to
to

Planning records

Showing 1-44 of 44 public records
PreviousPage 1 of 1Next
  1. © OpenStreetMap
    25/6671Granted

    25 and 26 Copper Point, Skull Townland, Schull, Co. Cork

    Construction of 2 no. Two storey (3 Bed) Dwellings, 4 No. car parking spaces and all associated site works (previous permissions 05/1839, 08/1110, 13/426).Decision record indexed
    Decision06 February 2026View record
  2. © OpenStreetMap
    LRD25A/0637/WEBGranted

    In the townland of Merrion, Chesterfield, Cross Avenue, Blackrock, Co Dublin

    (i) The demolition of 2 existing shed structures with a total combined area of 55.7sq.m.; (ii) The construction of 252 residential units with a cumulative gross floor area of c. 26,250 sq.m. comprising: a) 236 apartments across 2 blocks ranging in height from 5-8 storeys over basement incorporating 43 no. 1-bed, 137 no. 2-bed and 56 no. 3-bed units, all with private amenity space; b)16 no. 5-bedroom terrace houses; (iii) A childcare facility (480 sq.m. GFA) with outdoor secure play area; (iv) Residential amenities including a gym, yoga room, meeting room and a resident's lounge & kitchen and bathroom facilities; (v) Realignment and enlargement of the existing on-site ornamental pond to facilitate surface water attenuation; (vi) Installation of infrastructure along Cross Avenue to facilitate connections to the municipal potable water supply at the junction of Cross Avenue and Booterstown Avenue and the surface water sewer at the junction of Cross Avenue and Mount Merrion Avenue; and (vii) The provision of pedestrian and vehicular access, landscaping, amenity and open space areas, boundary treatments, associated bicycle and car parking, associated plant, bike, bin and bulky storage, public lighting and all ancillary development works. The proposed development adjoins Protected Structure - Chesterfield House (RPS: No. 171), to the north. All application documentation and information are available for public viewing at the following website set up by the applicant: https://www.chesterfieldlrdplanning.com/Decision record indexed
    Decision09 January 2026View record
  3. © OpenStreetMap
    LRD25A/0641/WEBGranted

    Sector 3, Aikens Village, in the Townlands of Woodside and Kilgobbin, Stepaside, Co. Dublin

    A) Construction of a large-scale residential development of 209 no. residential units, comprising 18 no. three-bedroom three-storey triplex apartments and 191 no. duplex/own-door apartments (60 no. one-bedroom apartments, 77 no. two-bedroom apartments and 54 no. three-bedroom apartments) across 11 no. blocks ranging in height from three storey to part-three/part-four storey as follows: •Block 1 (4 storeys) comprising 9 no. apartments (3 no. 1 bed units and 6 no. 2 bed units); and a crèche facility at ground floor level of 235.5sq.m with associated outdoor play space of 60sq.m. •Blocks 2 and 3 (part 3/part 4 storeys) comprising 28 no. apartments (2 no. 1 bed units, 9 no. 2 bed units and 17 no. 3 bed units). •Blocks 4 and 5 (3 storeys) comprising 46 no. apartments (22 no. 1 bed units, 20 no. 2 bed units, 4 no. 3 bed units). •Blocks 6 and 7 (3 storeys) comprising 22 no. apartments (2 no. 1 bed units, 8 no. 2 bed units and 12 no. 3 bed units). •Block 8 (3 storeys) comprising 21 units (3 no. 1 bed duplex units and 18 no. 3 bed triplex units). •Blocks 9 and 10 (3 storeys) comprising 30 no. apartments (2 no. 1 bed units, 12 no. 2 bed units and 16 no. 3 bed units). •Block 11 (part 3/part 4 storeys) comprising 53 no. apartments (26 no. 1 bed units, 22 no. 2 bed units and 5 no. 3 bed units) with podium level communal open space, and undercroft providing plant, car parking spaces, motorcycle parking spaces, and bicycle parking spaces. Each apartment will have shared access to adjoining bin stores, car parking bays and bicycle parking bays. Each duplex/own-door apartment will be provided with private amenity space in the form of a balcony or terrace and each triplex apartment will be provided with private amenity space in the form of a ground level terrace and a terrace at second floor level. b) provision of 4,272.7sq.m of landscaped public open space and 3,223.9sq.m of landscaped communal open space on lands under the ownership of the applicants and provision of 5,490.8sq.m of landscaped public open space on lands under the ownership of Dún Laoghaire-Rathdown County Council. c) construction of 2 no. vehicular entrances, with associated internal access road network with pedestrian and cyclist infrastructure, via Thornberry Road and Atkinson Drive, 1 no. vehicular entrance via Atkinson Drive to the undercroft area and 1 no. pedestrian entrance via Village Road. d) Surface level car parking comprises a total of 147 no. car parking spaces, which includes 10 no. accessible spaces, 2 no. set-down spaces along Village Road to serve the creche, and 4 no. motorcycle spaces. Undercroft car park area proposed below Block 11 comprises 58 no. car parking spaces and 6 no. motorcycle spaces. Of the total 205 no. car parking spaces across the scheme 42 no. parking spaces will be provided with EV charging facilities. e) A total of 550 no. bicycle spaces are proposed in the form of 463 no. long-stay bicycle spaces in dedicated bike stores in each block, 82 short- stay visitor spaces at surface level (including 4 no. for the creche) and 5 no. long-stay bicycle spaces to serve the creche in Block 1. f) all ancillary site and infrastructural works, inclusive of removal of existing vehicular entrance via Village Road, provision of pedestrian crossings at Thornberry Road and at the corner of Village Road and Atkinson Drive, general landscaping and planting, boundary treatments, public lighting, plant rooms including 1 no. within undercroft car park for sprinkler system, 2 no. ESB substations at surface level, foul/surface water drainage and attenuation areas, and all associated site works necessary to facilitate the proposed development. All application documentation and information are available for public viewing at the following website set up by the applicant: https://ironbornlrd.comDecision record indexed
    Decision12 December 2025View record
  4. © OpenStreetMap
    2560317Granted

    Lands at Latlorcan and, Aghnasedagh Townlands, Monaghan Town

    Retention permission and permission for the residential development as under construction pursuant to permission 19441 (as extended under 25/9002). Retention Permission is sought for the following works:•Amendments to units 29, 31, 32, 33, 34, 37, 38 and 39 which incorporate a single storey rear extension;•Amendment to unit 30 to omit the underpass walkway;•Amendments to facades and design of units 28-41 as constructed;•Reconfiguration of rear garden walls to rear of units 36-41.•Reconfiguration of curtilage for units 36-41. Permission is sought for the following works:•Revised phasing within the overall scheme;•Provision of an ESB substation;•Revised boundary wall to rear gardens of units 36-41;•Revised road layout at front of unit 35 so that the shared surface connects into the wider estate road;•Amendments to house units 6, 9, 10, 11, 12, 13, 15, 20, 21, 22, 23, 24 and 26 to provide for a single storey rear extension;•Amendments to units 2, 8 and 25 to omit the underpass walkways;•Amendments to façade and design of units 1-27;•Associated amendments to site landscaping and ancillary works within the site. Significant Further Information received relates to an Outdoor Lighting Report, Housing Quality Assessment, revised project description, and amended drawings.Decision record indexed
    Decision26 November 2025View record
  5. © OpenStreetMap
    2560148Granted

    Bóthar an Chóiste, in the townlands of Castlegar and Ballinfoil, Galway

    Permission for development which consists of: We, Lock House Developments Limited (the applicant), intend to apply to Galway City Council for permission for a Large-Scale Residential Development. The site extends to 4.626 ha on lands located to the north of Bóthar an Chóiste (also known as Bóthar na Cóiste), in the townlands of Castlegar and Ballinfoil (also known as Ballinfoile), Galway. The application is being made under the provisions of the Planning and Development (Amendment) (Large Scale Residential Development) Act 2021. The proposed development will consist of the following: 1) Demolition of an existing house (124.6 m²), a ruined outbuilding (42.8 m²), and a ruined dwelling (41.7 m²) 2) Construction of 168 no. residential units comprising: i. 70 no. two storey houses (36 no. two-beds, 26 no. three-beds, 8 no. four-beds), ii. 2 no. apartment blocks comprising 54 no. apartments (27 no. one-beds, 27 no. two-beds), iii. 44 no. duplex units (19 no. one-beds, 25 no. two-beds). 3) Development of a two-storey creche facility (c. 300 sqm), associated outdoor play areas and parking. 4) Provision of all associated surface water and foul drainage services and connections including pumping station with all associated site works and ancillary services. 5) The upgrade of the existing Bóthar an Chóiste road from the proposed development to the junction at L5041 consisting of road improvements, road widening and junction re-alignment. 6) Pedestrian, cyclist, and vehicular links throughout the development and access to Bóthar an Chóiste, and pedestrian and cyclist link to the adjacent Greenway route. 7) Provision of Bat Boxes, a Native Hedgerow Corridor (biodiversity and pollinator friendly) along the northern boundary, and the provision of Sustainable Drainage Systems (SuDS) features. 8) Provision of shared communal and private open space, site landscaping and public lighting, resident and visitor parking including electric vehicle charging points, bicycle parking spaces, and all associated site development works. The application is accompanied by a Natura Impact Statement (NIS).Decision record indexed
    Decision11 July 2025View record
  6. © OpenStreetMap
    2560604Granted

