Planning Permission is sought for new mains sewerage connection for existing bungalow
Planning permission is sought for the construction of 3no. One & Half Storey Dwellings, connections to mains sewerage & water services, 2no. new entrances and all associated site development works at Shillelagh Road, Tullow, Co, Carlow.
Permission for the construction of a dwelling house with attached garage and pergola, entrance, septic tank, percolation area, and ancillary services
To construct a single storey extension to the front and side of existing part single storey, part two storey dwelling, relocation of existing entrance, upgrade of existing percolation area and all associated site works
Permission is sought to retain floor slab as constructed and full planning permission is sought for the completion of dwelling house as granted under PL Ref:17/180, full planning permission is sought for the alteration of site boundary as granted under same, all ancillary site works and services
The replacement of the existing derelict house in accordance with CCDP policy 3.1.16.11. The proposed development includes the construction of a replacement Two-Storey dwelling, demolition of derelict dwelling, septic tank & percolation area, bored well and all associated site development works. Retention Permission is sought for the existing mobile home on site in use as temporary accommodation for the duration of construction work
Permission for new private dwelling with detached garage, private well, wastewater treatment unit and percolation area, new entrance and all associated site works
(1) extend, renovate and convert part of an existing single-storey agricultural outbuilding into a 2 bedroom, self-catering, short-term holiday-let unit, and (2) to replace existing domestic septic tank with a new onsite waste-water treatment unit, together with all associated site works
Permission to construct a dwelling house with services, domestic garage and all associated site works
Permission sought for the construction of a dwelling house, entrance, connection to public sewer and all ancillary services and associated site works
A single storied dwelling, garage, new entrance/driveway, effluent disposal system to comply with current EPA code of practice, provision of a well and associated site works
Revised Plans the construction of a Single-Story Dwelling at Butlersgrange, Tullow, Co. Carlow. (previous planning reference 2360316)
The construction of a Single-Storey Dwelling, wastewater treatment system, connection to mains water, splayed entrance and all associated site development works
Permission is sought to retain partially constructed dwelling house as constructed and full planning permission is sought to install a proprietary treatment system and associated percolation area and full planning permission is sought for the completion of the dwelling house all ancillary site works and services
Construction of a part two storey, part single storey dwelling, attached garage, new site entrance, wastewater treatment system to current EPA standards, private well and all ancillary site works
A garage and concrete apron
To (1) construct a four bedroom dormer bungalow and single storey domestic garage and all associated site works. All to be serviced by suitable effluent treatment system. (2) Close existing agricultural entrance and alter existing access lane-way to existing farm yard. Provide new agricultural entrance to existing farm yard and all associated site works
A ten-year planning permission for a solar energy development with a total site area of 77 hectares comprising (i) photovoltaic solar panels on steel mounting frames; (ii) electrical inverters; (iii) electrical power stations; (iv) underground electrical and communications cabling; (v) containerised battery energy storage facility; (vi) the upgrade of 2 no. disused site entrances, decommissioning of 2 no. existing site entrances and development of 1 no. new site entrance; (vii) on-site access tracks; (viii) a temporary construction compound; (ix) security fencing and security gates; (x) pole-mounted security cameras; and (xi) all associated site and ancillary site development, landscaping and reinstatement works. The operational lifetime of the proposed development is 35-years. The planning application is accompanied by an Environmental Impact Assessment Screening Report and an Appropriate Assessment Screening Report
For the retention of a biomass boiler and storage silo facility and all associated works
To construct 3no. additional mushroom growing tunnels, hardstand area and all associated site works at existing mushroom growing facility
Of the relocation of the following: a treatment system and percolation area, 3 no. mushroom growing tunnels and packing room, granted under PL17/305 and planning permission to construct 3 no. additional mushroom growing tunnels and all associated site works
A single-room dog grooming studio in the yard behind the existing dwelling house, a sign at the existing site entrance and associated site works.
