Planning records
Showing 1-50 of 32,933 public recordsRetention planning permission and planning permission is sought by St. Margaret’s Recycling & Transfer Centre Ltd. at St. Margaret’s Metal Recycling, Sandyhill, St. Margaret’s, Co. Dublin. Retention planning permission is sought for the permanent continuation of use of the existing waste processing and transfer facility for the bulking, transfer and recycling of metals, construction & demolition waste, bulky/skip waste, batteries, wood waste, glass, other non-biodegradable non-hazardous wastes, and an Authorised Treatment Facility for end of life vehicles, accepting up to 24,900 tonnes of waste per annum. Retention permission is also sought for the continued use of the existing buildings on site associated with the daily operations of the facility including processing shed, offices, plant room, shelter buildings etc., existing site services, boundary treatments and all ancillary site development works necessary to facilitate the development erected under and in accordance with Reg. Ref’s. F13A/0409, F11A/0443, F10A/0177, F03A/1561, F03A/1682 and F97A/0109. Planning permission is sought for new proposed stormwater attenuation storage tanks and associated stormwater treatment infrastructure to serve the existing development with permission also sought to restore part of the lands to agricultural use. The above development will require a review of the existing waste facility permit for the site and as such, a separate application will be made to the environmental section of Fingal County Council upon receipt of planning permission. Add Info received 1st October 2020. Add Info deemed Significant 7th October 2020. Revised Public Notices received 13th October 2020. Clarification of Additional Information received 16.03.21
Planning permission for development at lands at
Retention permission for as constructed agricultural dairy milk pasturising shed, & Permission to complete the development works to include, new effluent treatment system, alter existing entrances and private access road, associated car parking, signage, and all associated site works for the purposes of an Agricultural Dairy Farm Shop. AI received 20/5/2022
The Proposed development will consist of a Petrol Filling Station to include: (i) A forecourt area with 4 no. fuel pump islands, illuminated forecourt canopy over, 4 no. 40,0000 litre underground fuel storage tanks, associated pipework and overground fill points and vents, HCV pump and electric car charging points and associated infrastructure, (ii) A car wash area with 2 no. car wash bays, associated underground water storage tanks, drainage and plant room, (iii) On-site facilities including, car service areas, car and bicycle parking, dedicated delivery lane, loading area, pedestrian routes and associated line markings, (iv) Works to R122 including relocation of existing site access, formation of new access from R122, road widening and road markings, (v) Illuminated and non-illuminated Operator signage including main ID Totem sign, canopy and facade signage, (vi) An amenity Building of 332.3 sq.m gross floor area which will include a convenience shop (100 sq.m net retail area), restaurant/cafe area with food offerings with hot and cold meals and refreshments for sale for consumption on and off premises, coffee barista and associated drive thru facility, customer seating, customer WCs, Back of House area with food preparation areas, (vii) ESB Substation, (vii) 6 no. EV Chargers with associated parking bays, (ix) All site drainage works including rainwater harvesting, attenuation and integrated constructed wetland providing foul treatment system, and (x) All associated site lighting, landscaping, boundary treatments and site development works. AI rcvd 25/04/2024
The proposed development will consist of a Petrol Fililng Station to include (i)A forecourt area with 4no. fuel pump islands, illuminated forecourt canopy over, 4 no. 40.000 litre underground fuel stroage tanks, associated pipework and overground fill points and overground fill points & vents, hcv pump and electric car charging points and associated infrastructure, (ii) A car wash area with 2 no.car wash boys associated underground water storage tanks, drainage and plant room, (iii) On- site facilities including,car services areas, car and bicycle parking, dedicated delievery lane, loading area pedestrian routes and associated line markings. (iv) Works to R122 including relocation of existing site access, formation of new access from R122, road widening and road markings. (v) Illuminated & non- illuminated operator signage including main ID Totem sign, canopy and facade signage, (vi) An amenity building of 626 sqm gross floor area which will include a convenience shop (100 sq.m net retail area) restaurant/café area with 2 no food offerings with hot and cold meals and refreshments for sale for consumption on and off the premises, associated drive thru facility, customer seating customer Wc's back of house area with food preparation areas, ancillary office, staff welfare facilities, storage and plant areas, ancillary off licence, (vii) Esb substation, (viii) Overground LPG tanks (ix) All site drainage works including rainwater harvesting, attenuation and foul treatment system, (x) All associated site lighting, landscaping, boundary treatments and site development works. AI received 17/05/21 AI deemed Significant Revised Public Notices Received 14/06/21
The construction of three new vehicle new vehicle accesses and agricultural gates at each site within daa ownership. Each access will be c.4 metres in width and will include a permeable hardstand area. Each proposed agricultural gate will be between 1.2 and 1.5 metres in height. The proposed development will also include the removal of an existing fence at location 3D and construction of a new timber and post perimeter fence c1.3m in height. The proposed development will also include all ancillary works including site excavation and development works above and below ground.