    Ballyconneely, Townland, Co Galway

    For change of dwelling house design, layout and location from that previously permitted under planning permission ref. no. 22/61092 and for a shed/store building with all associated works and ancillary service. A Natura Impact Statement (NIS), has been submitted with this application. Gross floor space of proposed works: 220 sqm(H), 26 sqm(G)Decision record indexed
    Decision09 July 2025View record
  7. © OpenStreetMap
    2560194Granted

    West Vets West Road, Westport Co. Mayo, (in townlands of Carrownalurgan and Cloonmonad)

    Permission for development at West Vets, West Road, Westport, Co. Mayo, F28 V672 (in townlands of Carrownalurgan and Cloonmonad) amending Planning Permission Reference: P23/60561 (which permitted the demolition of existing West Vets building and structures on site and construction of a housing development of 16 no. dwellings and associated development and works). The proposed development comprises: 1. Revised site layout and housing mix resulting in an increase in dwellings to 26 no.; 2. The house typologies have changed from (4 no.) detached and (12 no.) semi-detached with (2 no. four bed, 12 no. three bed and 2 no. two bed) units to a mix of two and three storey terraced houses (12 no.) and apartment (7 no.) / duplex (7 no.) units (three storey overall), with 8 no. four bed, 11 no. three bed and 7 no. two bed sizes overall; 3. Revised boundary treatments, landscaping and all other enabling, associated and ancillary development and works (and amendments to Planning Permission Reference P23/60561) above and below ground level.Decision record indexed
    Decision08 July 2025View record
  8. © OpenStreetMap
    2460205Granted

    In the townlands of Ballybar Lower Ballybar Upper, Ballycarney Ballyloo, Linkardstown Park and Tinryland

    A 10 Year planning permission for a solar farm with a total area of circa 73 hectares in the townlands of Ballybar Lower, Ballybar Upper, Ballycarney, Ballyloo, Linkardstown, Park and Tinryland in County Carlow. The solar farm will consist of solar panels on ground mounted frames, 11 no. single storey electrical inverter/transformer stations, 3 no. single storey spare parts containers, 2 no. Ring Main Units, 3 no. weather stations, underground electrical ducting and cabling within the development site, private lands and within the L1010, L3051, L3052 and L3050 public roads to connect solar farm field parcels, security fencing, CCTV, access tracks, 3 no. watercourse/drain deck crossings and 2 no. horizontal directional drill crossings (under M9 motorway and L3050), temporary construction compounds, landscaping and all associated ancillary development and drainage works. Construction and operational access will be via 2 no. entrances from the L1022 and L1010. Sections of the proposed underground electrical cabling will traverse the solar farm proposed under Carlow County Council Reference 24/60043, but will not alter infrastructure proposed under that application. The operational lifespan of the solar farm will be 40 years and planning permission is requested for this duration. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application36 conditions indexed
    Decision24 April 2025View record
  9. © OpenStreetMap
    2460415Granted

    Within the townlands of ‘Ferganstown, and Ballymacon’ and ‘Athlumney’ Navan, Co. Meath

    A Large-Scale Residential Development - The (Phase 1B) development will consist of the construction of a mixed-use development comprising 322 no. dwellings, a Community Centre and Sports Hall, a Neighbourhood Centre, and a district public park as follows: A) 212 no. houses consisting of 177 no. 3-bedroom houses and 35 no. 4-bedroom houses (all houses 2-storeys except House Types F1, F2, F3 [corner], E1, E2, and E3 [corner] – (with variations to finishes); B) 26 no. duplex units comprising 13 no. 2-bedroom units and 13 no. 3-bedroom units (in 2 no. 3-storey blocks [with 8 no. duplex units abutting Apartment Block 2 in a 3-storey configuration]; C) 84 no. apartments across 3 no. apartment buildings (Block 2 [5-storeys] comprises 24 no. apartments consisting of 12 no. 1-bedroom apartments and 12 no. 2-bedroom apartments), Block 3 [5-storeys above neighbourhood centre – 6-storeys in total] comprising 36 no. apartments consisting of 14 no. 1- bedroom apartments and 22 no. 2-bedroom apartments and Block 4 [4-storeys above community centre – 5-storeys in total] comprising 24 no. apartments consisting of 9 no. 1-bedroom apartments and 15 no. 2-bedroom apartments (all apartments with balconies). D) Series of landscaped/Public Open Space areas of c.3.72 hectares including playground areas and a Public Park of c.1.65 ha of open space as well as additional communal open space for the apartments and duplex apartments; E) Provision of a c. 512 sq. m creche at ground floor of Block 2 as well as a 1,778 sq.m. Community Centre and Sports Hall (including a c.837 sqm sports hall [double height] ancillary changing rooms, 4 no. community rooms and ancillary administration/office space rooms/ESB Substation); F) Provision of a convenience anchor retail unit (net floor space 1,000 sq. m [GFA 1,390 sq. m.]), takeaway, c. 82 sq. m, café, c. 210 sq. m, pharmacy c. 88 sq. m and General Practice Surgery c. 232 sq. m) as well as ESB substation and bins, all accommodated within the ground floor level of the neighbourhood centre to the north-west of the site; G) 693 no. car parking spaces, 289 no. bicycle parking spaces throughout the development; H) Provision of a temporary foul water pumping station (and associated storage) located within the district public park to service the scheme; I) Provision of surface water attenuation measures as well as all ancillary site development works (reprofiling of site and field drain diversions as required)Decision record indexed
    Decision25 March 2025View record
  10. © OpenStreetMap
    2460124Granted

    Ard Rua (Ardroe townland), Claremorris, Co. Mayo

    Planning Permission to construct a residential housing development consisting of 26 number dwelling house units (as previously granted under P04/1928 and P05/2746), the development will consist of 5 detached houses, 10 semi-detached and 11 terrace houses, all as per drawing documents submitted together with all ancillary site works and servicesDecision record indexed
    Decision20 January 2025View record
  11. © OpenStreetMap
    2460131Granted

    Hacketstown Road (Pollerton Road) (R726), Kernanstown, Co. Carlow

    Development at a site of 1.52 Ha. The development will consist of: the construction of 72 No. Residential units and all ancillary works, consisting of: 18 No. 2 storey houses (4 No. 2 bed terraced units (c. 81.8 sqm Gross Floor Area (GFA)); 4 No. 3 bed terraced units (c. 97.5 sqm GFA); and 10 No. 3 bed semi-detached units (c.106.7 sqm GFA); and 54 No. duplex apartment units within 7 No. 2 storey blocks consisting of: 27 No. 1 bed units (ranging in size from c. 52.2 sqm GFA to c. 77.0 sqm GFA); and 27 No. 2 bed units (ranging in size from c. 82.2 sqm GFA to 94.1 sqm GFA); as follows: 1 No. duplex block (Block A type) comprising 3 No. 1 bed units; 3 No. 2 bed units; with balconies on the northern elevation at 1st floor level; 2 No. duplex blocks (Block B type), comprising 12 No. 1 bed units; with balconies on the northern and southern elevations at 1st floor level; 1 No. duplex block (Block C type) comprising 12 No. 1 bed units; with balconies on the eastern, western and southern elevations at 1st floor level; and 3 No. duplex blocks (Block types D, E and J) comprising 24 No. 2 bed units, with balconies on the eastern elevation at 1st floor level. The development will also consist of: modifications to the existing vehicular access from Hacketstown Road (Pollerton Road) (R726); the provision of 2 No. new pedestrian accesses from Hacketstown Road (Pollerton Road) (R726), 107 No. grade level car parking spaces, 18 No. visitor bicycle parking spaces and 2 No. bin storage areas. The development includes all associated landscaping works (including the provision of public and private open space areas), boundary treatments, site development works, site services (foul, surface water drainage, water supply and all other associated site excavation, infrastructural and site development works above and below ground30 conditions indexed
    Decision17 January 2025View record
  12. © OpenStreetMap
    2460412Granted

    Within the townlands of Droichead Nua (Newbridge), and Old Connell Naas Road, Newbridge

    For phase 1 of a 2 phase residential development for some 126 no dwellings on a wider site are of c4ha. The phase 1 will consist of A) The construction of 40 no. residential dwellings and a creche comprising: 32 no. houses (26 no. 3 bedroom dwellings [2 storey] and 6 no. 4 bedroom houses [3 storey]) and 8 no. apartments/duplex apartments comprising 1 no. 2 bedroom apartment and 1 no. 3 bedroom duplex apartment in a separate end of terrace (3 storey) arrangement in 4 locations throughout the site (with apartments/duplex units to include balcony or terrace/private amenity space); B) Vehicular/pedestrian and cyclist access from the Naas Road along with upgrades to the existing vehicular, pedestrian, cyclist and public transport infrastructure along the Naas Road including; the installation of new segregated cycle lanes either side of the Naas Road; a relocated bus stop location at the northern section of the Naas Road and upgraded bus stop at the southern section; a toucan pedestrian crossing across the Naas Road, revised carriageway, and enhanced pedestrian pathways; C) The provision of 62 no. surface resident car parking spaces (including visitor and creche) as well as bicycle storage for apartments; internal road and shared surface networks including pedestrian and cycle paths; D) A 2 storey creche of c. 222 sq. m (with associated play area and parking); E) Provision of c. 0.57 ha of public open space including proposed central square, as well as linear parkways as well as outdoor play areas, and landscaped planting; F) Provision of foul and surface water drainage as well as bin stores; public lighting and all associated landscaping and boundary treatment works, site development and infrastructural works, ESB substations, and all ancillary works necessary to facilitate the development (the proposed development will provide all roads, services [foul & attenuation] and landscaping for the Phase 1 and Phase 2 sites) on this 2.84 ha siteDecision record indexed
    Decision28 November 2024View record
  13. © OpenStreetMap
    LRD0048/S3ERefused

