabin office/canteen and chemical toilet all within an application area of c.8.2 Ha. The applicant is seeking a 20-year permission for infilling and associated activities, with an additional 2 years for final site restoration,Decision record indexed
Townland of Clonarrow, or Riverlyons, County Offaly
A) The erection of a temporary 100m high lattice type meteorological mast which will be secured to ground anchors by stay wires and will include instruments for measuring local climate conditions, services, and associated equipment; b) A fixed red aviation light will be fitted near the top of the lattice section of the proposed meteorological mast; c) Bird flight deterrent markers fitted to each stay wire at approximately 10m intervals; and d) All associated ancillary works. The temporary meteorological mast development will remain in position for a period of 5 years after which the mast, instruments, services, equipment, and all associated ancillary works will be removed. The purpose of the meteorological mast is to accurately measure the weather conditions at this siteDecision record indexed
We, Sollugh Ltd., intend to apply for Planning Permission for development in the townland of Mullanadarragh, County Leitrim. The development will consist of: • A c. 10MW solar farm comprising ground mounted solar photovoltaic panels. • String Invertors located on solar tables. • 3 No. Containerised medium voltage cabin with switch gear, protection equipment and transformers. • 20kV substation and UGC grid connection to Carrigallen 38kV substation in the public road. • 1 No. spare parts storage container. • Provision of site access tracks and upgrading of existing tracks. • Upgrading of hardstanding area to provide materials storage. • All ancillary development such as fencing, CCTV and drainage infrastructure. The planning application seeks a 10-year planning permission for the construction of a solar PV energy development with an operational life of 40 years. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application is subject to section 34D of the Planning and Development Act 2000, as amended. Where a notice is given under section 34D(b) of the Planning and Development Act 2000, as amended, the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply. The planning application may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy, at the offices of the Planning Authority during its public opening hours. A submission or observation in relation to the application may be made in writing to the Planning Authority on payment of the prescribed fee (€20) within the period of 5 weeks beginning on the date of receipt by the authority of the application, and such submissions or observations will be considered by the Planning Authority in making a decision on the application. The Planning Authority may grant permission subject to or without conditions or may refuse to grant permission.Decision record indexed
Permission for the following Large Scale Residential Development (LRD) consisting of the construction of 302 no. residential units, 1 no. creche, 2 no. ESB substations and all associated development works including footpath/cycle path extensions and road improvement works along the R639. Permission for internal connections, crossings, footpaths and cycle paths, car and bicycle parking, drainage, fencing and boundary treatments, bicycle and bin stores, lighting and landscaping/amenity areas. Permission for the demolition of walls currently traversing the site as well as removal of vegetation and scrub and the repurposing of a redundant bund. Access to the proposed development is provided to the west of the site [constituting a relocation of the existing access to the site] on the Dublin Road (R639). A Natura Impact Statement is submitted to the Planning Authority with this application. The application may be inspected online at the following website set up by the applicant: www.ballynamonalrd.ieDecision record indexed
For a period of 10 years to construct and complete a solar PV energy development with a total site area of 45.9 hectares, comprising of the construction of PV panels mounted on metal frames, transformer stations, GRP unit, internal access tracks, perimeter fencing with CCTV cameras and access gates, electrical cabling and ducting, temporary construction compound, landscaping and all ancillary infrastructure and associated works. The solar farm would be operational for 35 years. The export capacity to grid is estimated to be c. 35MW MEC. A Natura Impact Statement (NIS) has been prepared in respect of this applicationGrounds not yet categorised
Of elevational changes to house no’s. 1-10, 11-12, 29-30, 39-44, 53-54, 71-74 & 85-90 (A, B, C & D Types) consisting of changes to window details and façade treatments. Minor amendments to the internal road alignments and the provision of a new pedestrian access onto the LIHAF Road. PLANNING PERMISSION for changes to the previously granted planning permission ref. No: 18/735. The Proposed changes consist of; Alterations to previously permitted and partially constructed house no’s. 55-62, 69-70, 75-84, 91-92 consisting of changes to window details, façade treatments (on A, B, C & D Types) and reduction of roof pitches (on C & D Types).Alterations to previously permitted and partially constructed house no’s. 63-68 from 6 no. 2 Storey, 3-Bed Semi detatched houses (A&B Types) to 6 no. 2 Storey, 4-Bed Semi detatched (C1 Types).Decision record indexed
1. Extraction of sand and gravel (dry working) over a lateral extension extraction area of c. 4.2 hectares adjacent to the existing sand and gravel pit development permitted by planning permission KA/141129 (ABP PL17.245257) with access gained from the existing pit. 2. Restoration of the lands will form part of the overall adjacent sand and gravel pit restoration site, returning the lands to a combination of agricultural grazing and beneficial ecological habitat. 3. The development will be commensurate with the life of existing site permission (P. Ref. KA14/1129 & ABP PL.17.245257) which is due to expire in December 2036. 4. All associated site ancillary works within an overall application area of c. 5.8 hectares. An Environmental Impact Assessment Report (EIAR) has been prepared in respect of this planning application. Significant further information/revised plans submitted on this applicationDecision record indexed
Planning Permission for development in the townland of Creggyconnell, Rosses Point, Co. Sligo. The development will consist of the erection of a 36m high lattice support structure carrying antennas and dishes together with associated ground-based equipment all enclosed in security fencing, upgrade of an existing access track and the provision of a new access track, proposed site access taken from an existing site access from the L-7311 and all ancillary site works.Grounds not yet categorised
Glanagow and Corkbeg (townlands), Whitegate, Co. Cork, within a total site area of 3.15 hectares within the curtilage of the Whitegate Power Station.
