    24/5080Granted

    Gilead Sciences Ireland UC IDA Business & Technology Park Killacloyne Carrigtwohill Co Cork

    Permission for the construction of a boundary fence in the townland of Kilcloyne, adjacent to the existing Gilead Sciences Ireland facility. The fence is to be a 2.4m high galvanized wire mesh fence type, matching and connecting into the existing Gilead boundary fence.Decision record indexed
    Decision01 August 2024View record
  2. © OpenStreetMap
    24/4592Granted

    Unit A1, Retail Building A Cobh Cross Industrial Estate Killacloyne, Cobh Cross Carrigtwohill, Co. Cork

    Permission for: • The construction of 4 no. outdoor padel tennis courts located to the rear of unit A1 with each court individually floodlit and enclosed with a combination of perimeter clear tempered glass and fencing ranging in height between three and four metres in height: • The construction of a 2 metre high concrete block boundary wall around the 4 no. outdoor padel tennis courts with associated hard and soft landscaping treatments and access gate: and • Services (Incl. connection to existing below ground services) and all other ancillary infrastructure and associated site development works above and below ground level. Primary vehicular and pedestrian access will be maintained via the existing Cobh Cross Industrial Estate (also known as Fota Junction Retail Park) access from the L-3004 Local Road (Killacloyne Road) to the north of the site. Secondary vehicular and pedestrian permeability will be maintained from existing routes within the overall Cobh Cross Industrial Estate (also known as Fota Junction Retail Park) development, access from the L-7626 Local Road (Killahora Road) to the east.Decision record indexed
    Decision31 July 2024View record
  3. © OpenStreetMap
    24/4214Granted

    Killacloyne Carrigtohill Co. Cork

    Permission to convert the existing two-storey outhouse building to a dwelling, elevational changes, construct a new single storey link & side extension, install 3no. rooflights to existing rear roof, demolish the existing side attached domestic storage shed, install a new waste water treatment unit & percolation area, construct a new vehicular entrance & all associated site works to their property.Decision record indexed
    Decision08 April 2024View record
  4. © OpenStreetMap
    23/6150Granted

    Upper Killacloyne Carrigtohill Co. Cork T45XN66

    Permission to (1) Renovate existing dwelling house, (2) Demolish existing domestic garage attached to east side of her dwelling, single storey rear extension, single storey front porch, demolish existing single storey extension attached to west side of her dwelling, (3) Construct a new two storey side extension, new single storey rear extension, new single storey front porch, (4) Install new rooflights to front & rear roofs of her existing dwelling and all associated site works.Decision record indexed
    Decision25 March 2024View record
  5. © OpenStreetMap
    23/5588Granted

    Retail Building A Cobh Cross Industrial Estate (also known as Fota Junction Retail Park) Killacloyne Cobh Cross Carrigtwohill Co Cork

    Change the use of existing Unit A1 (1,373.6 sq.m) from showroom and sales area to indoor recreation facility, at this site of approximately 0.32 hectares. The proposed development will consist of; 1) change of use of Unit A1 (1,373.6 sq.m) from show room and sales area to an indoor recreation facility and construction of 4 no. enclosed padel tennis courts, reception and seating area, merchandise display and sales area, welfare facility units (incl. toilets and shower/change rooms), training area, tiered spectator seating, storeroom; 2) external construction works to Unit A1 include the closing of existing fire escape door on the eastern elevation to match existing elevation, 2 no. building mounted signs (9 sq.m), reconfiguration of internal vehicle circulation and existing surface car parking area to facilitate 31 no. surface car parking spaces (2 no. disabled and 29 no. regular), 8 no. bicycle spaces, and pedestrian footpath linkages (as conditioned under Pl.Reg.No. 22/6600) to a future “Toucan” crossing width zone to accommodate a connection to the Greenway Route along the north of the L-3004 Local Road (Killacloyne Road); and 3) services (incl. connection to existing below ground services) and all other ancillary infrastructure and associated site development works above and below ground level. Primary vehicular and pedestrian access will be maintained via the existing permitted Cobh Cross Industrial Estate (also known as Fota Junction Retail Park) access from the L-3004 Local Road (Killacloyne Road) to the north of the site. Secondary vehicular and pedestrian permeability will be maintained from existing routes within the overall Cobh Cross Industrial Estate (also known as Fota Junction Retail Park) development, accessed from the L-7626 Local Road (Killahora Road) to the east.Decision record indexed
    Decision27 September 2023View record
  6. © OpenStreetMap
    22/6600Granted

    Existing Retail Building A Cobh Cross Industrial Estate, Killacloyne Cobh Cross Carrigtwohill, Co. Cork