    Within the townlands of ‘Clonard or Folkstown Great’ and ‘Clogheder’,

    The development will consist of the construction of 197 no. dwellings,open space, and ancillary infrastructure will facilitate Phase 4 of the lands at Ladywell in Balbriggan as follows: A) 129 no. terraced and semi-detached houses comprising 55 no. 2-bedroom houses (2 storey), 67 no. 3-bedroom houses (2 storey) and 7 no. 4-bedroom houses (3 storey) [house types with variants]; B) 18 no. terraced and semi-detached 3 bedroom townhouse dwellings; 18 no. Later Living Units (8 no. 1 bedroom & 10 no. 2 bedroom - all bungalows) [house types with variants]; C) 12 no. 1 bedroom Maisonettes in 6 no. 2-storey semi-detached buildings, and 4 no. 1 bedroom apartments in a 3-storey building (all apartments with terraces) along with 1 no. retail/café unit (c.165 sq. m) and 1 no. retail/medical unit (c. 185 sq. m) [including 'back of house area' & both units to be able to be sub-divided and amalgamated]; D) 16 no. duplex apartments (comprising 8 no. 1 bedroom [with terrace] and 8 no. 3 bedroom units) in 4 no. 3 storey buildings; E) Public open space c.0.85 hectares (with an additional c.0.76 hectares of riparian corridor open space), hard and soft landscaping (including public lighting & boundary treatment) and communal/semi-private open space (c. 660 sq. m) for the proposed townhouse, duplex and apartment units; F) Vehicular access will be provided via the Boulevard Road along with the provision of car parking spaces (280 no.), bicycle parking spaces and all internal roads and footpaths and bicycle and bin stores; G) Provision of surface water attenuation measures, (including widening of Clonard Brook), connection to water supply, provision of foul drainage infrastructure to Irish Water specifications and all ancillary site development, construction, and landscaping works [and temporary construction access from local road L1130]; H) The proposal will also amend the layout to elements of the shared layout across the permitted phases to include (Phase 3A [F21A/0055;ABP Ref:312048-21] relating to 29 no. dwellings replaced with 26 no. dwellings, Phase 3B [F22A/0526] relating to layout and Phase 3C [F22A/0670] relating to 3 no. dwellings replaced with 4 no. dwellings and associated amendments to attenuation (Clonard stream) and services. I) Provision of signalised upgrade of the junction of Boulevard Road and the Clonard Road (R122). An Environmental Impact Assessment Report and a Natura Impact Statement have been prepared in respect of the proposed development and submitted with this LRD application. A dedicated website has been set up for the LRD application which can be viewed at https://folkstownlrd.ie/ AI received 09/10/24Grounds not yet categorised
    Decision14 November 2024View record
  14. © OpenStreetMap
    2421Granted

    Carrownacleigha Townland, Coolaney, Co. Sligo

    Development consisting of the following: (1) to retain concrete bases and complete 4 no. houses (two blocks of 2 semi-detached 4 bedroom two-storey houses) and (2) permission to construct 26 no. houses consisting of 12 no. 4 bedroom two-storey semi-detached houses, 12 no. 3 bedroom two-storey semi-detached houses, 2 no. 2 bedroom two-storey semi-detached houses and (3) construct new road with services and connect to existing road and services in the Forthaven Housing Development (previous grant of planning permission PL 04/503 refers), and including all ancillary site development worksDecision record indexed
    Decision14 October 2024View record
  15. © OpenStreetMap
    2460008Refused

    Letter Boleybaun Stangaun Greaghnadarragh Corralustia Turpaun Gortnasillagh West Lugmeeltan Leckaun Lisgavneen Treannadullagh Drumcashlagh and Corderry, Drumkeeran, County Leitrim

    Ten year planning permission with a 40-year operational life (from the date of commissioning of the development). (ii) Construction of 4 No. wind turbines with an overall ground to blade tip height ranging from 149.85m to 150m inclusive. The wind turbines will have a rotor diameter ranging from 115.7m to 117m inclusive and a hub height ranging from 91.5m to 92m inclusive. (iii) Construction of permanent turbine hardstands and turbine foundations. (iv) Construction of a bottomless bridge culvert across a minor stream on site (EPA River Segment Code: 26_4053). (v) Construction of one temporary construction compound with associated temporary site offices, parking areas and security fencing. (vi) Installation of one (40-year life cycle) meteorological mast with a height of 50m and a 4m lightning pole on top. (vii) Construction of new internal site access tracks and upgrade of a section of existing internal Site track, to include all associated drainage. (viii) Improvement of existing site entrance with access via the L4282. (ix) Development of an internal site drainage network and sediment control systems. (x) Construction of 1 no. permanent 20kV electrical substation. (xi) All associated underground electrical and communications cabling connecting the wind turbines to the wind farm substation. (xii) All works associated with the connection of the wind farm to the national electricity grid, which will be via 20kV underground and partially overhead cable connection approximately 6.4km in length to the existing ESB Corderry 110kV Substation in the townlands of Letter, Greaghnadarragh, Stangaun, Corralustia, Turpaun, Gortnasillagh West, Lugmeeltan, Leckaun, Lisgavneen, Treannadullagh, Drumcashlagh and Corderry. (xiii) Ancillary forestry felling to facilitate construction of the development. (xiv) All associated site development works including berms, landscaping, and soil excavation. (xv) Installation of battery arrays located within container units (2 no. units) and associated electrical plant for grid stabilisation adjacent to the substation building. (xvi) Development of one on-site borrow pit.Grounds not yet categorised
    Decision13 March 2024View record
  16. © OpenStreetMap
    2360580Granted

    Townland of Wetland Callan Road, Breagagh Valley, Kilkenny Co. Kilkenny

    For modifications to the apartment building located in the eastern section of the site only and will consist of: A) The reduction in the permitted height of the approved apartment building from 4 storeys to 3 storeys resulting in an overall decrease of 6 no. units (from 32 no. to 26 no. in the apartment building) and consequent reduction in units across the site from 183 to 177 no. units; B) Minor amendment to the building footprint of the approved apartment building to accommodate the provision of new apartment types at ground, first and second floor levels; C) Amendments to the fenestration arrangements on all elevations of the permitted apartment building to accommodate new apartment types, provision of balconies and amendments to finish to elevations; D) Amendments to ancillary apartment areas (plant/meter room and plant/sprinkler tank areas at ground floor level of the apartment building). The overall permitted layout including road layout and services will remain as per the parent permission approved by An Bord Pleanála under the Strategic Housing Development processDecision record indexed
    Decision13 February 2024View record
  17. © OpenStreetMap
    SDZ23A/0004Granted

    In the townland of Adamstown, Lucan, Co. Dublin

    385 dwelling units (139 houses, 70 Build-to-Rent duplex / apartments, 72 duplex / apartments and 104 apartments), ranging between two to six storeys in height comprising the following: - Total of 139 houses consisting of 102 three bedroom two storey terraced houses (House Type: 0, E & F); 11 four bedroom two storey terraced houses (House Type: C); 26 four bedroom three storey terraced houses (House Type: A & B); Total of 70 Build-to-Rent duplex / apartments units consisting of 35 two bedroom units (House Type: J, L & O); 35 three bedroom units (House Type: K, M & P); Total of 72 duplex / apartment units consisting of: - 36 two bedroom units (House Type: J, L & O); 36 three bedroom units (House Type: K, M & P); Total of 104 apartment units accommodated in 2 blocks ranging from four to six storeys consisting of 48 one bedroom units (House Type: A1 & A2); 56 two bedroom units (House Type: B1 & B2); Private rear gardens are provided for all houses. Private patios / terraces and balconies are provided for all duplexes and apartments; Vehicular access to serve the development is provided off the Clonburris Southern Link Street permitted under SDCC Reg. Ref. SDZ20A/0021 and currently under construction. Pedestrian and cycle access is also provided to the Newcastle Road (R120) and to the Clonburris Southern Link Street; All associated and ancillary site development, infrastructural, hard and soft landscaping and boundary treatment works, including: - A single storey tenant amenity building (c. 170 sq.m); Areas of public open space (1.45Ha); 538 car parking spaces and 878 bicycle parking spaces (660 long-term spaces and 218 visitor spaces); Bin and bicycle stores; Plant provided at undercroft level and additional plant provided at roof level (including solar panels) of the proposed apartment blocks; 3 ESB Sub-stations; Demolition of remaining walls and hardstanding associated with a former agricultural building; The development proposed includes minor revisions to an attenuation pond, connections to water services (wastewater, surface water and water supply) and connections to permitted cycle/ pedestrian paths permitted under SDCC Reg. Ref. SDZ20A/0021 on a site (c. 8.94 Ha) in the townland of Adamstown, within the Clonburris Strategic Development Zone (Adamstown Extension). On lands generally bound by the Dublin-Cork Rail Line to the north; Hayden's Lane, the Griffeen River and the undeveloped lands of Clonburris Strategic Development Zone to the east; Lucan Pitch and Putt to the south; and Newcastle Road (R120) to the west. This site consists of Development Areas AE-Sl and AE-S2 within the Clonburris Strategic Development Zone, as prescribed by the Clonburris Strategic Development Zone Planning Scheme 2019; This application is being made in accordance with the Clonburris Strategic Development Zone Planning Scheme 2019 and related to a proposed development within the Clonburris Strategic Development Planning Scheme Area, as defined by Statutory Instrument No. 604 of 2015.Decision record indexed
    Decision15 December 2023View record
  18. © OpenStreetMap
    DZ23A/0028Granted

