The Development consists of 1. Single Storey extension to rear of property. 2. First floor Extension to the side of the existing 2 storey house 3. Installation of rooflights to the front and rear planes and construction of gable roof
Provision of a 3 storey office development with a total gross floor area of c. 2,992sq.m (excluding the c. 205sq.m plant room at roof level); Provision of 51 car parking spaces (including 2 accessible spaces and 27 EV spaces with charging points), accessed via the existing vehicular entrance from Lake Drive; Provision of 2 pedestrian access points to the north and east of the site, bicycle parking facilities, an ESB substation (c. 22sq.m), waste storage facilities (c. 20sq.m); signage, soft and hard landscaping works, PV panels, external lighting, piped infrastructure and ducting, SuDS drainage and all ancillary site excavation and development works above and below ground.
Retention to retain single storey independent unit in rear garden, and all associated site works.
Installation of 360 PV solar panels covering an area of 720 sq.m on roof; all associated site and development works.
New primary school (Roll No. 20549P), including 20 classrooms, with a gross floor area of 3,449 sq.m over 3 storeys; The proposed development will also provide a no. multi-purpose hall and all ancillary teacher and pupil facilities; Vehicular, cycle, and pedestrian access to the site is proposed to the north-west of the school, with staff and visitor parking spaces; car and bus drop off and set down facilities and associated set down areas and accessible parking facilities; A secondary, future provision of pedestrian, vehicular and cycle access points are provided to the southern boundary of the site; The development will also include the provision of bicycle and scooter parking; external stores; Internal access roads, cycle and footpaths; hard and soft play areas including 2 ballcourts; piped infrastructure, connections and ducting; external plant area; landscaping and boundary treatments; green roofs, PV panels; 1 ESB substation; EV parking facilities; external courtyards and all hard and soft landscaping; ancillary ramps and stairs; lighting; signage; 3 attenuation tank; SUDs; 3 flagpoles; changes in level and all associated site development and excavation works above and below ground.
Permission sought for the retention of existing store and glasshouse at rear
New main entrance door and canopy, installation of external signage and removal of existing draught lobby to south-west facade, installation of 5no. glazed doors and 4no. louvred panels to existing glazed facades, provision of 198sqm of photovoltaic panels below parapet level of flat roof, 2no. free-standing signage totems, 8no. new Electric Vehicle charging points, 2no. bicycle parking shelters and miscellaneous landscaping works.
A new vehicular entrance and boundary fence to new display surface car parking, on 0.15ha of vacant land, located west of the existing car parking including a 6m high internally illuminated signage totem and tensile fabric canopy structures. Extension of existing workshop by 208sq.m located to the north of Block B and extension of 106sq.m for new vehicle preparation to the north of Block B and internal alterations including a trade parts counter and a new double door on the west elevation of the showroom building, known as Block B, a two storey extension matching the existing height of Block C of 692sq.m to the north of the servicing area of the building known as Block C for vehicle servicing and waiting facilities and an external canopy structure of 200sq.m to the east elevation of the existing parts building known as Block A on an overall site of 2.257ha.
The development will consist of sub division of the existing corner house site to allow for construction of a new two storey, 2 bed dwelling with existing access from the road off Beechwood Lawns for car parking, new boundary separation fence and walls, new landscaping, new bin storage, new exterior terrace and all associated ancillary works. The works also include demolition of two existing garden sheds to the existing site to make way for the new dwelling.
Subdivision of the existing corner house site to allow for construction of a new two storey dwelling with new access from the road off Beechwood Lawns for two car parking spaces, new boundary separation fence and walls, new landscaping, new bin storage, new exterior terrace and all associated ancillary works. The existing dwelling rear garden space will be altered as part of the works and shall include demolition of two existing garden sheds to make way for the new dwelling.
Single storey extension to rear, dormer loft extension to attic level to rear with solar panels to roof, two storey extension to side, energy upgrade and modifications to existing structure, rooflight to front roof ancillary works.
Amend previously permitted application Ref. SD21A/0230 consisting of the installation of two external water tanks and associated concrete slabs, guardrails and access ladders, to the north-east of Units F & G (currently under construction) and all associated landscaping, infrastructure and site development works to facilitate the development.
Provision of signage on the north, south and west elevations; Provision of a storage yard, access road, mesh fence and walls to the west of Unit G; Additional door to access storage yard on the west elevation and all associated landscaping and ancillary works to facilitate the development.
