The installation of circa. 3,492sq.m array of solar photovoltaic (PV) panels on ground mounted frames on an agricultural plot within the existing Shelton Abbey Open Prison, together with ducting, underground electrical cabling, and all associated site works The proposed development is considered to be within the curtilage of a protected structure (RPS No. 40-05) listed under the current Wicklow County Development Plan 2022-2028. The proposed solar array installation will have no impact on the protected structure, located over 330.00 meters away from the proposed site.
1) construction of a single storey extension to existing office building. 2) construction of a single storey extension to existing production building and 3) all associated and ancillary works, including reconfiguration of existing external steps and footpaths and connections to existing surface water collection network, all at existing facility
Construction of a dwelling, garage and effluent treatment system, all together with associated site works
Proposed new dwelling, upgrade to existing entrance, bored well, effluent disposal systems to EPA Cop 2009 standards and all associated site works
For modifications to the dwelling and site granted permission under Reg Ref 20/746. For (1.) A reduction to the overall subject site area.(2) A revised location for the approved dwelling site layout/entrance driveway. (3). A revised location packaged effluent disposal system with mechanical aeration and polishing filter to current EPA standards (4.) A revised location for a proposed groundwater well and all together with required site and development works
New dwelling house & driveway, a packaged effluent disposal system with mechanical aeration and polishing filter to current EPA standards & a groundwater well together with required site and development works
Outline Reg Ref 23/444. The development will consist of a dwelling circa 191msq, a domestic garage, packaged effluent disposal system with mechanical aeration and polishing filter to current EPA standards, a groundwater well, together with all required site and development works
- 2 no. warehouse buildings with a gross floor area (GFA) of c. 3,364 sq.m each and a total height of c. 14.1m. Each warehouse includes a warehouse area of c. 2,419 sq.m, reception area, office, staff facilities, toilets, plant and storage areas at ground floor level, and office space, meeting rooms, staff facilities, toilets, plant and storage facilities at mezzanine level (c. 581 sq.m). - The provision of a service yard with a security hut (c. 34 sq.m) located at the main entrance, HGV unloading areas and 4 no. associated loading bay docks on the eastern elevation of each warehouse building. - The provision of 68 no. car parking spaces including 4 no. accessible spaces and 10 no. EV parking spaces serving staff and visitors. - The provision of 40 no. cycle parking spaces serving staff and visitors. - The provision of a sprinkler tank, sprinkler pump house (c. 13.3 sq.m), fire hydrant tank, hydrant pump house (c. 13.3 sq.m) and ESB substation (c. 25 sq.m) - Construction of a solar farm development consisting of photovoltaic (PV) panel arrays covering an area of approximately c. 15.7 ha on ground mounted steel frames, associated power trunk building (c. 539 sq.m) and 2 no. transformer compounds, underground cabling and ducting, new internal tracks for maintenance and all associated site services works. - Site access from the permitted development to south (WCC Reg. Ref.: 20/1088 as amended WCC Reg. Ref.: 23/62 and 24/88), which is subject to a current separate amendment application under WCC Reg. Ref.: 25/60350, and extension of the permitted inner relief road through the site. - The provision of a new statcom compound including a single storey control and valve building with a GFA of c. 253 sq.m and associated equipment adjacent to the permitted inner relief road to the south of the main site area. The proposed development also includes for the provision of associated landscaping and planting, berms, boundary treatments, internal road network, pedestrian and cyclist infrastructure, signage zones, site lighting, drainage works, sustainable drainage systems (SuDS) and all ancillary site development works
Rear/side extension to existing main cottage. Permission for new extension to the rear of main cottage, which will create a link connection, to existing outhouse buildings, conversion of existing outhouse building to home office/workshop and conversion of existing outhouse building to self-contained apartment/granny flat, with double bathroom extension to the rear-south elevation, one for the studio, one for self-contained apartment/granny flat. Associated site works and some internal alterations
Construction of a storage/machinery shed and all associated site works
A 38KV grid connection cable and associated infrastructure to connect the approved Johnstown North solar farm (consented under planning ref. 171497) to the existing Arklow 220kV Substation comprising the laying of a 3,190m Underground Cabling (UGC) and associated infrastructure, located at Dublin Road, Arklow, Co. Wicklow
Dwelling, wastewater treatment system to EPA standards, entrance incorporating revision to existing entrance and associated works
To erect a 532m2 commercial building comprising a 432m2 manufacturing/industrial unit with an ancillary 100m2 office space along with all associated site development works including storage yard, car parking and connect to the existing services
As constructed weighbridge office extension, PRR 20/1282 and all associated site works