    Townlands of Laughanstown and Brennanstown, Dublin 18

    Residential development consisting of 56 no. residential dwellings (total c.5151sqm GFA) in a mixture of apartments and duplex units, together with a standalone childcare facility (c.772.5 sqm GFA), all in a range of buildings of 3 to 4 storeys in height on a development tile (T13) of approximately 0.8ha. The overall development proposed comprises of the following: 30 no. apartments in 1 no. block comprising 16 no. 1 bed units and 14no. 2 bed units. 26 no. own door duplex buildings, contained in 2no. 3 storey buildings (Buildings 3 and 4), Building 3 consists of 7no. 2 bedroom units and 7 no. 3 bedroom units, Building 4 consists of 6no. 2 bedroom units and 6 no. 3 bedroom units. Private communal amenity open space (c.635sqm) a 3 storey childcare facility (c.772.5sqm). Provision of 78 no. surface level car parking spaces with 12 no. spaces allocated as creche spaces and 66 no. spaces allocated to the residential development. 94 no. surface level bicycle parking spaces, 2 no. motorcycle parking spaces, provision of a pedestrian/cycle link between Castle Street and Beckett Park (including an entrance to Beckett Park) and all associated and ancillary site development and infrastructurel works, including the provision of bike stores and bin stores, ESB substation, switch room and generator room, hard and soft landscaping and boundary treatment works. The proposed development also consists of minor amendments to the existing Beckett park (permitted and constructed pursuant to Reg Ref DZ15A/0814) comprising approximately 58.5m of new surface water drainage network which will connect the development to the existing surface water drainage network in Beckett Park (constructed under Reg Ref DZ15A/0814) and also 1.8M high railing to the boundaries to Beckett Park with the T13 development tile inclusive of park entrance gates where the new pedestrian/cycle link proposed connects to Beckett Park (both the boundary fence and entrance gate were permitted underReg Ref DZ15A/0814). A new vehicular access serving the proposed development is provided off Castle Street and is an amendment to Roads Phase 1 permitted under DZ15A/0758 (as extended by DZ15A/0758/E and amended by DZ20A/0399 and DZ21A/0664. The application also provides for the use of existing roads/services permitted under DZ15A/0758 (as extended by DZ15A/0758/E and amended by DZ20A/0399 and DZ21A/0664).Decision record indexed
    Decision08 December 2023View record
  19. © OpenStreetMap
    SDZ18A/0011/EPGranted

    Adamstown, Lucan, Co. Dublin

    346 dwellings in a mixture of detached, semi-detached, terraced houses, duplexes and apartments; 133 houses consisting of 13 two storey 3 bedroom detached houses, 83 two storey 3 bedroom terraced houses, 3 three storey 4 bedroom detached houses, 8 three storey 4 bedroom semi-detached houses and 26 three storey 4 bedroom terraced houses; 96 duplexes consisting of 4 storey buildings with 48 three bedroom units and 48 two bedroom units; 117 apartments located in a total of 4 buildings ranging in height from three 4 - 5 storey's and one 3 - 5 storey's and consist of 16 three bedroom apartments, 41 no two bedroom apartments and 60 one bedroom apartments; dwellings are provided with solar panels on the roof as required; provision of a childcare facility of approx. 841sq.m; provision of c 0.47 Ha of public open space; vehicular access to serve the proposed development is provided off Adamstown Way and Adamstown Park, with additional access possible through the existing/permitted roads at St. Helen's Phase 1 (Ref. SDZ17A/0002) and also off Adamstown Boulevard and a re-aligned Tandy's Lane (the subject of a concurrent application under Ref. SDZ18A/0009); all ancillary and associated site development and landscape works in the townlands of Finnstown and Adamstown on lands generally bound to the east by lands with permission for 135 residential units (Ref. SDZ17A/0002) and loop Road 1/Adamstown Park (Ref. SDZ17A/0007), to the west by the alignment of the Adamstown Boulevard and Airlie House, to the north by a planned realignment of Tandy's Lane and to the south by Adamstown Way; part of the subject site is within the curtilage of Airlie House (Protected Structure). However, no works are proposed to the Protected StructureDecision record indexed
    Decision22 November 2023View record
  20. © OpenStreetMap
    F23A/0530Granted

    Lands in the townlands of Ballymacartle and Greenwood, Parish of Kinsa

    Planning permission for revisions to previously permitted development Reg. Ref. F16A/0152, Reg. Ref. F16A/0152/E1A as amended by Reg. Ref. F22A/0562. The proposed revisions to the permitted development comprise the replacement of 02 no. Type A 4 - bed units at sites numbers no. 26 and 27 with 04 no. Type C 3 - bed units, resulting in an increase of 02 no. units along with all associated site development works. Note: There was a parent permission for two houses so net increase for F23A/530 is 2 three bedroom houses ( filled in on development details and Spatial tabs.Decision record indexed
    Decision26 October 2023View record
  21. © OpenStreetMap
    2360325Granted

    Monavallet Carnalughoge Tullycahan Priorstate Artoney Lowrath North Rathbrist Mullacrew Kilcroney Glydefarm Corbollis Bogtown Dowds, Dundalk, Co Louth

    EirGrid PLC, with the consent and approval of the Electricity Supply Board (ESB), intend to apply to Louth County Council for permission for works associated with the proposed uprate of the existing Louth –Woodland 220 kV overhead powerline (OHL) between the existing Louth 220 kV substation in the townland of Monavallet and the existing Woodland 220 kV substation in the townland of Woodland, County Meath. The Louth – Woodland 220 kV OHL is approximately 61.5 km long and comprises 207 no. steel lattice tower structures. The existing circuit is located within the functional area of Louth County Council and Meath County Council. Approximately 23 km of the existing OHL circuit is located within the functional area of Louth County Council and approximately 38.5 km is within the functional area of Meath County Council. A separate planning application is being lodged with Meath County Council. The Proposed Development within the functional area of Louth County Council is located in the townlands of Monavallet, Carnalughoge, Tullycahan, Priorstate, Artoney, Lowrath North, Rathbrist, Mullacrew, Kilcroney, Glydefarm, Corbollis, Bogtown, Dowdstown, Cudderstown, Scogganstown, Stickillin, Hoathtown, Baltrasna, Hacklim, Millockstown, Anaglog, Belpatrick, and Collon. The Proposed Development works within the functional area of County Louth will comprise: • the replacement (“restringing”) of the existing overhead line circuit conductor with a new higher capacity conductor; • the strengthening of up to 26 no. tower foundations; • the replacement of hardware and fittings, such as insulators, insulator hardware, earthwire hardware, anti-climbing guards and bird warning spheres at various locations; • the replacement of suspension clamps and vibration dampers at all structure locations; • all associated temporary site development works to gain access to the existing structures including clearance of vegetation, disassembly and reassembly of gate posts / piers and removal and reinstatement of existing fencing; and • other temporary associated and ancillary development works required for the purpose of the uprate of the existing circuit, including temporary guard poles, construction compounds, the installation of silt traps, silt fences, stone tracks, ground protection mats and temporary watercourse crossings. This application includes a Natura Impact Statement (NIS)Decision record indexed
    Decision20 October 2023View record
  22. © OpenStreetMap
    DZ17A/0714/EGranted

    Lands in the townlands of Lehaunstown and Cherrywood, Dublin 18. The application relates to development in the Cherrywood Strategic Development Zone.(Domville site)

    Permission for a residential scheme of 322 no. units and a crèche facility in buildings ranging in height from 2 to 4 storeys set around 3 principal public amenity spaces. The residential units will comprise 242 no. apartments and 80 no. houses. The apartments will be accommodated in 8 no. 4-storey blocks (over part basement). The apartments will have associated private balconies/terraces. Block A will accommodate 50 no. units comprising 18 no. 1-bedroom and 32 no. 2-bedroom units. Block B will accommodate 32 no. units comprising 13 no. 1-bedroom, 12 no. 2-bedroom and 7 no. 3-bedroom units. Block C will accommodate 12 no. units comprising 6 no. 1-bedroom and 6 no. 2-bedroom units. Block D will accommodate 32 units comprising 2 no. studio units, 14 no. 1-bedroom and 16 no. 2-bedroom units. Block E will accommodate 32 no. units comprising 6 no. 1-bedroom and 26 no. 2-bedroom units. Block F will accommodate 20 no. units comprising 1 no. studio unit, 11 no. 1 bedroom and 8 no. 2-bedroom units Blocks G and H will each accommodate 32 no. units comprising 6 no. 1-bedroom and 26 no. 2-bedroom units. Block C will accommodate a crèche facility at ground floor level. The houses will consist of 41 no. 3-bedroom units and 39 no. 4 bedroom units, ranging in height from 2 to 3 storeys. The majority of the houses (76) will be in terraces of between 3 and 10 houses, with 2 pairs of semi-detached units. All houses will be provided with surface level car parking. Two separate basements are proposed which will accommodate 338 no. car parking spaces to serve the apartments and crèche, bicycle parking (242 spaces), refuse storage and plant. The development includes the following external road and drainage infrastructure previously permitted by the Planning Authority, which will provide access and services to the development: - A section of Grand Parade from the existing Tully Vale Road to the junction with Gun and Drum Hill Road; A section of Gun and Drum Hill Road from the junctions of Grand Parade to Tully Park Access Road; Tully Park Access Road; Attenuation pond in Lehaunstown Valley, east of Tully Vale apartments. The development will include new internal access roads, surface level car parking (174 spaces) and bicycle parking, landscaping and boundary treatments; part of the new landscaped Greenway connecting Tully Park and Lehanustown Valley and all associated site development works and services, Sustainable Urban Drainage Systems (SUDS) components will include green and blue roofs, detention basins, underground modular storage and swales.The application relates to a development in the Cherrywood S.D.Z.2 conditions indexed
    Decision06 September 2023View record
  23. © OpenStreetMap
    ABP31428122Refused