Proposed LED Flood-Lighting System on Grass Pitch consisting of 6 number 20 Metre high columns and all associated ducting, column bases and light fittings
Erect 1 company logo advertising sign at Unit 2 (Units 1 & 2 currently under construction as per previously granted under Ref. SD21A/0162 & SD22A/0313); The signage will consist of raised backlit company logo lettering; Total area of 12sq.m located 11.43m above ground floor level on the front (southern) elevation.
Planning Permission is sought for 1) the retention, conservation, restoration and change of use of 113sq.m ground floor portion of the existing 344sq.m two storey former barn building to restaurant dining & restaurant toilets 2) 4 no. pre-fabricated container type structures to be located in the court yard area which will accommodate Restaurant Kitchens, toilets & staff room 3) 1 no. 59sq.m, mostly glazed, prefabricated enclosed, pergola type structure to be located in the court yard area, which will accommodate restaurant seating & restaurant reception area 4) use of remaining existing internal court yard area as an outdoor cooking area with external pizza oven, restaurant service area and bin storage area 5) proposed vehicular/ service entrance in existing court yard wall from existing car park area 6) associated signage and 7) ancillary alterations to existing elevations and all ancillary site works.
Planning permission is sought for 1) the retention, conservation, restoration and change of use of the existing 344 sq.m two storey former barn building to a 2 storey restaurant of circa 311 sq.m. 2) ancillary commercial kitchen, restaurant seating area, toilets, ancillary office & staff rooms 3) ancillary alterations to all elevations 4) use of existing internal court yard area as a dining area, with external pizza oven, and restaurant service area accommodation a freezer container unit & bin area. 5) proposed vehicular / service entrance in existing court yard wall from existing car park area 6) associated signage and 7) all ancillary site works.
Installation of 1 no. external permanent site back up generator to the north of the site.
Installation of 1 no. external air handling unit and associated ductwork to existing Unit F.
Installation of 2No. external non-illuminated lettered signs to the eastern and northern elevations at Unit F, Mountpark Baldonnell.
Residential development consisting of 99 dwellings comprised of 84 two storey houses, 15 apartments and duplex units accommodated in 2 three storey blocks; the proposed houses are comprised of 9 two bed houses, 71 three bed houses, 4 four bed houses; the proposed apartments & duplex units are comprised of 6 one bed units, 3 two bed units and 6 three bed units, also providing for all associated site development and infrastructural works, car and bicycle parking, ESB sub-station, open spaces and landscaping, bin and bicycle storage; access to the development via a new vehicular entrance on the western boundary of the site, off the existing access road to the Luas park & ride facility on a site area of 3.14ha bounded to the north by Citywest Avenue, located east of a permitted residential development known as Citywest Village and existing ESB sub-station and is north of the Luas red line.
We DSV Solutions Limited intend to apply for planning permission for the inclusion of a new rear elevation canopy to the existing warehouse facility located at Unit F, Mountpark Baldonnell, Baldonnell Business Park, Dublin 22 as follows: Addition of a canopy structure (157m2, 7,42m high) attached to the rear of existing warehouse unit plus directly associated elevational changes and site works.
The development will consist of erection of back-lit signage to the west elevation of Unit 3018.
Signage for Unit E including the provision of 1 halo illuminated sign to the north eastern elevation; and all associated works. (Development site at Unit E in the townland of Collegeland, Baldonnel Business Park, Dublin 22; the site is under construction and located between Casement Aerodrome and the N7 national route)
Canopy waste compactor/baler on south western elevation and all associated site works on a site under construction and located between Casement Aerodrome and the N7 national route. The proposal amends a previously permitted development under SDCC Reg. Ref. SD20A/0215.
The development is comprised of a single storey extension to the rear, two storey extension to side, energy upgrade and modifications to existing structure and all ancillary works
Permission for demolition off existing single storey garage and the construction of a new two storey extension to the side of the existing house and single storey extension to the rear of the house with all assocciated works.
Alterations to existing east and west elevations to include 10 external vents; installation of new photovoltaic solar panels to existing roof; provision of 10 bicycle parking spaces; 2 EV chargers; 1 external condenser and all associated site works.
Retain existing mezzanine storage floor as installed at first floor level; Permission to convert part of the first floor mezzanine storage floor to office space and install new windows to both the east (side) and the south (rear) elevations at first floor level.