The proposed development will consist of: 1) the demolition of existing cattle pen and hard standing area (total 911m2) and the removal of 1 no. existing gated site entrance from the South Parallel Road (R108), and the construction of a westwards extension to the existing Holiday Blue Long-Term Car Park to provide an extended surface car park which will comprise 950 no. airport staff car parking spaces, of which 48 no. will be provided for Persons with Reduced Mobility (PRM) and 96 no. will be serviced by Electric Vehicle (EV) charging points, to be accessed off the South Parallel Road (R108) via an upgraded existing former temporary construction access/egress, with an emergency access also to be provided through the existing Holiday Blue Long-Term Car Park immediately east of the proposed development site via a tie in, with security barriers, to the existing internal roundabout; 2) 30 no. bicycle spaces; 3) 1 no. new bus shelter; 4) new internal road layout, with set down areas for buses and footpaths, incorporating 2 no. existing culverts (one of which is to be extended) and 1no. new culvert over the Santry River; 5) proposed riparian corridor either side of the Santry River; 6) 1 no. single-storey substation; 7) 1 no. new single storey welfare building; 8) 1 no. new single-storey security hut with security barriers; 9) new foul and surface water drainage system works incorporating attenuation; 10) the erection of CCTV equipment, security fencing, electrical enclosure, lighting, signage, and boundary fencing; and 11) all other associated site development works, including temporary construction compound, and all hard and soft landscaping. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) have been prepared in respect of the proposed development and will be submitted to the planning authority with the application.
Construction of a two storey dwelling, construction of a new vehicular entrance, installation of a proprietary wastewater treatment system with percolation area and all associated ancillary site works
Planning permission for a new solar photovoltaic solar farm at site bounded by Harristown Lane (L3151), St Margaret’s Road (R122), and South Parallel Road (R108) in the townland of Sanganhill Td, Finglas ED, Co. Dublin. The development will consist of the installation of a ground mounted solar photovoltaic (PV) array with associated development and ancillary works including inverters, modules and transformers; site cabling; 2 no. substation building; a storage container on a concrete base; an internal access road and attendant surface water drainage; the formation of a new site entrance onto South Parallel Road (R108); security boundary fencing and landscaping; and a security controlled entry gate and lighting. AI received 23/6/2022 CAI received 10/10/2022
Permission for the reconfiguration and extension of a coldstore facility in addition to alterations to the facade of a warehouse, new screen fencing and ancillary site works.
The development will consist of internal modifications to ground floor level, construction of a first floor extension consisting of 3 no. bedrooms & 2 no. bathrooms (floor area 75.59m. sq) 1 no. rooflight on front elevation and associated site works. AI Rcvd 09/10/2023
A. New mezzanine floor at first floor level. B. All associated siteworks. Add Info received 18th December 2020.
A new side extension to the existing warehouse and all associated site works
A new side extension to the existing warehouse and all associated site works. Additional Information Lodged on 29th July 2020
New overflow parking facility to accommodate - A. 10 No off street car parking spaces all with electric charging facilities, B. All associated site works on site. AI received 24/01/23
The installation of a photovoltaic solar array to be mounted on the rooftop of an existing industrial building. The proposed development includes the provision of approximately 6245m2 of photovoltaic solar panels, mounting frames, inverters, electrical cabling and all associated ancillary infrastructure.