    C. 3056 ha in townland of Carrickmines Great, c. 750m south of M50 Motorway Junction 15 (Carrickmines) & c.300m to south-east of Glenamuck Road South, immediately east of Cairnbrook residential development

    : The proposed development for which a seven year permission is sought is described as follows in the public notices: The proposed development seeks to demolish existing outbuildings on site and provide for the construction of 167 no. residential units, a childcare facility with a GFA of 188 sq.m., associated internal roads, pedestrian and cycle paths, open space, and all associated site and infrastructural works. The residential component of the development consists of 98 no. apartments and 69 no. houses, to be provided as follows: • 30 no. 1-bed apartments; • 47 no. 2-bed apartments; • 21 no. 3-bed apartments; • 43 no. 4-bed (Type A, A1 and D) houses; • 26 no. 3-bed (Type B, C and E) houses; The 98 no. apartments are to be provided within 3 no. apartment buildings of 5 no. storeys in height, each over basement level, with adjacent surface car parking. The houses consist of 2 and 3 storey terraced, semi-detached and detached dwellings. The proposal contains a total of 237 no. car parking spaces, including 173 no. at surface level and 64 no. at basement level, 253 no. bicycle parking spaces, including 34 no. at surface level and 219 no. secure spaces at ground floor level of the apartment buildings, and 6 no. motorcycle parking spaces at basement level. The vehicular access to the development is to be provided from Cairnbrook residential estate to the west, including associated works to facilitate same. A vehicular entrance is also proposed from Springfield Lane to access the house proposed on the northern part of the site. Pedestrian and cycle links are proposed to Springfield Lane to the north and to link to the permitted development (Reg. Ref.: PC/H/01/19) at Rockville Drive / Glenamuck Cottages to the south. Bin stores, plant rooms and block cores are located at basement and ground floor level of the apartment buildings. The proposed development includes private amenity space, consisting of balconies / terraces for all apartments and private gardens for the houses, public and communal open space, including children’s play areas and an ancillary play area for the childcare facility, PV panels and green roofs at roof level of the apartment buildings, public lighting, utilities infrastructure and an ESB Substation. The proposal includes all associated site and infrastructural works, including tie-ins to existing infrastructure in the Cairnbrook residential estate, foul and surface water drainage, attenuation tanks, hard and soft landscaping, boundary treatments, internal roads, cyclepaths and footpaths. Website: https://carrickminesgreatshd.ie/Grounds not yet categorised
    Decision31 August 2023View record
  24. © OpenStreetMap
    23323Refused

    IN THE TOWNLAND OF, EDENDERRY, CO. OFFALY

    A PROPOSED RESIDENTIAL DEVELOPMENT OF 48 UNITS COMPRISING OF A RESIDENTIAL MIX OF 26 NO. 1 BED APARTMENTS, 13 NO. 2 BED APARTMENTS AND 9 NO. 3 BED TERRACE HOUSES, CAR & BICYCLE PARKING, OPEN SPACES, PLAY AREAS, LANDSCAPING AND ALL ASSOCIATED SITE WORKS AT LANDS LOCATED TO NORTH-WEST OF EDENDERRY MAIN STREET AND TO THE SOUTH OF EDENDERRY SHOPPING CENTRE AT DOWNSHIRE ROAD AND TO THE NORTH OF ST FRANCIS STREET AT DOWNSHIRE DRIVEGrounds not yet categorised
    Decision30 August 2023View record
  25. © OpenStreetMap
    SDZ22A/0017Granted

    Within the townland of Cappagh, Clonburris, Dublin 22

    Construction of 157 dwellings within the Clonburris South-West Development Area of the Clonburris Strategic Development Zone (SDZ) Planning Scheme 2019 consisting of, 81 houses comprising of 4 two bedroom houses, 65 three bedroom houses and 12 four bedroom houses (all two storey with associated private open space and car parking; 76 apartment units consisting of 26 one bedroom and 50 two bedroom units within Block 1 (4 storeys); Vehicular access will be provided from the permitted street under SDZ21A/0022 and the permitted Clonburris Southern Link Street (SDZ20A/0021) and R113 (Fonthill Road) to the east; All ancillary site development works including footpaths, landscaping boundary treatments, public and private open space areas, car parking (170 spaces) and bicycle parking (170 spaces), single storey ESB sub-stations, bin and bicycle stores and all ancillary site development/construction works all on wider lands bounded generally by the Dublin-Cork railway line to the north, undeveloped lands and Grand Canal to the south and undeveloped lands and the Fonthill Road (R113) to the east, in accordance with the Clonburris Strategic Development Planning Scheme Area, as defined by Statutory Instrument No. 604 of 2015.Decision record indexed
    Decision16 May 2023View record
  26. © OpenStreetMap
    22221502Granted

    Finlay Park, Naas, Co. Kildare.

    LARGE SCALE RESIDENTIAL DEVELOPMENT: Planning permission for a Large Scale Residential (LRD) Development at this site (of c. 2.9 hectares) at lands within the townland of Naas West, 'Finlay Park', Naas, Co. Kildare. The proposed development will consist of the construction of 134 No. apartments (comprising a mixture of 70 No. 2 storey apartments and 64 No. single storey apartments) as follows: 22 No. 1 bedroom apartments, 77 No. 2 bedroom apartments and 35 No. 3 bedroom apartments with private open space provided in the form of balconies or terraces as follows: (A) Block A (4 storey apartment block) comprising 26 No. apartments (6 No. 1 bed units, 16 No. 2 bed units and 4 No. 3 bed units); Block B (part 4, part 5 storey apartment block) comprising 66 No. apartments (10 No. 1 bed units, 33 No. 2 bed units and 23 No. 3 bed units), with a commercial/health/medical unit (c. 247.6 sqm) at ground floor; Block C (part 4, part 5 storey apartment block) comprising 42 No. apartments (6 No. 1 bed, 28 No. 2 bed units and 8 No. 3 bed units); (B) Vehicular/pedestrian and cyclist access from the Old Caragh Road (in new arrangement) along with the provision of 201 No. undercroft and surface car parking spaces as well as 388 No. undercroft and surface cycle parking spaces; internal road and shared surface networks including pedestrian and cycle paths; (C) Public Open Space including proposed plaza, as well as central communal (courtyard) open space including outdoor playground area at podium level; (D) 1 No. temporary (for 3 No. years) 3-sided signage structure (c. 4.5m in height) at the entrance to the proposed development; (E) Provision of foul and surface water drainage, including relocation of existing foul main in northern part of site as well as green roofs; linear greenway path, bin stores; plant rooms; public lighting and all associated landscaping and boundary treatment works, site development and infrastructural works, ESB substations, and all ancillary works necessary to facilitate the development. A dedicated website has been set up for the LRD application which can be viewed at www.finlayparklrd.ieDecision record indexed
    Decision30 March 2023View record
  27. © OpenStreetMap
    SHD/015/20Granted

    Castlelands, in the townland of Hampton Demesne, Kilsough North and Ba

    ABP-313210-22 To view details of this development please visit www.castlelandsshd.com A 10 year planning permission for a Strategic Housing Development. The subject lands are accessed from the Castlelands roundabout to the northwest, to the west by Castleland Park View, Tanners Water Lane to the south and Pinewood Green to the north; bound by the Dublin- Belfast trainline and the R127 Skerries Road to the east, adjacent residential areas of Pinewood Green to the north and Ardgillen to the west. The application site is 25.33 hectares in size. The proposed development consists of 817 no. residential units comprising of 162 no. 1-bed units, 250 no. 2-bed units (180 no. 2-bed apartments and 70 no. 2-bed houses), 381 no. 3-bed units (72 no. 3-bed apartments, 26 no. 3 bed duplexes and 283 no. 3-bed houses) and 24 no. 4 bed houses ranging in height from 1 - 6 no. storeys on an overall site of 25.33 ha. The residential neighbourhoods are set out as follows: • Neighbourhood 1 consists of 242 units varying between 2 and 6 storeys in height • Neighbourhood 2 consists of 163 units varying between 2 and 3 storeys in height • Neighbourhood 3 consists of 153 units varying between 2 and 3 storeys in height • Neighbourhood 4 consists of 103 units 2 storeys in height • Neighbourhood 5 consists of 156 units 2 storeys in height The proposed development will also provide for 1 no. creche facility (869sqm) including a 237 sqm outdoor play area and 1 no. retail unit (616 sqm) and an office (155 sqm) located in Neighbourhood 1. The proposed development provides for the completion of the Castlelands Link Street, which extends to approximately 870 metres in length from the existing Castlelands roundabout in the west to the Skerries Road (R127) in the east. It provides for access to the residential development and includes a bridge over the existing railway line, and the realignment of part of the existing Skerries Road. This road will incorporate footpath and cycle tracks on both sides of the carriageway. The development also includes a network of internal roads serving the development. 1,033 no. car parking spaces are proposed to serve the development (1,010 residential and 23 spaces for the proposed creche and retail unit) located at surface level. 1092 no. bicycles spaces are proposed to serve the entire development. This consists of 812 no. long stay spaces to serve the proposed apartment/ duplex units and 280 no. shorts stay spaces to serve visitors to the proposed development. 2.16 Hectares of public open space is proposed to serve the future residents of the scheme which equates to c. 11.8% of the net developable area. 0.83 Hectares of communal open space is being provided to serve the residents of the proposed apartment units. The development will also provide for all associated ancillary site development infrastructure including: ESB sub-stations, bike stores, bin stores, plant rooms, public lighting, new watermain connection and foul and surface water drainage; internal roads & footpaths; site landscaping, including boundary treatments; associated scheme signage, and all associated engineering and site works, including a temporary diversion of the R127, necessary to facilitate the development. The existing overhead infrastructure will be diverted underground. An Environmental Impact Assessment Report has been prepared in respect of the application and accompanies this application. The application contains a statement indicating why permission should be granted for the proposed development, having regard to a consideration specified in Section 37(2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development materially contravenes a relevant development plan or local area plan other than in relation to the zoning of the land.Decision record indexed
    Decision21 March 2023View record
  28. © OpenStreetMap
    22281Granted