The development will consist of the filling of lands with soil & stone material (application area 3.0 hectares, volume 80,000 tonnes over 7 years) to restore/reinstate quarry lands and all associated ancillary works. The planning application is accompanied by a Natura Impact Statement (NIS)
Alterations to previously approved planning reference 25/60008 (single storey extension to provide additional accommodation to our existing Childcare Facility). The alterations consist of a revised extension layout to include revised elevations, reduced extension floor area, internal alterations to the existing building and all associated site works
Development for a single storey extension to provide additional accommodation to existing Childcare Facility and all associated site works
For materials recovery and transfer facility consisting of a sorting building, hardstand area, portable office & canteen, portaloo toilet, wheelwash, weighbridge and all associated ancillary works
No 1. Retention Permission for a mobile home used as a dwelling for a period not exceeding 3 years, No. 2. Permission for demolition of an existing single storey dwelling in ruins, permission for the construction of a replacement single storey dwelling, connection to services, septic tank, & percolation area and all associated site works
1. retention permission for a domestic shed as constructed, 2. permission for completion of same and all associated site works
For an unauthorised mobile home used as a dwelling, connection to services and all associated works
Permission for the removal of 3 No. single storey prefabricated units (total floor area =184 sqm), decommissioning of existing septic tank and percolation area, and the construction of a single storey 2 No. Classroom Special Education Unit (floor area = 439 sqm) to the rear / side of existing single storey School Building (floor area = 1,412sqm), provision of a new proprietary waste water treatment system and sand polishing filter, together with an enclosed external soft play area, sensory garden, 6 no. additional car parking spaces, and all associated site works.
The partial demolition and the refurbishment including external alterations to existing dwelling. The construction of one & half storey type extension to said dwelling, the installation of wastewater treatment system and all associated siteworks
The change of usage from holiday home use to permanent residential use
10-year permission. The development will consist of the construction of (i) a Solar PV development comprising photovoltaic panels laid out in arrays over a total development site area of ca. 91.2ha, (ii) the construction of a 38kV substation building ((6.1m (h) x 20.9 (l) and 7.3 (w)) and associated compound area, a transformer unit (ca. 6m x ca. 3.6m) and associated bund, (iii) 352 number Battery Energy Storage System units comprising 22 modules (ca. 21.9m x ca.5.2m) each with 16 number cabinet units within each module and (iv) all ancillary development including 15 number transformer integrated units (ca. 10.5m x ca.2.7m), 12 number inverter units (ca. 6.0m x ca.2.4m), 7 number CCTV cameras mounted on 4m high poles, a 3m high acoustic barrier, with berm and fencing, perimeter security fencing, site access, site egress and all ancillary works and services. The development will have a 40-year operational lifetime. Permission currently exists for a PV development on ca/65.6ha of the site (Planning Permission Ref No. 21/23) that will be superseded by this application if approved
Extension of duration for PL20/161 Construction of a two-storey dwelling, appropriate wastewater treatment system and percolation area, bored well, new entrance with splayed wing walls, single storey domestic garage and all ancillary site works and landscaping
For the construction of a two-storey dwelling, appropriate wastewater treatment system and percolation area, bored well, new entrance with splayed wing walls, single storey domestic garage and all ancillary site works and landscaping
To amend Condition 18 of previous planning permission, Ref. PL06/701, to allow for the change of use of the previously authorised guesthouse use floor area, to be incorporated into the overall private residential use floor area, of the existing dwelling house onsite
The development will consist of:- Internal reconfigurations at ground floor level to provide an additional 11 no. bedrooms, enlarged beauty salon, treatment room, nurses station and relocated toilets, stores and staff areas. Ancillary alterations to elevations and all associated site works and services.