    Development comprising the subdivision of the existing Retail Building A (2,755.5 sq m Gross Floor Space) to facilitate 2 no. Retail Units (Unit A1 and Unit A2 respectively) through the construction of an internal subdivision wall and the change of use of new Unit A2 from Showroom and Sales Area/Retail Warehousing/Warehousing to Vehicle Sales and Leasing Outlet with Vehicle Servicing/Maintenance Garage (1,373.6 sq m) with ancillary infrastructure and associated site development works (all totalling 2,815.1 sq m Gross Floor Space), at this site of approximately 0.49 hectares located at the existing Retail Building A, Cobh Cross Industrial Estate (also known as Fota Junction Retail Park) in the Townland of Killacloyne, Cobh Cross, Carrigtwohill, Co. Cork. The proposed development will consist of: The construction of an internal dividing wall within existing Retail Building A to facilitate 2 no. Retail Units (Unit A1 of 1,373.6 sq m and Unit A2 of 1,373.6 sq m respectively). The change of use of Unit A2 from Showroom and Sales Area (228.1 sq m), Retail Warehousing (584.5 sq m) and Warehousing (564 sq m) to Vehicle Sales and Leasing Outlet with Vehicle Servicing/Maintenance Garage (1,373.6 sq m) with sales showroom, public facilities (incl. customer lounge, toilets and meeting rooms), staff facilities (incl. lobbies, staff room, toilets, cloak/change rooms, showers and conference room), service area, office, IT room, plant room and storage. External works to Unit A2 include 2 no. building mounted signs (19.4 sq m), new fire escape door on northern elevation, replacement of existing glazed screen and doors with roller shutter door on southern elevation, 13 no. surface car parking spaces (3 no. disabled, 7 no. EV charging and 3 no. regular), enclosed secured open service yard area with 6 no. EV charging points, vehicle wash-bay (59.6 sq m) and waste storage area. Boundary treatments, secure fencing, services (including connection to existing below ground services) and all other ancillary infrastructure and associated site development works above and below ground level. Primary vehicular and pedestrian access will be maintained via the existing permitted Cobh Cross Industrial Estate (also known as Fota Junction Retail Park) access from the L-3004 Local Road (Killacloyne Road) to the north of the site. Secondary vehicular and pedestrian permeability will be maintained from existing routes within the overall Cobh Cross Industrial Estate (also known as Fota JunctionDecision record indexed
    Decision15 May 2023View record
  7. © OpenStreetMap
    22/4736Granted

    Fotapoint Enterprise Park Killacloyne Td. Carrigtwohill Co.Cork

    Permission to develop a container storage facility with containers varying in sizes from 20 feet to 40 feet in length, container with toilet/ office facilities connected to existing services on site, 3 m high paladin security fencing around perimeter and all associated site worksDecision record indexed
    Decision20 March 2023View record
  8. © OpenStreetMap
    23/4035Granted

    Fota Retail and Business Park Killacloyne Carrigtwohill Co Cork

    Construction of a temporary unsurfaced carpark, temporary lighting, temporary fencing and ancillary works.Decision record indexed
    Decision13 March 2023View record
  9. © OpenStreetMap
    22/5917Granted

    Gilead Sciences Ireland UC IDA Business & Technology Park Anngrove & Killacloyne, Carrigtwohill Co.Cork

    The construction of, at our existing facility in the townlands of Anngrove and Killacloyne, Carrigtwohill, co. Cork, a new warehouse (5,176m2) which incorporates a 3 storey area over the loading bays, a two storey connection corridor to the existing building (970m2), a site security building (110m2), a logistic yard, a contractor compound, an extension to the existing staff carpark and an access road on the western boundary of the existing site. Works will include required alterations to the existing internal layout, all necessary demolitions and modifications as well as all associated site development works, including a new surface water connection to the existing industrial estate infrastructure, internal roads, retaining structures, plant areas, pedestrian foot paths, modifications to the site boundary frnce line and new vehicular access barriersDecision record indexed
    Decision23 February 2023View record
  10. © OpenStreetMap
    22/5635Granted

    Windsor Hill Killacloyne Carrigtwohill Co. Cork

    Permission to construct a dwelling house, install a wastewater treatment system and undertake all associated site works.Decision record indexed
    Decision20 February 2023View record
  11. © OpenStreetMap
    22/4478Granted

    Killacloyne Carrigtwohill Co Cork

    The construction of a new and upgraded entrance to replace existing agricultural entrance. The new entrance is required to access lands zoned industrial.Decision record indexed
    Decision17 February 2023View record
  12. © OpenStreetMap
    21/7424Granted

    Titan Container Storage Facility Fotapoint Enterprise Park Killacloyne, Carrigtwohill Co Cork

    Construction of 13 no. warehouse/light industrial units in 3 no. buildings with ancillary two storey offices internally and associated site works (part of previous permitted development under planning reg no. 06/6741 and extension of permission Reg No. 11/5459)Decision record indexed
    Decision19 December 2022View record
  13. © OpenStreetMap
    22/5395Granted

    Cobh Cross Industrial Estate Killacloyne Carrigtwohill Co. Cork

    (i) demolish the existing vacant warehouse, vacant shed and associated boundary walls on the eastern side of the existing chilled storage building (ii) relocate the existing fire escape door from the eastern corner of the existing chilled storage building to the northern side of the existing chilled storage building (iii) the construction of a proposed extension to the existing chilled storage building with a goods intake area with 2 no. dock levellers on the eastern side of the proposed extension and external plant on the northern side (rear) of the proposed extension and all associated site works.Decision record indexed
    Decision21 November 2022View record
  14. © OpenStreetMap
    22/5378Granted

