to
to

Planning records

Showing 1-15 of 15 public records
PreviousPage 1 of 1Next
  1. © OpenStreetMap
    SDZ24A/0029WGranted

    Development Area 9 Kishoge South East, Sub Sectors KSE-S1 and KSE-S2, Clonburris SDZ, within the townland of Kishoge, Clonburris, Dublin 22.

    Cairn Homes Properties Limited intend to apply for a 7 year planning permission for development at a site of c.15.6 hectares (on two land parcels) known as 'Development Area 9' Kishoge South East, Sub Sectors KSE-S1 and KSE-S2, Clonburris SDZ, within the townland of Kishoge, Clonburris, Dublin 22. The site is principally bounded by the Dublin-Cork railway line to the north, the Grand Canal to the south, the Grange Castle Road (R136) to the south-west and undeveloped lands to the north-west and east. The development will consist of the construction of a mixed-use development, which includes 660 no. residential units comprising: • 264 no. semi-detached and terraced houses (7 No. 2 bed 4 person houses, 238 No. 3 bed houses and 19 No. 4 bed houses), ranging in height from 2 to 3 storeys. • 68 No. duplex apartment units (34 no. 2 bed 4 person units and 34 no. 3 bed units), arranged across 6 No. duplex blocks, ranging in height from 2 to 3 storeys; • 328 no. apartments (165 no. 1 bed units, 30 no. 2 bed 3 person units, 133 no. 2 bed 4 person units), arranged across 7 No. apartment blocks (Blocks 1, 2, 3, 4, 5a, 5b and 5c), ranging in height from 4 to 6 storeys; and • A creche (c. 615 sq m) at ground floor level within Block 4. The development will also include a Local Node at 'Clonburris Little' which includes the provision of a double-height Park Hub building (c. 8m in height) comprising c. 1,558 sq m of community floorspace, including a sports hall/place of assembly, multi-purpose spaces, changing rooms, a café, storage areas, staff and visitor amenity areas and other ancillary spaces. Vehicular access to the site will be from the Clonburris Southern Link Street (as permitted by Reg. Ref. SDZ20A/0021) located centrally between Sub-Sectors KSE-S1 and KSE-S2. The development will also consist of the provision of c.11,049 sq m of public open spaces and associated landscaping (including a section of Grand Canal Park, a local park and pockets parks); communal open spaces; private open space (rear gardens, terraces and balconies); hard and soft landscaping (including internal roads, pedestrian and cyclist routes, pathways, hedgerows, boundary treatments and street furniture); play spaces with natural play elements; surface car parking (653 no. surface spaces in total, including accessible spaces); electric vehicle charging points; bicycle parking (long and short stay spaces including stands) and electric bicycle charging points; motorcycle parking; pedestrian and cyclist connections; routes ESB substations, piped infrastructural services and connections; ducting; plant; waste management provision; SuDS measures (including brown roofs/biodiverse roofs, ponds and wetland areas); solar panels; advertising signage; pedestrian crossings, public lighting; changes in levels and all site development and excavation works above and below ground.Decision record indexed
    Decision05 August 2025View record
  2. © OpenStreetMap
    24166Granted

    Grange Cross, Carlingford, Co Louth

    Retention permission for the construction of a dwelling house originally granted under planning reference 89/611 in revised location *Significant Further Information Received on 24/02/2025 - New Wastewater Treatment System*Decision record indexed
    Decision14 March 2025View record
  3. © OpenStreetMap
    SD24A/0224WGranted

    Site within the townland of Gollierstown, (West of Grange Castle Business Park), Newcastle, Co. Dublin.

    The proposals will comprise of amendments to Units 2, 3 and 4, permitted under Reg. Ref.: SD23A/0301. The proposed development will consist of: Unit 2 Reconfiguration of permitted substation; Reconfiguration of car parking layout; Unit 3 Reconfiguration of the layout of the unit resulting in a reduction of floor area from 6,325 sq.m GFA (including 579 sq.m of associated office space) to 4,386 sq.m GFA(including 831 sq.m of associated office space); Reconfiguration of the car park area to provide an increase in the total number of car parking spaces from 50 no. spaces to 68 no. spaces including 14 EV charging spaces. Reconfiguration of the service yard area including: Increasing the service yard area to the east of the Unit 3 building. Relocation of the service yard entrance from east side of plot to south side of plot; Provision of 132 no. delivery van spaces with EV charging for all van spaces. Relocation of external facilities including bin store, water tank, condensers and PV battery area. Relocation of the bicycle parking area and a reduction from 32 no. spaces to 22 no. spaces; The unit will be served by 2 no. dock level loading bays and 1 no. level access loading bay; Amendments to the elevations to accommodate the changes to the layout of the unit and the provision of signage on the elevations; Omission of internal roundabout and revisions to the internal road layout; Provision of a new pedestrian crossing; Relocation of permitted substation; Amendments to the permitted attenuation ponds; Omission of the permitted fire tender access along the western boundary of the plot and; Increase in unit's finished floor level from 67.800m to 68.200m Unit 4 Relocation of permitted substation; Reconfiguration of carpark and bike parking layout (no change to permitted number of parking spaces). All associated infrastructure, road markings, totem signs, signage, Corten wayfinding, boundary treatments, landscaping and site development works.Decision record indexed
    Decision27 January 2025View record
  4. © OpenStreetMap
    2460557Granted