Intend to apply for permission to erect a new
Planning permission is sought for a new wastewater treatment plant and associated percolation area with soil polishing filter and tertiary treatment and associated works and for the construction of an all weather training area using existing tennis courts and existing tennis courts lighting with a total area of of 1400 sq.m AI Received 07/02/2025
The development consists of an extension at ground floor of 289 sq.m. consisting of a meeting room, club shop, office and storage areas and the provision of a viewing terrace at first floor with a lean to roof of 225 sq.m. and the renovation of the existing building by the removal of vertical metal cladding and the construction of inner leaf and external leaf insulated cavity blockwork with a pebble dash finish to match existing. The removal of the first floor meeting room and conversion to gym area. The provision of new double glazed windows throughout. The provision of new insulated metal roofing and the provision of solar panels on the roof and all associated site works to the Community Complex. Additional Information Received 20/06/2025
The development consists / will consist of the following: 1. Retention permission is sought for. a) Extension to as-built Farm Shop ( Reg. Ref. F15A / 0564) consisting of café area of 34.24 sqm, Works to facilitate this alteration were inclusive of internal amendments, changes to windows, doors and opes of the as-built development: and b) Alterations to car parking layout and access arrangements including the retention of 5 no additional car parking spaces ( in addition to 25 no previously approved under F15A/0564). 2- Planning permission is sought for: a) Change of use from existing store to café seating and flower display area to southern end of existing building. b) A 203.87 sq. meter extension to existing Farm Shop and Café. The extended areas will consist of: i) Farm shop cold room and main store, kitchen and café seating area, lobby, plant rooms and bin store to eastern side of existing building; ii) Meeting room, staff facilities, storage and 1 additional female toilet facility to western side of existing building; iii) New entrance lobby to northern side of existing building, c) Associated signage for proposed development. d) PV solar panels to roof of building, e)Alterations and extension to the as-built car park and access arrangement to provide for an additional 10 no car parking spaces (inclusive of 3 no accessible spaces), together with 5 no motorcycle spaces. 20 no bicycle spaces and a delivery van set-down area. f) Decommissioning and removal of existing wastewater treatment system, new foul drainage connection via proposed pumping station to existing foul drainage system to the northern end of the development site adjacent to Food Central Road, surface water discharge via attenuation controlled outlet to adjoining drain on eastern side of site. g) All associated site works, landscaping, lighting and ancillary works necessary to facilitate to proposed development. h) Alterations to the hours of operation from 9.00am-5.00pm Monday to Saturday. to 7.30 am-7.00 pm Monday to Friday and 8.00 am-7.00pm Saturday to Sunday.
