to
to

Planning records

Showing 1-50 of 29,632 public records
PreviousPage 1 of 20
FW21B/0111

New single storey extension to rear of existing bungalow also reduction in depth of existing windows to living room to front and bedrooms 1,3,4 and 5 and to apply new external insulation to entire property and all associated site works.

Asdills Lodge, Spricklestown, The Ward, Co. Dublin.Fingal County CouncilPermission0 reasons0 conditions0.2 km away
Granted13 August 2021
FW25A/0126E

The development will consist of: Relocation of the front vehicular access. Addition of a new front canopy over a reoriented front-facing door. Installation of a new gable window on the front side and a new window to the side rear replacing patio doors.

Hollymount, Spricklestown, The Ward, Co. Dublin, D11 T208Fingal County CouncilPermission0 reasons0 conditions0.3 km away
Granted19 May 2025
FW21A/0102

Permission to erect 4,886.00 m2 of photovoltaic panels on the roof of the dry warehouse building and freezer/chiller warehouse building in our factory with all associates site works. AI received 20/08/21

Pallas Foods, Killamonan, The Ward, Dublin 11Fingal County CouncilPermission0 reasons0 conditions0.4 km away
Granted14 September 2021
FW22A/0167

The development will consist of: the provision of c. 72,753sq.m of logistics and associated office uses across 5 no. buildings (Building 1, c. 23,936sq.m and a height of c. 17.25m, Building 2, c. 16,999sq.m and a height of c. 17.2m, Building 3, c. 13,472sq.m and a height of c. 17.25m, Building 4, c. 10,058sq.m and a height of c. 17.25m, and Building 5, c. 8,195sq.m and a height of c. 17.63m), within a business campus setting; associated yard areas, trailer and truck parking together with car and bicycle parking spaces at surface level; a single storey campus management building (c. 93sq.m) with an adjacent canopy and seating area to facilitate outdoor dining / social space; revised and new pedestrian, bicycle and vehicular entrances; internal pedestrian, bicycle and vehicular circulation including a new pedestrian and bicycle link to the R121; associated landscaping, parkland area and public open space, boundary treatments, lighting, signage, CCTV; associated drainage, attenuation and services; and all associated construction compounds and site works. An Environmental Impact Assessment Report accompanies the planning application. AI received 12/12/22

Lands comprising c. 26.8ha to the north of the Cherryhound, TyrrelstowFingal County CouncilPermission0 reasons0 conditions0.6 km away
Granted14 February 2023
FW25A/0298E

The development will consist of: revisions to the previously permitted communal facility (93sqm) under Fingal County Council Reg. Ref. FW22A/0167, which includes community space, security office, ancillary storage, covered external social space and associated external areas. These revisions involve interior and exterior modifications to the communal facility and associated external areas, including: (i) Reconfiguration and modification of the internal floor plan to remove the security office and introduce a kitchenette and a meeting room, reducing the total internal floor area from 93 sqm to 66.4 sqm; (ii) Modification to the canopy roof finish from a mono-pitched to a flat roof style, reducing the overall building height from 5.257m to 3.667m (a reduction of c.1.5m); (iii) Reduction of the canopy roof coverage area from c. 606sqm to 405sqm; (iv) Inclusion of dedicated integrated bin store/utilities enclosure (15.5sqm) to serve the communal facility and ancillary site; (v) Changes to elevations and facades, including adjustments to fenestration, minor design feature modifications, and updates to materials; (vi) Provision of a new vehicular access point to the southeast of the site; (vii) Provision of 10 no. car parking spaces and bicycle parking (5 no. bicycle stands); (viii) Provision of an access laneway to the south of the communal facility; (ix) Revisions to the landscaping to the associated external area and all other ancillary works.

Site north of the Cherryhound-Tyrrelstown M2/M3 Link Road and west ofFingal County CouncilPermission0 reasons0 conditions0.6 km away
Granted08 September 2025
FW25A/0261E

The development will consist of: revisions to the previously permitted Unit 4, which includes a main logistics/warehouse hall and ancillary office building (combined area of approximately 10,058 sqm) under Fingal County Council Reg. Ref. FW22A/0167. These revisions involve interior and exterior modifications to Unit 4 and associated external areas, resulting in a net increase of 139 sqm, including: (i) Modification of the height (from 8.3 to 8 m) and footprint of the permitted ancillary office building, comprising retracting the eastern elevation and extending the building footprint towards the northern elevation; (ii) Internal layout revisions and reconfiguration of spaces within Unit 4’s main logistics/warehouse hall and ancillary office building, including adding c. 116 sqm of mezzanine space for mechanical plant; (iii) Changes to elevations and facades, including adjustments to fenestration, minor design feature modifications, and updates to materials; (iv) Roof level revisions, including increased automatic ventilation openings, reduced permitted photovoltaic panels, 2 no. new roof access points, and relocation of an existing roof access; (v) Relocation of the permitted ESB substation and associated switch room from within Unit 4 to an external area as a standalone structure (c. 49.7 sqm); (vi) Revisions to the layout of permitted car, bicycle, and heavy goods vehicles (HGV) parking areas, resulting in a net reduction of 3 no. car parking spaces and 2 no. HGV parking spaces; (vii) Minor revisions to exterior spaces, including replacing the permitted mineral plaza with planting, omitting the permitted gatehouse, chemical storage and a section of footpath, relocating the permitted refuse area and plant compound, and providing 2 no. pedestrian crossings along with 2 no. access gates and fencing (c. 2.4 m) for the permitted fire tender access route; (viii) Demolition of existing ESB electricity pylon (c. 25 m height lattice tower) and installation of new electricity pylon (lattice tower with maximum height of 37 m) and associated reinstatement works; and, (ix) All other ancillary associated works.