    Former Carmelite Monastery, Legan Townland, The Newtown Moate

    Development of a multi-unit residential scheme comprising a total of 26 No. residential units on a site of 0.59 Ha, at the Former Carmelite Monastery (Protected Structure) and grounds. The development will consist of: (1) Demolition of 2 No. two-storey dormitory buildings and 2 No. agricultural buildings on the site; (2) Modifications to former Carmelite Monastery residential building consisting of the re-use, remodelling and extension of the existing three-storey protected structure to provide 9 No. apartments, comprising 4 No. 2-bedroom apartments and 5 No. 1-bedroom apartments; (3) Construction of 14 No. two-storey semi-detached dwellings to the rear (east) of the protected structure; and (4) Associated site works including car parking, communal amenity space, hard and soft landscaping, boundary treatments and all above and below ground works associated with connection to services; This application relates to a proposed development consisting of the carrying out of works to, and within the curtilage of, a protected structure (Former Carmelite Monastery, WCC RPS Ref. No. 030-054, NIAH Reg. No. 15317066). Part of the proposed development is located within an Architectural Conservation Area.Decision record indexed
    Decision20 December 2022View record
  29. © OpenStreetMap
    SD17X/0001Granted

    Coillte's Hell Fire and Massy's Wood forest, in the townlands of Mountpelier, Killakee & Jamestown, in South Dublin.

    South Dublin County Council intends to lodge an application with An Bord Pleanála under section 175(3) of the Planning & Development Act 2000 (as amended) for the approval of the “Dublin Mountains Visitor Centre” Development. The site of the proposed development is Coillte's Hell Fire and Massy's Wood forest properties (totalling c.152 ha) in the townlands of Mountpelier, Killakee and Jamestown in South Dublin. Development is also proposed along stretches of the R115 and R113 regional roads connecting the site to the urban areas of Woodtown and Ballycullen to the north. Development is also proposed along stretches of the R115 and R113 regional roads connecting the site to the urban areas of Woodtown and Ballycullen to the north. The proposed development includes (a) the conversion of 26 ha of Coillte’s Hell Fire forest property from productive conifer forest to mixed deciduous woodland for use primarily as amenity open space; (b) modifications, including new sections of trail, and upgrade of the existing network of walking and equestrian trails throughout the Hell Fire and Massy’s Wood forest properties; (c) construction of a ‘tree canopy walk’/pedestrian bridge over the R115 to link the trail networks of the two properties, with a ‘bridge house’ at the Hell Fire end of the bridge; (d) conservation works to the Hell Fire Club building (South Dublin Record of Protected Structures ref. 388) and the architectural heritage of the Massy’s Wood property including the walled garden (part of South Dublin Record of Protected Structures ref. 384); (e) installation of heritage interpretation signage along the network of trails; (f) construction of a new parking area for 275 no. cars (including 14 no. disabled spaces) and five coach spaces to replace the existing parking area on the Hell Fire forest property; (g) construction of a visitor centre comprising two buildings (one single storey and one two-storey) side-by-side at an elevation of c. 300m on the Hell Fire forest property, with a combined gross floor area of 980 sqm, accommodating the following uses/spaces: audio-visual/exhibition facility (101 sqm), education room (55 sqm), café with seating area (175 sqm), servery (36 sqm) and kitchen (60 sqm), ‘Ramblers’ Lounge’ (43 sqm), retail (45 sqm), kiosk (27 sqm), toilets (66 sqm), facility management offices (55 sqm), and associated reception, circulation, plant and storage spaces; (h) construction of a stand-alone electricity substation (23 sqm); (i) installation of a new watermain line and sewage pipe under the R115 from the Hell Fire property to the existing watermain and public sewer network; (j) construction of a network of swales and ponds for attenuation of surface run-off, and a culvert beneath the R115 to channel overflow of surface water into the Glendoo Brook; (k) modifications to the existing entrance to the Hell Fire forest property; (l) installation of new fences along sections of the Hell Fire property boundary; (m) all ancillary works and landscaping on the Hell Fire and Massy’s Wood properties. It is proposed to make modifications to the stretches of the R115 and R113 roads connecting the site to the urban area to the north, including the provision of a footpath (minimum 1.5m width) and an advisory cycle lane (1.5m width), and the retention of a carriageway of sufficient width for two-way traffic except at one location where a single lane traffic shuttle is proposed. The proposed modifications to the roads do not require encroachment into adjoining private lands, but do require localised widening of the R115 by 1.2m into the Massy’s Wood property for a stretch of c.100m. An Environmental Impact Assessment Report (EIAR) has been prepared in respect of the proposed development. The application and the EIAR may be inspected free of charge during office hours, or purchased at the offices of South Dublin County Council, County Hall, Tallaght, Dublin 24, and An Bord Pleanála, 64 Marlborough Street, Dublin 1, until 25 September 2017Decision record indexed
    Decision24 October 2022View record
  30. © OpenStreetMap
    SDZ21A/0022Granted

    Within the Townlands of Cappagh, Clonburris Little & Kishoge, Co. Dublin

    The construction of 569 dwellings, a creche, innovation hub and open space in the Clonburris South West Development Area of the Clonburris SDZ Planning Scheme 2019 as follows: 173 houses comprising 8 two bedroom houses, 153 three bedroom houses and 12 four bedroom houses (147 dwellings in CSW-S4 consisting of 8 two bedroom houses, 127 three bedroom houses & 12 four bedroom houses & 26 three bedroom dwellings in CSW-S3}, all 2 storey comprising semi-detached, terraced, end terrace units (with parking and private open space); (B) 148 duplex apartments/apartments {88 in CSW-S4 & 60 in CSW-S3) comprising 74 two bedroom units and 74 three bedroom units, in 16 three storey buildings. In CSW-S4 Duplex Blocks A,B,C,D,E,F,G,J,K, comprise 8 units (4 two bed & 4 three bed units), Duplex Block H comprises 16 units (8 two bed & 8 three bed units), In CSW-S3 Blocks L, N & O comprise 8 units (4 two bed & 4 three bed units), Block M comprises 14 units (7 two bed & 7 three bed units), Block P comprises 10 units (5 two bed & 5 three bed units), Block Q comprises 12 units {6 two bed & 6 three bed units), all to have terraces/pitched roof; (C) 396 apartments as follows: within CSW-S4, Block 1 consists of 172 apartments (76 one bedroom, 91 two bedroom and 5 three bedroom apartments), in a 2-building arrangement both 6 storeys in height. Within CSW-S3, Block 2 {4 storeys) comprises 16 one bedroom apartments and 22 two bedroom apartments, Block 3 (4 storeys) comprises 16 one bedroom apartments and 22 two bedroom apartments (all apartments to have terrace or balcony); (D) Provision of an innovation hub (626sq.m) and creche (c. 547sq.m) in a part 3/4 storey 'local node' building in CSW­S4; (E) Vehicular access will be from the permitted Clonburris Southern Link Street (SDZ20A/0021) and R113 to the east {along with provision of internal haul routes {for construction) to connect to the R136 to the west); (F) Public Open Space/landscaping of c. 4.1 hectares (to include Local Park and MUGA in CSW-S3, Grand Canal Park, along the southern and eastern boundaries of the site to connect to existing Grand Canal towpath) as well as a series of communal open spaces to serve apartments and duplex units (c. 0.39 ha); (G) all ancillary development works including footpaths, landscaping boundary treatments, public, private open space areas, car parking (656 spaces) and bicycle parking (672 spaces), single storey ESB substations/bike/bin stores, 'Gateway' entrance signage (2), solar panels at roof level of apartments, and all ancillary site development/construction works; (H) Permission is also sought for revisions to attenuation permitted under SDZ20A/0021 as well as connection to water supply, and provision of foul drainage infrastructure; this application is being made in accordance with the Clonburris Strategic Development Zone Planning Scheme 2019 and relates to a proposed development within the Clonburris Strategic Development Planning Scheme Area, as defined by Statutory Instrument No. 604 of 2015; an Environmental Impact Assessment Report accompanies this planning application; the application applies for 7-year planning permission for development at this site of c. 17.02 hectares (on two parcels of land to include entrance area) within the townlands of Cappagh, Clonburris Little & Kishoge, Co. Dublin all on wider lands bounded generally by undeveloped lands and the Dublin-Cork railway line to the north, undeveloped lands and the Grand Canal to the south, the R113 {Fonthill Road) to the east and the R136 to the west.Decision record indexed
    Decision23 August 2022View record
  31. © OpenStreetMap
    21/6053Refused