Demolition of existing rear extension, demolition of existing side extension, demolition of existing chimneys, demolition of 2 existing sheds, removal of existing mobile home, blocking up existing window to front elevation, construction of new rear extension, internal layout changes, new windows to front elevation, new domestic garage, removal of existing septic tank, new wastewater treatment unit & soil polishing filter, and associate works
10 Year permission for development consisting of the construction of a Solar PV development comprising photovoltaic panels laid out in arrays over a total development site area will be ca. 65.6 ha, the construction of a 38kV substation (ca 114.4m2 x 4.75 tall) a transformer unit (ca. 18m2 x 4m tall) and associated bund (ca. 55m2), along with ancillary development including; 24 no. Power Hubs (ca. 15.25m2 x 2.4m) which incorporate an inverter and a transformer, 1 no. single storey communications building (11.1m2 x 2.5m), 1 no. single storey client side sub-station building (15.25m2 x 2.9m), 1 no. single storey equipment storage building (7.5m2 x 2.7m), 10 no. CCTV cameras mounted on 4m high poles, perimeter security fencing, site access, site egress and all ancillary works. Permission currently exists for a PV development on part of the site (Planning Permission Ref No. 16325). An Natura Impact Statement will accompany the planning application.
Construction of a two storey extension to the side of my existing dwelling house, upgrade existing wastewater treatment system and all associated site works
Permission to construct a two storey dwelling, detached garage, new entrance, bored well, waste water treatment system & percolation area with all associated site works
(a) Retention permission of alterations to permitted planning permission No. 04/133 for bungalow and domestic garage/shed. Alterations include revised external window arrangement to dwelling house, alterations to house position and entrance position on site layout and retention of domestic garage/shed with concrete yard as built. (b) Planning permission is also sought for conversion of existing attic storage space to habitable space together with installation of new windows in each gable end of dwelling house
The development will consist of: Construction of a single storey agricultural shed building and all associated siteworks
PL18-296 for the restoration, part demolition and extension to the rear of an existing house, along with the installation of a new sewage treatment sewage, percolation area and all associated site and landscaping works
The construction of a single storey dwelling, new site entrance, wastewater treatment system to current EPA standards, private well and all ancillary site works
For the demolition of a wind turbine of 150kw that was erected with planning ref. number 09125 and apply for Planning Permission to erect a 500kw wind turbine, located at the south-east corner of our land, with a hub height of 65 meters and a blade diameter of 44 meters, with underground ducting connecting to existing ESB substation and all associated site works
Renovate existing cottage including a single storey extension, new bored well, septic tank, percolation area, upgrade existing entrance and all associated site works
The installation of a 15 metres monopole carrying antennas, Dish, RRU's (Remote Radio Units), Cabinet, Fencing and Access gate together with Ground-based equipment and all associated site development works for wireless data and broadband services
Retention permission for alterations to existing dwelling house to include an attic conversion at first floor level, a single storey extension to the front and rear and an attached double garage to the side. Retention is also sought for an existing second entrance and planning permission to decommission this entrance and all associated site works
Permission for a 10 year planning permission for the development of a synchronous condenser grid support facility, which will connect to the adjoining ESB Kellistown Electricity Substation. The proposed development will have a projected life span of 50 years. At the end of life the proposed development can either be decommissioned or refurbished to extend its life. The development is to be located within a site compound c. 1 ha. It will regulate reactive power on the electricity network and will consist of the following elements: a building (c. 540 sqm. c. 10m high) to house equipment including a synchronous condenser with flywheel, lube oil skid, air compressor and pumps. Equipment to be located outside the footprint of the building but within a fenced compound will include cooling equipment (c. 160 sqm. c. 3m high) 6 No. modular containers to house electrical and control equipment (total area of c. 195 sq m c. 5m high), a step-up transformer, an auxiliary transformer, an external circuit breaker, electrical balance of plant, 1 No. firefighting water tank, above ground oil separator and collection pit c. 100m of underground cabling ducts and cable to the adjoining ESB substation, balustrade boundary fencing, security entrance gate and CCTV, all other ancillary and miscellaneous site works to include site clearance, site access, internal roads and development of areas of hard standing and lay-down area. The proposed development will connect by underground cable to the Electricity Supply Board (ESB) 220kV substation adjoining the western boundary of the proposed development site. This underground cabling will not form a part of the transmission networks as defined in Section 2(1) of the Electricity Regulation Act 1999