The installation of 1.6m x 0.87m x 0.5m (hxlxw) pressure reduction installation and 3.25m (h) vent stack with all ancillary services & associated site works.
Demolition of 2 sheds and 2 compounds and works to the existing building comprising of the construction/installation of 5 external dock levellers with roller shutter doors with associated revisions to the existing western elevation to accommodate same; associated site levels and drainage layout adjustments to accommodate the development; expansion of existing concrete yard and all associated engineering and site works necessary to facilitate the development.
Planning permission for the construction of 2 no semi-detached 2 storey dwellings, including all associated site works, landscaping and SUDs drainage details, increasing a section of the side boundary wall to 1.8m in height, new vehicular access exiting onto Cloonmore Drive, Dublin 24, for each dwelling, all at the site to the side of 1 Cloonmore Drive, Dublin 24.
Alterations to an existing planning permission Reg. Ref. SD21A/0162 for a warehouse development of 2 units (Unit 1 & Unit 2) at the 4.04ha site comprising of reduction of 237sq.m of warehouse floor area on the ground floor due to, change of use of 63sq.m of warehouse floor area to office floor area, change of use of 91sq.m of warehouse floor to staff facilities floor area on the ground floor plan, and the remainder due to the addition of a 2.4m high perimeter blockwork wall in the warehouse area; Change of use of 14sq.m of staff facilities floor area to office floor area at the ancillary office ground floor plan; Change of use of 14sq.m of office floor area to staff facilities floor area over ist & 2nd floor plan; Reduction of 28sq.m of office over 1st and 2nd floor plan to facilitate structural alignment; Minor internal alterations to the ancillary staff facilities/office layouts with no area alterations; Elevational changes, omission of 5 dock levellers & associated canopy and addition of 1 fire escape door to the building's southern elevation; Addition of 2 fire escape doors to the building's northern elevation; Alterations to Unit 2 are as follows, omission of warehouse office/staff facilities block at the south-east & north-west corner of the warehouse resulting in, change of use of 40sq.m of office floor area to warehouse floor area and change of use of 76sq.m of staff facilities floor area to warehouse floor area on the ground floor; Addition of a 2.4m high perimeter blockwork wall internally within the warehouse area, resulting in a warehouse floor area reduction of 63sq.m; Alteration to the ancillary office/staff facilities block resulting in, a reduction of 101sq.m of office floor area and addition of llm2 of staff Facilities floor area on ground floor plan; Reduction of 104sq.m of office floor area & 52sq.m of staff facilities floor area over 1st & 2nd floor plan; Elevational changes, a reduction of 2 level doors and addition of 6 dock leveller doors & associated canopy to the building's north-eastern elevation; Associated site plan and drainage adjustments.
Construction of 2 warehouses with ancillary office and staff facilities and associated development; Unit 1 will have a maximum height of 16.35 metres with a gross floor area of 8,156sq.m including a warehouse area (7,397sq.m), ancillary office areas (362sq.m) and staff facilities (397sq.m); Unit 2 will have a maximum height of 15.35 metres with a gross floor area of 5,990sq.m including a warehouse area (5,031sq.m), ancillary office areas (536sq.m) and staff facilities (423sq.m); vehicular access/egress routes to the subject site via the existing roundabout and access road; alteration to the existing access arrangements to the subject lands to facilitate safe traffic flow to/from the proposed facilities; pedestrian access; 109 car parking spaces; bicycle parking; HGV Parking; HGV yards; level access goods doors; dock levellers; access gates; signage; hard and soft landscaping; lighting; boundary treatments; ESB substation; sprinkler tanks; pump houses; and all associated site development works above and below ground on lands bounded to the south by the N7 Naas Road, to the north and west by the National Distribution Centre and to the east by Brownsbarn Drive and the Royal Garter Stables, a Protected Structure (RPS Ref. 261).
The installation of an external Air Handling Unit, to be housed in a new timber and metal clad enclosure adjacent to Unit 3030, Lake Drive and the installation of a Heat Pump Unit to be installed within an existing plant enclosure, with additional cladding proposed, in the north east corner of the carpark of Unit 3030 and all ancillary engineering and landscape works necessary to facilitate the development at Unit 3030 Lake Drive, Browns barn, Dublin 24 D24 KX6Y. (Previous planning reference SD25A/0185W )
The development will consist of alterations to the existing east elevation to include the provision of a new external fire escape stairs to facilitate the internal subdivision of the existing office building, together with all associated site and ancillary works.