Detached storage shed no. 1 (388.50m2), detached tool / battery shed no. 2 (38.9m2), 2 no. sprinkler tanks and pump house (13.95m2) located north of building no. 1. Retention sought for detached storage shed no. 3 (224.60m2) located north of building no. 2 and all associated works
An amendment to Block 1 permitted under PPR 19/54 consisting of a single storey extension (281sqm) and all associated site works
Erect 14,500.77 m2 of photovoltaic panels on a ground mounted system with all associates site works at Servier (Ireland) Industries Limited. The development will comprise of a 2.0 MWp Solar PV farm on 3.36 hectares of land located to the south of our existing pharmaceutical manufacturing plant. The electricity generated will be used by Servier (Ireland) Industries Limited. The development will comprise of photovoltaic panels with ground mounted frames together with all ancillary cabling and electrical infrastructure; 1 no. transformer cabin; 1 no. spare parts cabin; using all temporary ways and temporary construction compound / set-down area included on the application
The construction of a bungalow with new entrance and driveway off existing right of way, new effluent treatment system to current EPA standards and all ancillary site works
Single storey extension to building no. 1 (728 m2) and 2 no. battery storage kiosks and 2 no. invertors to northern façade of building no. 1, removal of ground mounted solar panels and construction of detached single storey building (120m2) to the south of building no. 1. single storey extension to building no. 2 of (152 m2) and all associated site development works
Erect a first floor dormer extension with alterations and revisions to the elevations of the existing dwelling along with all associated site development works
Proposed development, for which a ten-year permission is sought, consists of the following: Demolition of existing outbuildings on the subject site, along with all site clearance and enabling works; Construction of 3 no. part one storey, part two storey, information and communication technology (ICT) facility buildings, each with a gross floor area (GFA) of C. 22,210 sq. m (66,630 sq. m GAF in total), and with a height (to parapet level) of c. 10.4 metres; Each of the 3 no. ICT facility buildings will accommodate ICT equipment rooms, associated electrical and mechanical equipment rooms, loading bays, maintenance and storage space, office administration areas, and staff facilities; Emergency generators (20 no. for each ICT facility building), flue stacks and associated plant are provided in fenced compounds adjacent to each ICT facility; Extension of the existing road serving Kish Business Park to access the subject site, with gated access points to the proposed ICT facility development to be provided off this roadway on its eastern side. The proposed roadway will form part of the inner relief road planned under Objective IT7 of the Arklow Town and Environs LAP 2018-2024; Construction of internal road network and circulation areas, footpaths, provision of 180 no. car parking spaces (60 no. spaces to serve each ICT facility) and 18 no. cycle parking spaces; Landscaping and planting, boundary treatments, lighting, security fencing, gatehouse (with a GFA of 175 sq. m), and all associated site works including underground foul and storm water drainage network, attenuation and percolation areas, and utility cables, on an application site area measuring c. 24.16 hectares. Site located to the North & Northeast of the existing Kish Business Park
(i) first floor extension to existing single storey weighbridge office (ii) above ground fire water storage tank to serve this building and development permitted under PPR 19/54 (iii) omission of office building permitted under PPR 19/54 and all associated site works
To amend the design of the approved development (Planning Reference: 17/1497) which comprises a Solar PV Energy Development. Proposed amendments include (1) change in location and size of substation, (2) two additional temporary construction compounds will be located at the site entrances, (3) the number of modules will decrease, (4) the number of pile driven poles will decrease, (5) the size and number of transformer stations will increase, (6) the total fencing area will increase (7) the total amount of fencing posts will increase, (8) up to 21 CCTV cameras will be installed (9) access tracks will be optimised and increased in width and length, and (10) increase in operational lifetime from 25 years to 35years
Sunroom to the side of existing dwelling and PERMISSION to remove the entire pitched roof and demolish 111 sqm of the existing dwelling, erect a 272 sqm two storey extension to the first floor and sides of the retained 77 sqm structure with alterations and revisions to the elevations and internal layout along with an additional 32 sqm garage / store linking to the existing garage and all associated site development works
Construction of a slatted cattle house/store, cattle handling facilities, farm roadway and farmyard entrance, together with associated concrete yards and site works
Of 1) garden room and 2) garden storage building
Alterations and additions to an existing single storey detached dwelling, comprising the construction of a new single storey utility room extension to the rear, the construction of a new single storey bedroom extension to the front elevation, and the conversion of an existing detached garage area into home office, together with the construction of a new single storey domestic garage to the side of the existing dwelling, including all ancillary site works. Retention permission is also being sought for the conversion of an existing detached single storey garage structure into ancillary games/garden room at the same address