    Farnahoe (townland) Innishannon Co. Cork

    The construction of 26 no. dwelling houses and all associated ancillary site development works including access, footpaths including a new footpath along the L-6067-0, parking, drainage, landscaping and amenity areas. The proposed dwelling units will replace 4 no. residential units previously permitted along the south east boundary of the site under Cork County Council Ref. 13/4528 (Extended under Ref. 18/7090).Grounds not yet categorised
    Decision18 July 2022View record
  32. © OpenStreetMap
    21599Granted

    Drumbiggle, Ennis, Co Clare

    For development at this site on lands to the west of Pairc na Coille Retirement Village, in the townland of Drumbiggle, Ennis, County Clare. The development will consist of: 1) Construction of 58 no. residential units comprising: 10 no. four-bed houses, 26 no. three-bed houses, and 22 duplex units comprsing 11 no. two-bed ground floor apartment units with 11 no. three-bed house units above. 2) Alterations and upgrade to the existing access road to provide additional footpath, cycle paths and raised traffic tables. 3) Shared communal and semi-private open space, car and bicycle parking, bin stores, site landscaping/boundary treatment works and public lighting. 4) Provision of all associated surface water and foul drainage services and all associated site development works. The application is accompanied by a Natura Impact Statement (NIS)Decision record indexed
    Decision11 March 2022View record
  33. © OpenStreetMap
    211113Granted

    Station Road, Townland of Piercetown, Newbridge

    Residential development consisting of 52 No. units. The proposed development comprises of: (a) 3 No. 3 storey blocks accommodating 26 No. 2 bed ground floor apartments, with 26 No. 3 bed duplex units at 1st and 2nd floors, with associated bin and bicycle stores. (b) Access roads, surface car parking, drainage, extensive landscaping and all associated site development works. Revised by Significant Further Information which consists of the 3 no. apartment block designs / architectural style has been amended to include modifications to site layout planDecision record indexed
    Decision09 February 2022View record
  34. © OpenStreetMap
    21635Granted

    Forest Park Manor, Drum or Warren Townland, Carrick Road Boyle

    Retention Permission to retain as constructed dwelling house nos. 5, 6, 7, 9, 14, 16, 17, 18, 19, 21, 22. 23, 24, 25, 26 & 27 and retain as constructed common areas, road and footpath layout with associated services etc., which is at variance to the development permitted under Planning Register Ref No. PD/03/1470 and An Bord Pleanala Reference No. PL 20.207502 with completion of all outstanding site works atDecision record indexed
    Decision10 January 2022View record
  35. © OpenStreetMap
    F20A/0550Granted

    Airfield in the townlands of, Cloghran, Corballis, Forrest Great, Forr

    For full planning permission to extend the North Apron in the Airfield at Dublin Airport, Co Dublin to facilitate the provision of twelve aircraft stands and a ground servicing equipment area on a site of 19.2ha. The development will consist of: * The expansion of the North Apron at Dublin Airport to provide twelve replacement Code C aircraft stands and ground servicing equipment storage area; * Construction of a 520m long by 6m high blast fence on the northern and western boundary of the extended Apron and ground servicing equipment area; * Construction of a 20m long by 6m high blast fence southwest of the Apron; * Construction of a 550m service road immediately to the north of the twelve replacement Code C aircraft stands to provide access for service vehicles; * Rehabilitation of existing pavement; * Construction of two new underground attenuation tanks on 9000m² of existing grassland; * Provision of a total organic carbon analyser enclosure; * Provision of drainage and electrical infrastructure; * Provision of Aerodrome Ground Light (AGL) installations this includes underground ducting to provide power to centreline lights and new edge lights; * Provision of 26 No. High Mast Lights; * Modifications to internal airside fencing, service road infrastructure and provision of construction site security fencing; * Provision of a temporary construction site compound and modification to the Airfield security fence to temporarily change part of the construction site form 'airside' with access restrictions to 'landside'; * Provision of road and stand pavement markings, Stand id-signs and High Mast Lighting (HML); * The application includes all associated site development works and services; * This planning application is accompanied by an Environmental Impact Assessment Report (EIAR). AI received 08/07/21 SAI (Revised Public Notices) received 08/07/21 CAI received 30/09/21 CAI deemed significant revised public notices (SCAI) received 14/10/21Decision record indexed
    Decision08 December 2021View record
  36. © OpenStreetMap
    21595Granted

    Kiltorcan and Ballyhale, Co. Kilkenny

    For alterations to the previously granted solar farm in the townlands of Ballyhale and Kiltorcan (Kilkenny County Council Reg Ref. 16592, and An Bord Pleanala Reg Ref. PL10.247616) as amended by Kilkenny County Council Reg Ref. 19538. Permission was originally granted for a Solar photovoltaic installation comprising up to 26,100m2 of solar panels on ground mounted frames, 4 no. inverters housed in 2 units, 1 no. 20kV substation, security fencing, new entrance onto public road, access tracks, CCTV; underground cable and ducts including underground cable and ducts along the public road to the entrance of the existing Ballyhale substation within the townland of Kilcorcan, Co. Kilkenny and all associated ancillary development works and services. Permission was sought for a period of 10 years. Permission was subsequently granted for the addition of 4 no. battery storage containers and extension to the operational period of the solar farm from 25 years to 30 years. Permission is now sought for the following: increase the area of solar panels from up to 26,100 m2 to up to 30,500 m2; increase in height to the permitted solar panels from 2.72m to 2.82m and; permission to increase the operational period of the solar farm from 30 years to 35 years. A Natura Impact Statement (NIS) accompanies this application. Planning permission is sought for a period of 10 years.Decision record indexed
    Decision01 September 2021View record
  37. © OpenStreetMap
    21/235Granted

    25 and 26 Copper Point Skull Townland Schull Co. Cork

    Construction of 2 no. two storey (3 bed) dwellings, 4 no. car parking spaces and all associated site works on lands where development was previously permitted under Plannning Ref. Numbers 05/1839, 08/1110 and was extended under 13/426Decision record indexed
    Decision24 August 2021View record
  38. © OpenStreetMap
    SDZ20A/0021Granted

    In the townlands of Adamstown, Grange, Kishoge, Clonburris Litte & Cappagh, Co. Dublin

    10 year permission for roads and drainage infrastructure works as approved under the Clonburris Strategic Development Zone Planning Scheme (2019) to form part of the public roads and drainage networks providing access and services for the future development of the southern half of the overall Strategic Development Zone (SDZ) lands; the roads infrastructure works are for the construction of c. 4.0km of a new road, known as Clonburris Southern Link Street, generally consisting of 7m wide single carriageway, plus on either side of the carriageway landscaped verges, 1.75m wide off-road cycle tracks and 2m wide footpath including public lighting, trees, 288 on-street car parking spaces (including 26 disabled parking spaces), pedestrian crossings, bus stops, a number of vehicular access spurs to facilitate future development of adjoining lands, a total of 8 new junctions (including 3 junctions to facilitate future road developments within the SDZ; 2 junctions with proposed local access roads and 3 new junctions with Hayden's Lane, Lynch's Lane and Ninth Lock Road) and alterations to 4 existing junctions on Newcastle Road (R120), Grange Castle Road (R136), Fonthill Road (R113) and also to the existing access road to Park and Ride facilities at both Kishoge Station and at Fonthill Station; alterations to the existing public roads Newcastle Road (R120), Hayden's Lane Access Road, Hayden's Lane, Lynch's Lane, Grange Castle Road (R136), Fonthill Road (R113) and Ninth Lock Road arising from new junctions with the Clonburris Southern Link Street consisting of reconfiguration of a c.165m long section of Newcastle Road (R120) including road widening and revisions to layout of junction with Hayden's Lane Access Road; incorporation of Hayden's Lane Access Road into proposed Clonburris Southern Link Street; provision of new junction with Hayden's Lane and Clonburris Southern Link Street; incorporation of a c. 26m long section of Lynch's Lane into proposed Southern Link Street and provision of a new junction with Clonburris Southern Link Street; reconfiguration of a c. 260m long section of Grange Castle Road, including road widening and replacement of existing roundabout with signalised junction; reconfiguration of a c. 250m long section of Fonthill Road, including road widening and replacement of existing roundabout with signalised junction; reconfiguration of a c.125m long section on Ninth Lock Road including road widening and provision of a new junction with Clonburris Southern Link Street; construction of 2 local access roads, consisting of c. 110m long road extending north from Clonburris Southern Link Street and providing access to proposed foul pumping station and generally consisting of a 6m wide single carriageway plus on either side of the carriageway 2m wide footpath including public lighting, 2 set-down parking spaces and vehicular access to proposed foul water pumping station; north/south Link Street (c. 240m in length) extending north from southern Link Street to the Kildare-Cork railway line and generally consisting of a 7m wide single carriageway plus on either side of the carriageway 1.3m wide landscaped verge, 1.75m wide off-road cycle lane, 2m wide footpath including public lighting and 2 vehicular access spurs to facilitate future development of adjoining lands; the drainage infrastructure works include 8 attenuation systems (with outfalls to Griffeen River, Kilmahuddrick Stream and existing storm sewers) including 4 ponds, 2 modular underground storage systems and 2 detention basins combined with modular underground storage systems all adjacent to proposed Clonburris Southern Link Street; surface water drainage culverts to existing watercourses; flood water compensation area adjacent to Griffeen River; surface water drainage and water supply trunk infrastructure within proposed road corridors; wastewater infrastructure including a foul pumping station and pipe network within proposed road corridors to facilitate drainage connections to future wastewater drainage infrastructure within the adjoining SDZ lands (including future Irish Water pumping station) and to connect to the existing sewer network in Cappaghmore housing estate; ducting for public electrical services and utilities and the diversion of existing utilities is provided for within the proposed road corridor; Permission is also sought for all ancillary site and development and landscape works associated with the development including hard and soft landscaping, boundary treatments, road markings and signage, enabling works and temporary construction works (including site accommodation, site compounds and temporary boundary fencing); the application is made in accordance with Clonburris Strategic Development Zone Planning Scheme 2019 and relates to a proposed development within the Clonburris Strategic Development Zone Planning Scheme Area as defined by Statutory Instrument No. 604 of 2015; an Environmental Impact Assessment Report accompanies the application.Decision record indexed
    Decision12 August 2021View record
  39. © OpenStreetMap
    21309Granted