Minor alterations to the existing Pastoral Centre to include the formation of a new entrance door and enlarged window on the elevation to Fortunestown Road. The provision of a community café service within the existing main room of the building and all associated works including new skylights to north & south faces of the roof & minor site works.
The construction of a two storey extension (c.70m.sq.) to the side of the existing two storey dwelling along with the widening of the existing vehicular access including dishing of kerb, alterations to the existing boundary treatments and all other ancillary site development works at 1 Cloonmore Drive. Retention permission is also sought for the existing single storey shed (c.35m.sq.) to the rear of the existing dwelling.
For the construction of a single two storey three bedroom detached dwelling to the side of the existing two storey dwelling along with new vehicular access and dishing of existing kerb on the western boundary and all other ancillary site development works.
Conversion of existing attic to non-habitable storage space; Existing hipped roof to be altered to A frame roof inclusive of a dormer window to the rear of the dwelling all at roof level; Proposed staircase from first floor to attic level; Proposed finishes to match and align with existing dwelling inclusive of all associated site works.
Side extension at first floor level to add a bedroom and toilet, and extension of previously approved dormer at attic floor level. Proposed finishes to match and align with existing dwelling inclusive of all associated site works.
Retention of single storey flat roof extension to rear (south west), including kitchen with 2 rooflights, utility room, wc and dining area with sliding door; removal of entrance porch and new front door; change of use from garage to bedroom inclusive of change of garage door to window at front and increased parapet height; single storey blockwork shed with sliding door to rear of the dwelling to be retained inclusive of all associated site works.
Planning permission for an attic conversion including a change of roof profile from hipped roof profile from hipped roof to a half-hipped gable-ended profile, a rear dormer roof extension, two rooflights to the front elevation, a new window to the gable wall and new internal access stairs and all associated site works
Replacement of an existing 15m telecommunications monopole support structure (overall height of 17.8 metres), previously granted by Ref. SD13A/0104) with a proposed new 15m telecommunications lattice tower (overall height of 17.8 metres) carrying the telecommunications equipment transferred from the existing structure and the addition of new telecommunications antennas, dishes and associated equipment, together with new ground level equipment cabinets and fencing; The site is within the curtilage of a Protected Structure (RPS: 311 -Rathcoole Garda Station).
Change of use of a residential dining area to a kitchen for a home baking business.
Installation of a new access door and canopy to the south east elevation at ground floor level, the replacement of 4 spandrel panels with louvred vents below first floor level slab, and a new air handling unit with louvred enclosure and access doors at roof level.
Installation of two internally illuminated external building mounted signs to the existing west and east facades.
The development will consist of: I. 384 residential units with a cumulative gross floor area of 33,190.15 sq.m comprising: a) 122. houses, consisting of 28 two-bed units, 83 three-bed units and 11 four-bed units, ranging in height from 2-3 storeys. b) 84 duplex units, consisting of 48 one-bedroom units and 36 three-bedroom units, ranging in height from 2-3 storeys. c) 178 apartments consisting of 43 one bedroom units and 135 two-bedroom units, ranging in height from 5-7 storeys. II. tenant amenity floorspace with a gross floor area of 139 sq.m. III. 1.49 ha of public open space including a public plaza and 0.15 ha of communal amenity space; IV. the provision of a childcare facility with a gross floor area of 239 sq.m and associated play area; V. the provision of 361 car parking spaces, including 10 disabled parking spaces and 16 reserved for visitor parking and 3 reserved for creche staff. VI. the provision of 734 bicycle parking spaces, including 472 residents bicycle parking spaces and 262 visitor cycle spaces. VII. vehicular access is proposed via 3 access points including the existing Kingswood roundabout on Citywest Avenue to the north, The Walk to the west and from the park and ride access road at the eastern end of the site. Dedicated pedestrian/cyclist links are proposed throughout the site. VIII. ESB substation, 3 x ESB kiosks, rooftop solar photovoltaics, landscaping and all ancillary site and development works.
Installation of energy storage units at an existing datacentre facility. The energy storage will consist of two new battery storage units, 2 new HV power skids (PCS transformer and HV RMU), two new MV transformers, concrete slab, security fence of 2.4 meters height including two new internal gate entrances.
The installation of an energy storage unit at an existing data centre facility. The development involves the placement of three ISO 40ft. shipping containers containing back up storage units at Keppel Data Centre, Citywest Avenue, Citywest Business Park, Dublin 24