The developement consist / will consist of the following: 1. Retention permission is sought for: a) Extension to as-built Farm Shop (Reg. Ref. F15A/0564) consisting of cafe area of 34.24 sqm together with outdoor seating area. Works to facilitate this alteration were inclusive of internal amendments, changes to windows, doors and opes of the as-built development; and b) Alterations to car parking layout and access arrangements including the retention of 5 no additional car parking spaces (in addition to 25 no previously approved under F15A/0564). 2. Planning permission is sought for: a) Change of use from existing store to cafe seating area to southern end of existing building. b) A 215.53 sq. meter extension to existing Farm Shop and Cafe, together with outdoor seating area. The extended areas will consist of: i) Farm shop cold room and main store, kitchen and ancillary areas, lobby, cafe seating, plant rooms and bin store to the eastern side of existing building; ii) Meeting room, staff facilities, storage facilities and 1 additional female toilet in addition to existing toilet facilities to the western side of existing building; iii) New entrance lobby to the northern side of existing building. c) Associated signage for proposed development. d) PV solar panels to roof of building. e)Alterations and extension to the as-built car park and access arrangement to provide for an additional 10 no car parking spaces (inclusive of 3 no accessible spaces), together with 5 no motorcycle spaces, 20 no bicycle spaces and a delivery van set-down area. f) A designated EV charging hub and access road to the northern end of the site consisting of 8 no EV charging bays (inclusive of 1 no. accessible bay) in Phase 1 and 6 no. EV charging bays in Phase 2 of the development, together with ancillary equipment, ESB sub-station/switch room and accessible toilet facility. g) Decommissioning and removal of existing wastewater treatment system, new foul drainage connection via proposed pumping station to existing foul drainage system to the northern end of the development site adjacent to Food Central Road, surface water discharge via attenuation controlled outlet to adjoining drain on eastern side of site. h) All associated site works, landscaping, lighting and ancillary works necessary to facilitate the proposed development. i) Alterations to the hours of operation from 9.00am - 5.00pm Monday to Saturday, to 7.30am - 7. 00pm Monday to Friday and 8.00am - 7.00pm Saturday to Sunday.
The development will consist of Retention permission for 1) Truck wash and associated plant room 2) Security hut 3) Amendments to internal office and staff accommodation layouts from previously granted planning ref FW22A/0136 4) and minor changes to landscape scheme previously granted planning ref FW22A/0136 And Planning Permission for • a new temperature-controlled warehouse incorporating ancillary offices and staff facilities, solar PV panels, roof smoke vents, loading area with associated dock levellers, high level covered link to existing warehouse and all hard and soft landscaping, boundary treatments, external lighting, LED signs, external roof access stairs and all associated site development works.
The development will consist of a temporary (5 year lifespan) construction contractor 'West Compound' on a 5.9 ha site adjoining the R108 public road. The proposed development will include the continuation of use of the existing North Runway contractor compound (including existing office cabins, vehicle workshop, security gatehouse, soil mounding and foul sewer tank) along with a number of amendments and additions to the existing facility to provide a consolidated 'West Compound' for airside development contractors. The amendments and additions to the existing facility include: reduced car parking (150 no. spaces), new truck parking (25 no. spaces) and trailer set down area, new bus stop, cycle parking provision, a new hardstanding area for skip set down, new streetlighting and electrical switchroom. The proposal includes all associated ancillary development, site works and services including underground attenuation system.
Three illuminated 'Bunzl' identity signs and various other non-illuminated locational and directional signs.
The development will consist of a designated EV charging hub and access road, consisting of 8 no EV charging bays ( inclusive of 1 no. accessible bay) in phase 1 and 6 no. EV charging bays in phase 2 of the development, together with ancillary equipment, ESB sub-station/switch room and accessible toilet facility. All associated site works, landscaping, lighting and ancillary works necessary to facilitate the proposed development.
The development will consist of a new temperature-controlled warehouse incorporating ancillary offices and storage areas and staff facilities, ESB substation, solar PV panels, loading area with associated dock levellers, hard and soft landscaping, boundary treatments, new vehicular entrance, Access controlled gate, car parking, bicycle parking, HGV parking spaces, trailer parking spaces, lighting, signage, and all associated site development works. AI received 10/10/2022
The development will consist of changes to previously granted temperature-controlled warehouse (planning ref FW22A/0136) Namely 1. Removal of parapet from main warehouse. 2. Revised size of proposed signage 3. New external maintenance stairs to the side elevation to include all associated site development works.
The development will consist of
The development will consist of the following:
A) Provision of an internal ESB substation and switch room within the previously granted Unit(N8), Reg Ref: FW20A/0187, (b) 1no. 10.075 metres diameter, 9.67 metres high sprinkler tank and single storey 30m2 pump room, (c) 1 no. metal clad plant enclosure over 3 storeys 27x8x13.5m high, situated to rear if the unit, (d) 2 no ancillary metal clad plant enclosures, 3m high each, situated to side and rear of the unit, (e) Minor elevational changes to allow for ESB & exit doors, (f) Minor alterations to existing car park area - no change to existing numbers, all of the above to include associated site services works on an application area of 4.680 acres.