    St. Martin’s Special School, St. John’s Villas, Lower Grange Co Waterford X91 WPC0

    For the construction of a single-storey extension to our existing school building comprising of 4 no. additional classrooms with associated teaching spaces, toilet and shower / changing areas, multi-activity room and office, plant room and services compound, and the installation of solar photovoltaic panels to new roof area, in addition to adjustment / relocation of existing external hard and soft play areas and existing ball-court, the formation of new soft-play areas, new sensory garden, new hard and soft landscaping, 16 no. new carparking spaces (including provision for electric vehicle charging locations and 1 no. new disabled carparking space), new on-site road crossing on internal road network and extension to existing on-site drop-off area / lay-by and extension to associated drop-off canopy, complete with all necessary alterations to accommodate the works including the formation of a temporary contractor entrance to the south-western corner of the site and reinstatement of existing wall and fence upon completion of the works, and all associated site works and ancillary accommodationDecision record indexed
    Decision14 January 2025View record
  5. © OpenStreetMap
    23386Granted

    Coole Cross, Friarstown, Grange

    (a) an extension as constructed to the dwelling house, (b) the existing garage as constructed on the site, (c) the existing dog grooming and doggy daycare building as constructed on the site and all associated worksDecision record indexed
    Decision19 March 2024View record
  6. © OpenStreetMap
    211502Granted

    Knockroe Kilnagranagh Newtowndrangan Tullowcussaun Ballyvadlea Ballyhomuck Kilburry West Milestown Bannixtown Quartercross Clare More Killusty North Killusty South Kiltinan Loughcapple Grange Beg Miltown Britton Mullenranky Kilmore, Ballinvoher Redm

    A ten-year permission of a wind farm project. The development will consist of: Construction of up to 7 no. wind turbines with a maximum overall tip height of 150m, comprising a tower of between 75-95m high, to which three blades of between 55-70m in length will be attached; Associated hard stand areas at each turbine; 1 no. 30m permanent meteorological mast and all associated infrastructure and works; 1 no. 38kV electrical substation and all associated infrastructure and works; 20kV underground cables facilitating the connection of turbines to 38kV electrical substation and all associated infrastructure and works; Circa 19km of 38kV underground cabling and all associated works along public roads to facilitate the connection of the proposed 38kV wind farm electrical substation to the existing 38/110kV Doon substation in the townland of Ballyvaughan; Provision of a new site entrance on the L2035; Upgrading of existing agricultural tracks and construction of new site tracks and all associated works as required; A temporary site compound and all associated works; Demolition of 2 no. derelict buildings; Provision of 2 no. cattle underpasses circa 400m and circa 580m to the east of the new site entrance; and all associated infrastructure and site development works. The proposed underground cabling works located within the public road corridor cross Protected Structure RPS S121 (Loughcapple Bridge). An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) have been prepared in respect of the proposed development and will be submitted with the applicationDecision record indexed
    Decision27 October 2022View record
  7. © OpenStreetMap
    SD22A/0303Granted

    Grange Castle Business Park, Grange Castle, Dublin 22

    Construction of a Volatile Organic Compound (VOC) Abatement system comprising of a thermal oxidiser (TO), associated plant equipment and scrubbers positioned on a bunded concrete plinth with a maximum single stack height of 12m along with two access platforms at 2.5 high and 5.0m high used for maintenance only; The system is set within a 489sq.m (including a bunded area of 213sq.m) concrete compound enclosed by a 2.4m high paladin weldmesh black fence to match the existing utilities perimeter fence; 135sq.m single storey utilities workshop will sit adjacent to the Volatile Organic Compound (VOC) abatement system compound with associated hardstanding area and soakpit; 55m (L) x 3.2m (W) x 5.6m (H) pipe rack extension with the addition of a second tier extension 118.6m (L) X 3.2M (W) 1.2m (H) to the existing pipe rack is required to service the new VOC abatement system compound; a contractor's compound 3,420sq.m comprising single stacked portacabins, workshops, parking for 30 contractors, materials delivery and set down area; the compound will be enclosed by a 2.4m tall paladin weldmesh black fence; modifications to the existing internal access road will include the addition of a new access road and footpath around the VOC abatement system compound and utilities workshop; a permanent pedestrian crossing including associated signage at the existing access road giving access between the contractor's compound and the voe abatement system compound; modifications to the existing site lighting, signage, surface water, foul and process wastewater drainage, hard and soft landscaping including a 3m high planted berm to the north of the contractor's compound; An EIAR (Environmental Impact Assessment Report) will be submitted with the application; this application relates to development which comprises an activity requiring an Industrial Emissions Licence in accordance with the First Schedule of the EPA Act 1922 as amended.Decision record indexed
    Decision07 September 2022View record
  8. © OpenStreetMap
    ABP31305922Refused