Alterations to the development permitted under Reg. Ref. 20/1088, as amended by Reg. Ref. 23/62, and will supersede the permitted information and communications technology (ICT) facility buildings permitted on site. In summary, the development comprises the replacement of the 3 no. part one and part two storey ICT facility buildings permitted on site, with 5 no. part two and part three storey ICT facility buildings with a reduced building footprint, along with an energy centre compound. The Battery Energy Storage System permitted under Reg. Ref. 23/62 and the substation and transmission line connections permitted under ABP Ref. 315200-22 will be unaffected by the proposed alterations. An Environmental Impact Assessment Report (EIAR) has been prepared and will be submitted to the planning Authority with the planning application. An EPA-Industrial Emissions Directive (IE) licence will be applied for to facilitate the operation of the proposed development
Amendments to the Battery Energy Storage System (BESS) permitted on site, under WCC Reg. Ref.: 23/62 (an amendment to WCC Reg. Ref.: 20/1088, which was subsequently further amended under WCC Reg. Ref.: 24/ 88). The proposedamendments comprise the following: • The provision of a BESS compound with a total area of c. 1.2 ha which will accommodate self-contained batteries and integral fire suppression equipment, climate control equipment and associated electrical components (in place of the previously permitted three-storey BESS structure and adjacent ancillary structures). • A single storey BESS Switchroom located to the south of the BESS facility with a total gross floor area (GFA) of c. 191 sq.m and total height of c. 5.3m accommodating a control room, relay room, and cable basement. • Water Services Plant and Storage equipment located to the north-east of the BESS comprising a single-storey fire pump house with a total GFA of c. 39 sq.m and total height of c. 3.1m, and 2 no. fire hydrant and water storage tanks with a total height of c. 10.3m. • All associated amendments including amendments to internal access routes, landscaping and planting, boundary treatments, the provision of an acoustic barrier to the south of the BESS compound, lighting, and all associated ancillary works. The operation of the development on site will require an EPA Industrial Emissions Directive (IE) Licence
Amendments to the information and communication technology (ICT) facility development permitted under Reg. Ref. 20/1088. The proposed amendments comprise the following: Provision of a three-storey Battery Energy Storage System (BESS) building with a gross floor area (GFA) of c.13,787 sq.m, located to the southeast of the permitted ICT Building 3. The proposed building will accommodate battery storage rooms and circulation areas, with photovoltaic panels at roof level, and with an overall height of c.16.8 metres. Associated buildings including a single storey power trunk building (to accommodate a control room and cable rooms, with a GFA of c.539 sq.m and an overall height of c.5.3 metres), a single storey BESS switch room building (to accommodate control rooms and a relay room, with GFA of c.396 sq.m and an overall height of c.5.3 metres) and a transformer compound area to the southwest of the proposed BESS facility. Provision of a fire water storage area and a single storey fire pump house with a GFA of c.39 sq.m to the northeast of the BESS facility. All associated amendments including new amendments to the internal access routes, landscaping and planting, boundary treatments, lighting, and all associated and ancillary works
The construction of a bungalow with garage, new entrance and driveway, new effluent treatment system to EPA current standards and all ancillary site works
Erect a dwelling and garage with services along with all associated site development works
Construction of a single storey dwelling, new vehicular entrance and driveway, new treatment system to current EPA standards and all associated site works
Construction of 3 no. digesters, 2 no. digestate storage structures, a liquid feed tank and 4 no. pump houses located in the northern section of the site. 4 no. pasteurisation tanks, a post pasteurisation cooling tank and a pre fertiliser manufacturing tank, located to the southeast of the digesters, in the centre of site. Part single-storey and part two-storey reception hall to accommodate a lab, panel room, tool store, workshop, and storage areas, with a liquid feed intake adjacent to reception hall, located at centre of site. Single-storey solid digestate storage & nutrient recovery building located to east of reception hall, in central portion of site. Odour abatement plant and all assoc. works. Construction of ESB substation, fuel storage tank, CNG compression unit, 2 no. CO2 tanks, CO2 loading pump, CO2 auxiliaries, CO2 liqueufactor, CO2 compressor, GFA, CO2 pre-treatment skid located in eastern portion of site. Construction of emergency biogas flare, biogas treatment skid, biogas compression system, biogas upgrading module, combined heat&power unit & panel room & H2S washing tower located in eastern part of site. Construction of grid offtake skid, biomethane boiler, grid injection unit & 2 no. propane tanks located to southeast of CO2 structures, in eastern section of site. Construction of two-storey office&admin building, located in southeast of site, adjacent to main site entrance. Associated works inc. parking, 3 no. EV, 1 no. accessible parking spaces;bike storage, access arrangements incl. new access point to site from adjacent road to south, weighbridge, provision of solar panels, wwt equipment, attenuation pond in northern portion of site, boundary treatments, lighting, services, lightning protection masts, drainage, landscaping & all assoc & ancillary works. EIAR submitted.