Permission for development consisting of the amalgamation, alteration and adjustment of previously permitted Unit 21 (Ref: F16A/0128) and Unit 22 (Ref: F17A/0664). The Development shall consist of the construction of a single storey infill between Units 21 and 22 measuring 318.3sq/m Gross Gloor Area (on a site area of 0.032 Hectares), construction of 56 additional car parking spaces (on a site area of 0.222 Hectares) to the Eastern side of Unit 22, provision for additional front elevation signage to Unit 22, complete with all associated site development works for underground duct work, drainage and utility services, on a total development site area of 0.2547 Hectares at Dublin Airport Logistics Park, St Margaret's Road, St Margaret's, Co Dublin, on behalf of Rohan Holdings Ltd.
Retention permission for change of use from agriculture of a single storey shed structure within the existing curtilage of the existing house for the purposes ancillary to the enjoyment of the house for storage of classic cars and machinery for personal use only, with an area of circa 300 sq.m. and a maximum ridge height of 4.2m.
The proposed development will consist of the construction of a standalone Sprinkler Tank & pump house within the existing service yard and associated site services works on an application site of 0.691 hectares
Development of 1 no. single storey CNG (compressed natural gas) compressor installation with a floor area of 23m²; 1 no. single storey ESB MV Substation with a floor area of 33m², 1.8m & 2.4m high fences, fuelling dispensers, forecourt, fuel totem, access to existing private road and associated ground works. AI received 10/12/21
Killick Aerospace Limited is applying for planning permission at Unit N3 Horizon Logistics Park, Swords, Co. Dublin. The works will consist of internal modifications to existing Unit N3 (reg ref. FW20A/0187) to include alterations to existing office space at ground floor plus new mezzanine to warehouse.
Permission to erect a new 5.2m v 1.85m x 2.8m stainless steel and glass bus shelter with 1 No. double sided internally illuminated advertising panels of 2 sq. m area per side (4 sq. m total) located on the public footpath at Bus Stop No. 324 Harristown Road, Horizon Logistics Park, Swords, Co. Dublin, along with all associated site works.
The development subject to Retention Permission consists of amendments to the Food Processing Warehouse facility permitted under Fingal County Council Reg. Ref. FW20A/0202 comprising: the provision of a mezzanine floor level (totalling 131 sq.m, which increases the floor area to c. 11,567 sq.m) comprising workshop and switchgear room with associated external emergency stairs; the reconfiguration of selected internal spaces; the provision of a Permanent Roof Edge Protection System 1.1 metre high railings) in lieu of previously permitted Fall Protection Safety System; the omission of roof vents to freeze cells; the provision of 2 No. roof vents and a water tank frame on the roof of the ancillary office building; elevational changes; modifications to signage; minor changes to finished floor levels; the relocation of the ESB substation; the provision of a sliding gate at vehicular entrance; modifications to the foul sewer and watermains layout; and all associated site and development works above and below ground. All on 6.12 hectare site. The development will also consist of the following proposed amendments to the food processing warehouse facility permitted under Fingal County Council Reg. Ref. FW20A/0202: the omission of the green roof to be provided by the ancillary office building; the removal of the ground mounted solar panels adjacent to the ESB substation; and all associated site and development works above and below ground.