    6.77ha at Kilmashogue House (Eircode D16 C2P2) and Coill Avon House, Whitechurch Road, Rathfarnham, Dublin 16

    Permission for a strategic housing development consisting of: Demolition of
    Procedure InvalidDensityTraffic Sightlines
    Decision30 June 2022View record
  9. © OpenStreetMap
    ABP31244722Granted

    Lands at The Grange, Brewery Road/Stillorgan Road, Stillorgan, Blackrock, Co. Dublin

    Permission for a Strategic Housing Development proposed for development in this24 conditions indexed
    Decision02 June 2022View record
  10. © OpenStreetMap
    21/5046Granted

    Grange Cross Ovens Co. Cork

    The construction of a new two storey dwelling house, domestic garage, sewerage treatment system and all associated works, a change of design to that previously permitted under planning reference 18/07071.Decision record indexed
    Decision05 November 2021View record
  11. © OpenStreetMap
    SDZ20A/0021Granted

    In the townlands of Adamstown, Grange, Kishoge, Clonburris Litte & Cappagh, Co. Dublin

    10 year permission for roads and drainage infrastructure works as approved under the Clonburris Strategic Development Zone Planning Scheme (2019) to form part of the public roads and drainage networks providing access and services for the future development of the southern half of the overall Strategic Development Zone (SDZ) lands; the roads infrastructure works are for the construction of c. 4.0km of a new road, known as Clonburris Southern Link Street, generally consisting of 7m wide single carriageway, plus on either side of the carriageway landscaped verges, 1.75m wide off-road cycle tracks and 2m wide footpath including public lighting, trees, 288 on-street car parking spaces (including 26 disabled parking spaces), pedestrian crossings, bus stops, a number of vehicular access spurs to facilitate future development of adjoining lands, a total of 8 new junctions (including 3 junctions to facilitate future road developments within the SDZ; 2 junctions with proposed local access roads and 3 new junctions with Hayden's Lane, Lynch's Lane and Ninth Lock Road) and alterations to 4 existing junctions on Newcastle Road (R120), Grange Castle Road (R136), Fonthill Road (R113) and also to the existing access road to Park and Ride facilities at both Kishoge Station and at Fonthill Station; alterations to the existing public roads Newcastle Road (R120), Hayden's Lane Access Road, Hayden's Lane, Lynch's Lane, Grange Castle Road (R136), Fonthill Road (R113) and Ninth Lock Road arising from new junctions with the Clonburris Southern Link Street consisting of reconfiguration of a c.165m long section of Newcastle Road (R120) including road widening and revisions to layout of junction with Hayden's Lane Access Road; incorporation of Hayden's Lane Access Road into proposed Clonburris Southern Link Street; provision of new junction with Hayden's Lane and Clonburris Southern Link Street; incorporation of a c. 26m long section of Lynch's Lane into proposed Southern Link Street and provision of a new junction with Clonburris Southern Link Street; reconfiguration of a c. 260m long section of Grange Castle Road, including road widening and replacement of existing roundabout with signalised junction; reconfiguration of a c. 250m long section of Fonthill Road, including road widening and replacement of existing roundabout with signalised junction; reconfiguration of a c.125m long section on Ninth Lock Road including road widening and provision of a new junction with Clonburris Southern Link Street; construction of 2 local access roads, consisting of c. 110m long road extending north from Clonburris Southern Link Street and providing access to proposed foul pumping station and generally consisting of a 6m wide single carriageway plus on either side of the carriageway 2m wide footpath including public lighting, 2 set-down parking spaces and vehicular access to proposed foul water pumping station; north/south Link Street (c. 240m in length) extending north from southern Link Street to the Kildare-Cork railway line and generally consisting of a 7m wide single carriageway plus on either side of the carriageway 1.3m wide landscaped verge, 1.75m wide off-road cycle lane, 2m wide footpath including public lighting and 2 vehicular access spurs to facilitate future development of adjoining lands; the drainage infrastructure works include 8 attenuation systems (with outfalls to Griffeen River, Kilmahuddrick Stream and existing storm sewers) including 4 ponds, 2 modular underground storage systems and 2 detention basins combined with modular underground storage systems all adjacent to proposed Clonburris Southern Link Street; surface water drainage culverts to existing watercourses; flood water compensation area adjacent to Griffeen River; surface water drainage and water supply trunk infrastructure within proposed road corridors; wastewater infrastructure including a foul pumping station and pipe network within proposed road corridors to facilitate drainage connections to future wastewater drainage infrastructure within the adjoining SDZ lands (including future Irish Water pumping station) and to connect to the existing sewer network in Cappaghmore housing estate; ducting for public electrical services and utilities and the diversion of existing utilities is provided for within the proposed road corridor; Permission is also sought for all ancillary site and development and landscape works associated with the development including hard and soft landscaping, boundary treatments, road markings and signage, enabling works and temporary construction works (including site accommodation, site compounds and temporary boundary fencing); the application is made in accordance with Clonburris Strategic Development Zone Planning Scheme 2019 and relates to a proposed development within the Clonburris Strategic Development Zone Planning Scheme Area as defined by Statutory Instrument No. 604 of 2015; an Environmental Impact Assessment Report accompanies the application.Decision record indexed
    Decision12 August 2021View record
  12. © OpenStreetMap
    2044/20Granted