Bord Gáis Energy Limited intend to apply for planning permission for development at Glanagow and Corkbeg (townlands), Whitegate, Co. Cork, within a total site area of 3.15 hectares within the curtilage of the Whitegate Power Station. The proposed development consists of a 10 year Planning Permission for a Grid Stability Service Development including the provision of a synchronous condenser enclosed within a building of approximately 552m² gross floor area and approximately 12.1 metres in height, associated plant and apparatus including 8 no. modular electrical control containers with a combined gross floor area of approximately 238m², 3 no. transformers, external cooling equipment, an external circuit breaker, fuel tank and containerised emergency diesel generator with a gross floor area of approximately 30m². The proposed development also seeks permission for the provision of a 220kV electrical cabling connection to the nearby Glanagow 220kV substation, lightning protection masts, lighting, security fencing, the provision of a new access track and localised widening of existing access road, the removal of 4 no. existing modular buildings (currently in use as offices, staff and storage facilities) and associated foundations, and all associated ancillary site and development works.Decision record indexed
The construction of a new dwelling house, new gated entrance, a wastewater treatment plant followed by a Ter 3 Package Tertiary unit and all ancillary site worksGrounds not yet categorised
Upgrading of an existing septic tank system to include the construction of a new tertiary wastewater treatment system to serve an existing dwellingDecision record indexed
Remove existing front boundary wall and construct new front boundary wall and site entrance together with all ancillary site works and servicesDecision record indexed
For the continuance of use of existing site infrastructure, including all processing equipment and the extension of the extraction area at Ballyburn Pit (currently permitted under planning reference 05/2091 and ABP PL09.220222) which is located within the Townlands of Ballyburn Upper, Gorteenvacan, Knockbane, Castledermot, Co. Kildare. The proposal includes for the extension of the extraction area into agricultural lands to the south with known quality reserves of sand and gravel. The extension will cover an area of 28.3 hectares (ha), with the overall application area covering 37.8 ha, the balance comprising continuance of use and restoration. The Proposed Development will seek to extract sand and gravel reserves (circa 3,000,000 tonnes over the lifetime) to a final pit floor of 71m OD, ensuring a finished pit floor above the winter water table. The Proposed Development seeks the continuance of use of existing established pit infrastructure (including processing plant, machinery, entrance, office/welfare facilities, carpark, wheel wash, weighbridge, haul routes and other ancillary infrastructure). The Proposed Development also includes provisions for the restoration of the Site, which will include the importation of circa 1,125,000 tonnes of clean uncontaminated soil and stone by-product materials to compliment overburden originating from within the Site. A planning permission of 15 years is being sought for the completion of the Proposed Development. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application. Revised by Significant further information which consists of of a reduction of estimated extraction tonnages of sand and gravel reserves to circa 2,664,392 tonnes and reduced importation for restoration to circa 975,259 tonnes of clean uncontaminated soil and stone by-product materials due to extraction area revisions, archaeological information resulting from geophysical surveys/archaeological testing and a revised restoration plan has been presented in the form of an updated NIS, addendums to the EIAR and Revised PlansDecision record indexed