The development will comprise the provision of a food processing warehouse facility (11,696 sq m) comprising a coldstore (10,955 sqm) with a maximum roof level height of 18.65 metres and a fire escape stairs extending to 19.8 metres; an ancillary office building (610 sqm) with a maximum height of 8 metres, including office space, meeting rooms, canteen locker rooms, toilet facilities and assoicated facilities; and 4.3 metre high driver welfare facilities building (131 sqm). The proposed development will also include the provision of a new vehicular entrance off the Food Central Access Road; internal roadways; traffic barriers; pedestrian access; 90 No. ancillary car parking spaces; bicycle parking; 52No. HGV parking spaces; 33 No. trailer parking spaces level access goods, hard and soft landscaping; smoking shelter; bioundary treatments; ESB substation; signage; PV panels a truck wash; a diesel tank; 2 No. diesel pumps with a layby for 8 No. trucks; weighbridge; waste storage area; lighting and assoicated site development works above and below ground. The scheme also includes retention permission for 33 No. trailer parking spaces (providing a total of 66 No. trailer parking spaces).
Planning permission is being sought for
The proposed development consists of the following: The construction of 8 no. light industrial/warehouse (including wholesale use) / logistics units including ancillary office use and entrance/reception areas over two levels, with maximum height of c. 15.5 m and combined total gross floor area (GFA) of 39,732 sq.m. (units N1-N8); The demolition of 2 no. existing agricultural sheds and the construction of a link road (Estate Road No. 4), extending south from the proposed development to connect with existing road infrastructure (Sillogue Green); The implementation of a new internal road network with all access points, internal access roads and footpaths, service yards and access roads, cycle paths and landscaping; The construction of 2 no. new roundabouts on Estate Road No. 4, the construction of Estate Road No. 3 branching west and the extension of Estate Road No. 2 which currently serves Horizon Logistics Park; The development includes 2 no. ESB substation buildings and switchrooms (with a combined GFA of 68 sq.m.), service yards including loading bays, bin storage areas and a total of 395 no. car parking spaces, 8 no. motorcycle parking spaces and 202 no. cycle parking spaces; The proposal includes landscaping and planting, boundary treatment, lighting, security fencing and all associated site services and development works including underground foul and storm water drainage network and sustainable urban drainage systems, all on a site of 14.64 hectares. A Natura Impact Statement will be submitted to the Planning Authority with the planning application. AI received 20/04/21 AI deemed significant 22/04/21 Revised notices received 30/04/21
Detached dormer dwelling, on-site wastewater treatment unit and percolation area, associated site works and utilising existing vehicular access serving the site.
The development will principally consist of part single storey and part storey and a half extensions to the front (south-west), side (south-east) and rear (north-east) of the existing dwelling and the conversion of the existing attic into habitable space. The works will result in an increase in floor area from 264 sqm to 431 sqm. The development will also include internal alterations, elevational changes, the provision of a private terrace at first floor level facing north-east and all associated site development works above and below ground. The existing treatment plant and percolation area will be removed, and a new wastewater treatment system, polishing filter and storm water management system will be provided to facilitate the extended dwelling.
The development shall consist of the construction of two single storey units (Unit 23 and 27) for Industrial and/ or Warehouse use with associated ancillary two storey offices and car parking, comprising a total gross floor area of 10,718.84 m2. Unit 23 shall measure 4,485.45 m2 complete with 50 carpark spaces and Unit 27 shall measure 6,215.89 m2 complete with 71 carpark spaces. The development will also include an ESB sub-station to Unit 27, measuring 17.5 m2, service yards, signage to the proposed units, the extension of Birch drive to the east, service access roads and all associated landscaping and ancillary site works for undeground duct work, drainage and utility services, on a site area of 2.40 hectares.