    Grange Cross, Ballyfermot, Dublin 10

    The development consists of changing the use of the existing bar of 300m2 on ground floor to restaurant at Grange Cross, Ballyfermot, Dublin 10.Decision record indexed
    Decision31 August 2020View record
  13. © OpenStreetMap
    D19A/0797Granted

    Lands at Loughlinstown Drive (0.5685ha), Loughlinstown, Co. Dublin comprising Loughlinstown Industrial Estate and part of HSE Health Centre

    Permission for development. The development will consist of18 conditions indexed
    Decision28 July 2020View record
  14. © OpenStreetMap
    F20A/0026Granted

    Lands at Taylor Hill, off the Naul Road, Balbriggan, Co Dublin

    Located North of Colaiste Ghlor na Mara and overlapping with Phase 2A8 conditions indexed
    Decision07 July 2020View record
  15. © OpenStreetMap
    SH305703Refused

    Colp West, Drogheda, County Meath

    DIRECT APPLICATION TO AN BORD PLEANALA - SUBMISSION TO AN BORD PLEANALA. 357 no. residential units, a childcare facility and associated outdoor play area, road infrastructure, a pedestrian bridge over the railway line and associated pathways, all associated open space, cycle and pedestrian infrastructure, services and all other associated development on a site of c. 13.44 hectares. The 357 no. residential units proposed consist of 169 no. houses, 52 no. duplex apartments and 136 no. apartments. The 169 no. houses will consist of the following: • • 104 no. 3 bedroom units • 65 no. 4 bedroom units The 136 no. apartment units will consist of the following: • 58 no. 1 bedroom units • 78no. 2 bedroom units The 52 no. duplex units will consist of the following: • 52 no. 3 bedroom units The proposed childcare facility is a two storey building with a GFA of 439 sq.m. The proposed houses are 2 to 3 storeys in height and the duplex/apartment blocks are 3 to 6 storeys in height. The development includes road infrastructure comprising of a link street approximately 652m in length (including changes to the previously permitted road infrastructure under Reg. Ref.: LB/180620), including bus stops, 1 no. roundabout, pedestrian crossings and c. 246m long road to the east to facilitate a connection to the existing school on Mill Road (Gaelscoil an Bhradáin Feasa). The road infrastructure also includes the realignment of a section of Colpe Road and the realignment of the southern section of Mill Road, and includes proposed cycle lanes/paths, footpaths, grass verge, and the provision of a footpath and cyclepath / cycle lane on Colpe Road to tie-in with the existing shared footpath / cyclepath, to the south-west of the railway line. The proposed new pedestrian bridge will cross the existing Dublin to Belfast railway line and will link the proposed SHD development to the existing Grange Rath housing development to the south-west. The development includes associated site and infrastructural 592 no. car parking spaces, 532 no. cycle parking spaces, public open space including a linear park, bin and bike stores, landscaping, public lighting, temporary marketing suite and signage (during construction phases), and all associated site and infrastructural works. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared in respect of the proposed development and accompany this application.Grounds not yet categorised
    Decision11 February 2020View record
Showing 1-15 of 15
PreviousPage 1 of 1Next