Erect a 8,875m2 manufacturing & engineering industrial extension with 1,020m2 additional office space to the side of the existing 5,550m2 manufacturing & engineering industrial & office building along with all associated site development worksDecision record indexed
Construction of Biofuel facility comprising of a part 3 storey and part single storey commercial building with a total floor area of 1771m2, covered truck filling / unloading area. Pipe bridge and tank farm storage area. The overall building height is 14 metres with solar panels on the roof. The maximum height of any storage tank is 12 metres and the boiler room chimney is 15 metres. Extension of the existing Kish Business Park access road, footpaths, drainage and water supply to serve the subject site. New internal roads, footpaths, 21 no. car parking spaces, 10 no. cycle parking spaces and parking and circulation areas for 10 no. trucks; 2 no. vehicular entrances, pedestrian access, boundary treatment and landscaping, ESB substation and new underground foul and storm water drainage system for the site including rainwater harvesting, attenuation pond, full retention oil interceptor and associated works. The application site area is 1.6 hectares. An Environment Impact Assessment Report (EIAR) has been prepared and will be submitted to the Planning Authority with the planning applicationDecision record indexed
Construction of: (1) a new dairy cow road underpass with new farm roadways, (2) a new milking parlour with dairy and dafting area, (3) a new open collecting yard with an external slatted tank, (4) a new meal bin, (5) a new pipeline to the existing geo-membrane lined slurry store, (6) a new concrete apron, (7) removal of the existing horse sand arena wooden fence, (8) removal of the existing external milk cooling tank, (9) decommission of the existing milking parlour and collecting yard, (10) removal of the existing farm entrance side walls and hedges to create wider farm entrance and for a setback of the western roadside hedge to provide sufficient sightlines on both sides, (11) all associated site development worksGrounds not yet categorised
Construction of: (1) a new dairy cow road underpass with soiled water sump tank with new farm roadways, (2) a new milking parlour with dairy, drafting area and covered collecting yard with an internal precast concrete slatted channel, (3) a new underground precast concrete covered channel connected to the existing channel to discharge slurry to the existing geo-membrane lined slurry store, (4) a new meal bin, (5) a new concrete apron, (6) removal of the existing horse sand arena wooden fence, (7) removal of the existing external milk cooling tank, (8) decommission of the existing milking parlour and collecting yard, (9) removal of the existing farm entrance side walls and hedges to create wider farm entrance and for a setback of the western roadside hedge to provide sufficient sightlines on both sides, and (10) retention permission for the existing geo-membrane lined slurry store (11) and all associated site development worksDecision record indexed
To erect a 532m2 commercial building comprising a 432m2 manufacturing/industrial unit with an ancillary 100m2 office space along with all associated site development works including storage yard, car parking and connect to the existing servicesDecision record indexed
Dwelling,garage, upgrade to existing entrance, bored well, effluent disposal systems to current EPA standards and all associated site worksGrounds not yet categorised
Single storey 710 sqm industrial unit, comprising of a 236 sqm metal fabrication workshop, and 474 sqm trade sales and display area, plus 272 sqm concrete surfaced yard with security fence to the side of the proposed building, connect into the existing mains sewer and storm water systems, to provide car parking, a 3.5m high sign at the site entrance and all additional site works14 conditions indexed
(i) Single storey industrial unit (Gross Area 2,380sqm) in lieu of that allowed under PPR21/951 and (ii) new car park and timber storage compound and all associated site worksDecision record indexed
(i) Single storey industrial unit (Gross area 3150 Sqm) infill extension between existing buildings. (ii) New car park and timber storage compound (0.7 Ha) and all associated site worksDecision record indexed
(1) Demolition of the existing shed (2) Provision of a two-storey pitched roof extension to the rear of the existing house including the provision of rooflights (3)Internal alterations to the existing house (4) Removal of the existing septic tank (5) Provision of a new septic tank and trenched percolation area to the rear of the site (6) Associated alterations to all elevationsDecision record indexed
Installation of a new effluent treatment system and percolation area in full accordance with EPA Cop 2009 standards and all associated site works, together with a new bored well4 conditions indexed
Change to an approved permission Reg. Ref. 20/667 with the addition of a single storey bedroom extension to the rear of a single storey cottage4 conditions indexed
Demolish the existing 2m2 front porch and 40m2 substandard rear extension along with all outbuildings totaling 84m2 and erect 81m2 new single storey extensions to the rear and side of the existing 45m2 cottage along with minor alterations and revisions to the elevations and internal layout of the original cottage and erect an 84m2 garage, upgrade the existing effluent disposal system to current EPA standards, improve the existing vehicle entrance along with all associated site development worksDecision record indexed
Erect 14,500.77 m2 of photovoltaic panels on a ground mounted system with all associates site works at Servier (Ireland) Industries Limited. The development will comprise of a 2.0 MWp Solar PV farm on 3.36 hectares of land located to the south of our existing pharmaceutical manufacturing plant. The electricity generated will be used by Servier (Ireland) Industries Limited. The development will comprise of photovoltaic panels with ground mounted frames together with all ancillary cabling and electrical infrastructure; 1 no. transformer cabin; 1 no. spare parts cabin; using all temporary ways and temporary construction compound / set-down area included on the applicationDecision record indexed
Construction of a slatted cattle house/store, cattle handling facilities, farm roadway and farmyard entrance, together with associated concrete yards and site worksDecision record indexed
Construction of a garage to the rear of their property and the Planning Permission for the construction of a covered carport to the rear of the property together with associated and ancillary site worksDecision record indexed
Dormer type extension to existing bungalow and erect an extension to the side which will consist of the following (a) renovation and extension of the ground floor to create additional living space including the rearrangement of internal layouts with associated demolition works (b) the removal of the existing roof and replace it with a dormer roof space to accommodate bedrooms (c) renovate and extend the existing storage shed and workshop (d) ancillary works7 conditions indexed
North & Northeast of Kish Business Park, Arklow, Co. Wicklow
Proposed development, for which a ten-year permission is sought, consists of the following: Demolition of existing outbuildings on the subject site, along with all site clearance and enabling works; Construction of 3 no. part one storey, part two storey, information and communication technology (ICT) facility buildings, each with a gross floor area (GFA) of C. 22,210 sq. m (66,630 sq. m GAF in total), and with a height (to parapet level) of c. 10.4 metres; Each of the 3 no. ICT facility buildings will accommodate ICT equipment rooms, associated electrical and mechanical equipment rooms, loading bays, maintenance and storage space, office administration areas, and staff facilities; Emergency generators (20 no. for each ICT facility building), flue stacks and associated plant are provided in fenced compounds adjacent to each ICT facility; Extension of the existing road serving Kish Business Park to access the subject site, with gated access points to the proposed ICT facility development to be provided off this roadway on its eastern side. The proposed roadway will form part of the inner relief road planned under Objective IT7 of the Arklow Town and Environs LAP 2018-2024; Construction of internal road network and circulation areas, footpaths, provision of 180 no. car parking spaces (60 no. spaces to serve each ICT facility) and 18 no. cycle parking spaces; Landscaping and planting, boundary treatments, lighting, security fencing, gatehouse (with a GFA of 175 sq. m), and all associated site works including underground foul and storm water drainage network, attenuation and percolation areas, and utility cables, on an application site area measuring c. 24.16 hectares. Site located to the North & Northeast of the existing Kish Business Park26 conditions indexed