A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the planning application and the NIS will be available for inspection or purchase for a fee not exceeding the reasonable cost of making a copy at the offices of the Planning Authority We, HPREF Dublin Office DevCo 1 Limited, intend to apply for planning permission for development at Horizon Logistics Park (known as Site G1), off the R108, at the townlands of Silloge and Harristown, St. Margaret's, Swords, Co. Dublin. The proposed development is located to the east of the development permitted under Reg. Ref.: FW20A/0187 (known as the Site N development), and to the southwest of the Harristown Bus Depot. The proposed development consists of the following: o The construction of 1 no. light industrial / warehouse (including wholesale use) / logistics building (Unit G1) with a gross floor area (GFA) of c. 4,203 sq.m (including 656 sq.m of ancillary welfare and office space over two levels). The proposed building will have a main parapet height of c. 14.8 metres. o Provision of 44 no. car parking spaces (including 3 no. disabled parking spaces and 5 no. electrical vehicle parking spaces), 44 no. bicycle parking spaces within bicycle shelter structures, and 5 no. motorcycle spaces; o Provision of an ESB substation (with a GA of c. 35.75 sq.m) to the southeast of the main building. • Provision of a service yard and loading bays to the east of the main building, bound by a 2.4m high fence. Provision of a recycling and bin store to the south of the service yard. Provision of access arrangements to the proposed development including an access from the estate road to the west of the site and provision of new cycle and pedestrian path alongside the estate road. Provision of landscaping and amenity space to the north and east of the site, planting, and boundary treatments. The proposal includes signage zones, PV panel zones at roof level, building plant, site lighting, security fencing, and all associated site services and development works, including underground foul and storm water drainage network and sustainable urban drainage systems
Permission for the provision of a single storey over basement domestic car garage, storage and ancillary residential extension which will be positioned to the north of the existing dwelling, connecting at basement level via proposed new stairs to the dwelling house. The proposed development will comprise 84 sq m at ground floor level and 278 sq m at basement level. The development will also include a green Sedum roof; 3 no. skylight windows to the basement, a new hardwood timber gate; drystone walling, rain collection tank, water pump, boundary treatments; landscaping and all associated site development works above and below ground.
The introduction of ancillary accomodation and office space at second floor (including partial mezzanine area) and alterations to the existing fenestration to the south and west elevations of approved planning ref (FW20A/0209).
The development consists of the material change of use from warehouse space to (a) a single storey climate controlled room (2,493m2), clean room (60m2) and office (42m2) to the warehouse area, cold store rooms to the mezzanine undercroft (187m2) comprising total gross floor area of 2,782m2, (b) two large tanks, one containing water servicing the sprinkler system (8.462m high/9.3m diameter) and one containing liquid nitrogen (8.15m high/3.57m diameter) and associated sprinkler pump room (35m2) to the rear service yard area and (c) all associated site works. AI Received 24th September 2025 Significant Additional information Received 14/10/2025
Construction of a central warehouse & logistics distribution centre, with an overall GFA of c. 26,865 sq.m, including an ancillary office and welfare area of c. 1,352 sq.m. and associated standalone services buildings of c.121 sq.m on a site area of c. 5.238 Ha. The warehouse building is orientated east-west across the subject site, with a primarily rectilinear form complete with stepped ground floor office / staff entry level, located to the west. The proposed warehouse building has an overall length of c. 225 metres, with a depth of c. 126 metres and a parapet height of c. 21 meters above ground level to the North, South and East and c. 24.75 meters to the West. The proposed office has a parapet height of c. 15 meters above ground level. A sprinkler tank with associated pumphouse complete with provision for a generator compound, switch room and transformer room are located along the northern boundary of the site. A substation is proposed centrally on the southern boundary. Parking and office space are orientated towards the front / west of the site, facing the estate entrance. The proposal provides for 161 no. car parking spaces (including 8 no. accessible parking spaces and 35 EV charging spaces), 8 motorcycle spaces, accessed from the southwest of the site. A separate pedestrian and bicycle access to 50 bicycle parking spaces is located centrally on the southern boundary adjacent to the office. A service yard and loading bays are proposed to the south of the building, with a single HGV access point provided in the southeastern corner. There are 24 no. loading docks proposed along with 3 no. grade access doors. Solar panels are proposed for c. 10% of the roof area. Landscaping and screening is proposed throughout the site and along the southern boundary complete with upgrading of pedestrian and bicycle access routes complete with all associated works and services.
The development will consist of proposed new signage to the front of the existing warehouse building (facing the road) at high level.
Amendments to previously approved permission FW19A/0215 &