    Cookstown Townland, Cookstown Road, Enniskerry

    Extend the appropriate period of 16/976 - development comprising 6 no. detached, two-storey dwellings on 0.9ha. (gross) site (0.8ha site area net of sewer wayleave)and for all associated site development, road, boundary and landscaping works on 0.8ha. site. Vehicular access to be from existing driveway which is to be widened, with widened junction with Cookstown Rd (L1020). The proposal includes removal of trees from the road boundary opposite the access, to provide sightlines for vehicles. Foul sewage to drain via new gravity main from 0.8ha. site through adjacent lands on south side of Cookstown Rd. to connect to permitted found sewage pumping station to west (Wicklow Co. Council ref. no. 14/1704: An Bord Pleanala ref. no. PL27.246401, grant of permission for 26 dwellings), which then discharges by gravity to public main in Church Hill 8(R460). Area of sewer wayleave 0.1ha.Decision record indexed
    Decision12 May 2021View record
  40. © OpenStreetMap
    20513Granted

    Clonoose Big, Ballyheelan, Co Cavan

    Retain alterations including elevations to previously approved detached domestic double garage (planning reg no 15/492), extension as fuel store and associated works5 conditions indexed
    Decision11 February 2021View record
  41. © OpenStreetMap
    20/6579Granted

    The Former St. Joseph's Convent of Mercy Town Plots (townland) The Ramparts Kinsale, Co. Cork

    Modifications to 3 no. apartments permitted under Cork County Council Ref. No.’s 14/6792 and 17/7332. The proposed modifications consist of: i) the internal modifications to the convent building to amalgamate Apartment no.’s 24 and 26; ii) modifications to the layout of Apartment 23; and iii) all associated modifications to the facade and ancillary site developments works.Decision record indexed
    Decision22 January 2021View record
  42. © OpenStreetMap
    SD20A/0121Granted

    Townlands within Grange Castle South Business Park, Baldonnel, Dublin 22

    Permission for a period of ten years for development at this site of 16.5 hectares that is located within lands in the Grange Castle South Business Park and includes the residential property of Ballybane, Old Nangor Road on land within the townlands of Milltown; Ballybane and; Aungierstown and Ballybane; and bounding Baldonnel Road to the west; both the Old and New Nangor Road to the north; and Grange Castle South Access Road to the South, Baldonnel, Dublin 22. The development will consist of the following: (1) The demolition of the existing two storey dwelling of Ballybane and associated farm buildings (565sq.m) and the construction of 3 two storey data centres with mezzanine floors at each level of each facility and associated ancillary development that will have a gross floor area of 80,269sq.m on an overall site of 16.5hectares. (2) 1 two storey data centre (Building A) that will be located to the south-west of the site and will have a gross floor area of 28,573sq.m. and will include 26 emergency generators located at ground floor level within a compound to the northern side of the data centre with associated flues that will be 25m in height. The facility will also include 26 ventilation shafts which will be located above the northern end of each emergency generator that will measure 20m in height. (3) 1 two storey data centre (Building B) which will be located to the north-west of the site, and to the immediate north of Building A and will have a gross floor area of 21,725sq.m and which will include 18 emergency generators located at ground floor level within a compound to the northern side of the data centre with associated flues that will be 25m in height. The facility will also include 18 ventilation shafts which will be located above the southern end of each emergency generator that will measure 20m in height. (4) 1 two storey data centre (Building C) which will be constructed last, will be located to the eastern part of the site on a north-south axis and will have a gross floor area of 28,573sq.m. It will include 26 emergency generators located at ground floor level within a compound to the western side of the data centre with associated flues that will be 25m in height. The facility will also include 26 ventilation shafts that will be located above the western end of each emergency generator that will measure 20m in height. (5) Each of the three data centres will include data storage rooms, associated electrical and mechanical plant rooms, loading bays, maintenance and storage spaces, office administration areas, and plant including PV panels at roof level as well as a separate house generator for each facility which will provide emergency power to the admin and ancillary spaces. Each data centre will also include a diesel tank and a refuelling area to serve the proposed emergency generators. (6) The overall height of each data centre apart from the flues and plant at roof level is c. 19.85m above the finished floor level. (7) 1 temporary and single storey substation (29sq.m). (8) 3 single storey MV buildings (each 249sq.m - 747sq.m in total) which manage the supply of electricity from the substations to each data centre and are located to the immediate west of the generator compound within buildings A and B, and to the south of the generator compound withing building C. (9) 8 prefabricated containerised electrical rooms (65sq.m each and 520sq.m overall) that are stacked in pairs to the immediate south of the temporary substation. (10) Ancillary site development works, which will include attenuation ponds and the installation and connection to the underground foul and storm water drainage network and installation of utility ducts and cables which will include the drilling and laying of ducts and cables under Baldonnel stream. Other ancillary site development works will include hard and soft landscaping, lighting, fencing, signage, service road, entrance gate, sprinkler tank house (72sq.m), security hut (30sq.m) and 150 car parking spaces and 78 sheltered bicycle parking spaces. The development will be enclosed with landscaping to all frontages including a wetland to the west. The development will be accessed from the Grange Castle South Access Road from the south via the Baldonnel Road. An Environmental Impact Assessment Report (EIAR) has been submitted with this application.Decision record indexed
    Decision29 July 2020View record
  43. © OpenStreetMap
    D20A/0028Granted

    On a site of C. 0.72 University College Dublin Campus, Belfield, Dublin 4 (the overall campus includes Protected Structures)

    Permission for development. The proposed development relates to the provision of an academic building (the Centre for Creativity - c. 13,184sqm Gross Floor Area including basement) and all associated elements as part of the Future Campus Phase 1 proposals. The general height of the proposed building ranges from c.18.6 m up to overall height of c.48.88m (up to the highest of the proposed tower elements). The Centre for Creativity includes the provision of a study centre, a lecture theatre, workshop/studio/classroom facilities, ancillary exhibition spaces and all associated ancillary areas/facilities. The proposed development will consist of: Level 0 - Educational facilities including - forum (foyer/reception), study centre, UCD experience area, equipment room and demonstration spaces, workshops, studios/maker space areas, retail area, café and all associated ancillary areas/facilities. Level 1 - (including mezzanine areas) - Educational facilities including study centre, UCD experience areas, creative teaching spaces, offices and all ancillary support facilities. At mezzanine level - Educational facilities including study centre, workspaces, offices and all associated ancillary areas/facilities. Level 2 - Educational facilities including a lecture theatre, UCD experience area, studios/classrooms/study areas and all associated ancillary areas/facilities. Level 3 - Educational facilities including studio/classroom/study areas, UCD experience areas and all associated ancillary areas/facilities. Level 4 - Educational facilities including UCD experience area, creative teaching spaces, studios and all associated ancillary areas, facilities. Level 5,6 and 7 - Educational facilities including UCD Experience areas and all associated ancillary areas/facilities (including an observation areas at Level 7). At basement Level - Associated ancillary plant facilities, storage and ancillary areas/facilities, storage and ancillary areas/facilities. At roof level over part of level 2 and level 4- provision of a sedum roof (with a combined area c. 1184 sqm) and Photo Voltaic panels (with a combined area c. 230 sqm) and paved terrace (c. 270 sqm), associated plant, roof lights and roof access. The proposals also provides for associated landscaping including a stepped reflective pool (located at part of the south-west, north-west and north east elevations of the proposed Centre for Creativity) fronting the new campus Arrival Plaza (part of a separate planning application). an external south-facing courtyard forming part of the new Ardmore Quad (part of a separate planning application), an external service area, an external workshop terrace area at ground floor level, external storage facilities (c.91 sqm) and all site services and associated site development works. There are no works proposed to the existing Protected Structures within the University College Dublin Campus as part of this planning application.26 conditions indexed
    Decision17 June 2020View record
  44. © OpenStreetMap
    19804Granted

    Marlmount, Marlbog Road, Haggardstown Dundalk

    Permission for development at lands located within the Marlmount Housing Development, Marlbog Road, all in the townland of Haggardstown. The development will consist of the following: 1) Construction of 16 no. 2 storey 3 bedroom houses (Type P) at the following addresses: No.'s 6,7,8,10,29,30,34,35,42,43,48,49,56,57,62 and 63 Marlmount Park; 2) Construction of 2 no. 2 storey 4 bedroom houses (Type Q) at the following addresses: No.'s 9 and 11 Marlmount Park; 3) Construction of 20 no. 2 storey 3 bedroom houses (Type R) at the following addresses: No.'s 12,13,14,15,16,17,18,19,20,21,32,33,44,45,46,47,58,59,60 and 61 Marlmount Park; and 4) Construction of 24 no. 2 storey 3 bedroom houses (Type S) at the following addresses: No.'s 22,23,24,25,26,27,28,31,36,37,38,39,40,41,50,51,52,53,54,55,64,65,66 and 67 Marlmount Park.Decision record indexed
    Decision07 May 2020View record
Showing 1-44 of 44
PreviousPage 1 of 1Next