    Fota Retail and Business Park, Killacloyne Carrigtwohill Co. Cork

    Permission for the construction of an access road, a temporary unsurfaced carpark, temporary security hut, temporary bus shelter building, temporary portaloo toilets, temporary lighting, temporary fencing and ancillary works.Decision record indexed
    Decision24 October 2022View record
  15. © OpenStreetMap
    22/4603Granted

    Unit 19, Fota Retail & Business Park Killacloyne Carrigtwohill Co.Cork

    Permission for change of use from a single storey children's leisure unit (previously granted under Planning Ref. No. 06/6221) to a commercial enterprise unit incorporating golf training, customizing, alterations and modifications together with repair and supply facilityDecision record indexed
    Decision10 May 2022View record
  16. © OpenStreetMap
    22/4561Granted

    Windsor Hill Killacloyne Glounthane Co.Cork

    Permission to construct a revised single storey dwelling house and domestic garage (change of plan to that permitted under 13/6424 and extended under 18/6365), updated northern site boundary, updated landscape proposal, new bored well and all associated ancillary site worksDecision record indexed
    Decision06 May 2022View record
  17. © OpenStreetMap
    21/5364Granted

    Unit 2A, Carrigtwohill Community College Fota Retail & Business Park Killacloyne Carrigtwohill, Co. Cork

    Continuation of use for a further three years for Office Unit (2A) as Secondary school (Previously granted under planning reg. no. 16/4328 & 19/4738) for a further 3 years including all associated site works and facilities including external fenced storage enclosure, high fenced play area, 2 no. free standing school signs, 3 no. school warning signs and all associated drainage and site works to be located on the groundsDecision record indexed
    Decision30 November 2021View record
  18. © OpenStreetMap
    21/5365Granted

    Unit 2A, Carrigtwohill Community College Fota Retail & Business Park Killacloyne Carrigtwohill, Co. Cork

    Continuation of use for a further three years for 2 no. blocks of temporary single storey pre-fabricated buildings, (previously granted under planning reg.no. 19/4400) located to the north east of the existing Carrigtwohill Community College (existing unit 2a), block no. 1 containing 2 no. general classrooms, science room & preparation room, block no. 2 containing 3 no. general classrooms and toilet accommodation, and all ancillary site works to be located on the grounds.Decision record indexed
    Decision29 November 2021View record
  19. © OpenStreetMap
    21/5431Granted

    Upper Killacloyne Carrigtwohill Co. Cork

    To construct a detached dwelling and domestic garage, upgrades to existing entrance and lane, installation of a septic tank system and percolation area and all associated site works.Decision record indexed
    Decision16 July 2021View record
  20. © OpenStreetMap
    20/6074Granted

    The IDA Business and Technology Park Killacloyne Carrigtohill Co. Cork

    Construction of ESB substation. The ESB substation including an adjacent switchroom will be 3.375m high, 7,650m long and 4.360m wide (change of location from that previously permitted under Pl.Reg.20/4090)Decision record indexed
    Decision16 November 2020View record
  21. © OpenStreetMap
    20/4810Granted

    Carrigtwohill Community College Fota Retail & Business Park Killacloyne Carrigtwohill, Co. Cork

    The provision of an additional temporary post-primary school accommodation by way of construction of 8 no. prefabricated buildings (c 364 Sq.Mtrs, 318.5 Sq.Mtrs, 318.5 Sq.Mtrs, 80.1 Sq.Mtrs, 127 Sq.Mtrs, 100 Sq.Mtrs, 30 Sq. Mtrs, and 30 Sq. Mtrs ) on a defined site area (c 0.831 Ha) with associated site works, including provision of hard surface play area, entrance, set down area, car parking, boundary treatments, bicycle parking etc. Temporary permission for a period no longer than 5 years is being sought.Decision record indexed
    Decision03 July 2020View record
  22. © OpenStreetMap
    20/4090Granted

    The IDA Business and Technology Park Killacloyne Carrigtohill Co. Cork

    The development will consist of (1) a single storey laboratory building to include plant and equipment area, office area, meeting rooms, canteen and kitchen, staff toilets, laboratories, IT room, electrical switch rooms and store rooms. The main laboratory building is 6.1 metres high, 44.5 metres long and 21.5 metres wide with vertical brise soleil screen offset from the southern facade. (2) An ESB substation of 3.18 metres high, 4.83 metres long and 4.32 metres wide is proposed to the rear of the building adjacent to the proposed service yard to the north of the main laboratory building. (3) The proposed development also includes 19 No. new car parking spaces comprising 2 No. visitor parking bays, 5 No. car pool parking bays. 1 No. wheelchair accessible parking bay, 2 No. dedicated electric vehicle charging bays, 2 No. motorcycle parking spaces and a covered bicycle shelter. (4) The proposed site works will include a 2.2 metre high, full perimeter security fence with new vehicular entrance gate and pedestrian turnstile entrance to the south east corner of the site, new entrance/exit to the proposed site, internal access roads pedestrian pathways, underground and overhead utilities, landscaping and all other associated site works.Decision record indexed