Demolition of existing storage shed, a new shed to serve as house ancillary storage and hobby shed to store vintage cars and associated site development works
For an extension to the side and rear of the existing house (75m2), removal of existing sheds, reconfiguration of existing internal layout, new window opens and external insulation to the existing house, widening of the existing entrance gate, new wastewater treatment system, and all associated site works
Demolition of existing single storey shed and garage to rear, construction of new part single storey part storey and a half extension containing 2 dormer windows to rear, removal of existing septic tank and new replacement proprietary effluent treatment system and all associated site works
Erect a 8,875m2 manufacturing & engineering industrial extension with 1,020m2 additional office space to the side of the existing 5,550m2 manufacturing & engineering industrial & office building along with all associated site development works
To erect circular slurry storage tank
Saw enclosure(Gross Area 145 Sqm) to end of Unit 2 and all associated site works
Dwelling,garage, upgrade to existing entrance, bored well, effluent disposal systems to current EPA standards and all associated site works
Single storey industrial unit (Gross Area 945 Sqm) and all associated site works
Single storey 710 sqm industrial unit, comprising of a 236 sqm metal fabrication workshop, and 474 sqm trade sales and display area, plus 272 sqm concrete surfaced yard with security fence to the side of the proposed building, connect into the existing mains sewer and storm water systems, to provide car parking, a 3.5m high sign at the site entrance and all additional site works
(i) lean to extension (283sqm.) to existing building permitted under PRR 98/9110 and (ii) portacabin building for use as site office in connection with the applicants agricultural contracting business
A 10 year permission for the construction of a Solar PV Energy development within a total site area of up to 32 hA, to include one single storey electrical substation building, electrical transformer/inverter station modules, battery storage modules, solar PV panels ground mounted on steel support structures, access tracks, fencing and associated electrical cabling, ducting and ancillary infrastructure
Alterations and revisions to the already approved permission granted under PRR 20/632. Retention permission is sought for (1) an additional 275m2 of floor area to the already approved 2,300m2 manufacturing & engineering industrial unit now totalling 2,575m2 with minor alterations and revisions to the elevations and (2) minor alterations and revisions to the elevations, floor plan and internal layout of the connecting office building providing an additional 200m2 of office floor area to the original 2nd floor approved storage area with an additional 60m2 fire escape stairwell to the already approved 440m2 office building, now totalling 700m2. All associated site development works including storage yard, car parking, signage, and connection to the existing services and the same as approved under PRR 20/632
(i) Single storey industrial unit (Gross area 3150 Sqm) infill extension between existing buildings. (ii) New car park and timber storage compound (0.7 Ha) and all associated site works
Single storey welfare block (Gross Area 200 Sqm) and installation of covered timber storage racks to rear of existing unit 3
Construction of Biofuel facility comprising of a part 3 storey and part single storey commercial building with a total floor area of 1771m2, covered truck filling / unloading area. Pipe bridge and tank farm storage area. The overall building height is 14 metres with solar panels on the roof. The maximum height of any storage tank is 12 metres and the boiler room chimney is 15 metres. Extension of the existing Kish Business Park access road, footpaths, drainage and water supply to serve the subject site. New internal roads, footpaths, 21 no. car parking spaces, 10 no. cycle parking spaces and parking and circulation areas for 10 no. trucks; 2 no. vehicular entrances, pedestrian access, boundary treatment and landscaping, ESB substation and new underground foul and storm water drainage system for the site including rainwater harvesting, attenuation pond, full retention oil interceptor and associated works. The application site area is 1.6 hectares. An Environment Impact Assessment Report (EIAR) has been prepared and will be submitted to the Planning Authority with the planning application
(i) Single storey industrial unit (Gross Area 2,380sqm) in lieu of that allowed under PPR21/951 and (ii) new car park and timber storage compound and all associated site works