Site north of the Cherryhound-Tyrrelstown M2/M3 Link Road and west ofFingal County CouncilPermission0 reasons0 conditions0.7 km away
Granted08 August 2025
FW22A/0201

Permission for development at a site of c. 61.1 hectares. The development will consist of: a 10 year permission for the construction of a Solar Photovoltaic (PV) panels on ground mounted frames/support structures within existing field boundaries; 6 no. transformer stations; inverters; 3 no. weather stations; all ancillary underground cabling and ducting; internal site acc3ess tracks; site perimeter (stock-proof) security fencing; CCTV structures; 1 no. storage container; landscaping including screen planting; new vehicular access from R121 (Regional Road); 1 no. temporary construction compound; and all associated site development works. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application. AI received 30/5/2023 AI deemed signifcant ** Revised Public Notices received 6/6/2023

Irishtown, Spricklestown, Ward Lower, DublinFingal County CouncilPermission0 reasons0 conditions0.8 km away
Granted25 July 2023
FW25A/0513E

The development will consist of revisions to the campus management/community building with associated outdoor sports/amenity space and retail unit, the central landscaped amenity area to the west and northwest of the building and the internal road network, as permitted under Fingal County Council Reg. Ref. FW23A/0191. The proposed development will comprise of the following: (i) Reduction in the footprint of the permitted campus management/community building from c. 689 sqm to c. 478.5 sqm (a reduction of 210.5 sqm). The height of the northern portion of building will be reduced from c. 9.5m to c. 6.5m (a 3m reduction) while the southern portion of the building will be reduced from c. 5.3m to 4.5m (a 0.8m reduction); (ii) Revisions to the internal layout of the permitted campus management/community building including the replacement of the multi-use sports hall with yoga and gym studios, incorporation of the permitted associated retail unit with the café space (c. 109sqm) resulting in a combined retail/café space (c. 127 sqm) within the campus management / community building; (iii) Changes to elevations and facades of the campus management/community building, including adjustments to fenestration, minor design feature modifications and updates to materials; (iv) Reconfiguration of the car parking area to the east of the campus management/community building and relocation of vehicular access point to the car parking area; (v) Omission of canopies and seating arrangements permitted to the northwest of the campus management/community building; (vi) Relocation of the multi-use games area (MUGA) to the western portion of the central amenity area; (vii) Provision of 2 no. external padel courts with associated lighting and playground within the central amenity area; (viii) Provision of additional 15 no. car parking spaces to serve the MUGA and padel courts to the west of the central amenity area; (ix) Revisions to the internal road network and bus stop; (x) Revised landscaping details, drainage arrangements, lighting and all associated works. Additional Information Received 13/02/2026

Site northwest of the Cherryhound-Tyrrelstown M2-M3 Link Road and soutFingal County CouncilPermission0 reasons0 conditions0.8 km away
Granted10 March 2026
FW25A/0062E

Planning permission is sought for the proposed development that will consist of the installation of 1 no. temporary signage structure with uplighting, mounted on a lightweight steel structure over a concrete base (2.5m x 6m) with an aluminium display panel (6m width x 6m height), and all associated site works. The overall height, including the concrete base, is c. 8.1m.

Site north of the Cherryhound-Tyrrelstown M2/M3 Link Road and west ofFingal County CouncilPermission0 reasons0 conditions0.8 km away
Granted17 April 2025
FW25A/0494E

The development will consist of revisions to the previously permitted Unit X2 and Unit X3, each comprising a main logistics/warehouse hall with ancillary office buildings, under Fingal County Council Reg. Ref. FW23A/0191. For the purposes of this application Unit X2 will be referred to as Unit 7 and Unit X3 will be referred to as Unit 8. These revisions involve interior and exterior modifications to the permitted buildings and associated external ancillary buildings. The proposed development will comprise of the following; (1) Amendments to Unit 7 which will include: (i) Modification to the external footprint and internal layout of Unit 7 resulting in a net decrease in GFA from 8,072.4 sqm to 8,030 sqm (a reduction of 42.4 sqm); (ii) Reconfiguration of internal layout of the warehouse hall, resulting in an increase in floor area of the marshalling office from 50.1 sqm to 71 sqm (an increase of 20.9 sqm) and the removal of the marshalling office mezzanine (54.6 sqm), with associated adjustments to the hall façades; (iii) Increase in overall height of Unit 7 from 17.065m to 17.15m (an increase of c. 0.085m); (iv) Increase in plant deck area mezzanine from 31 sqm to 91 sqm (an increase of 60 sqm); (v) Internal layout revisions and reconfiguration of the ancillary office layouts, including slight reduction in gross floor area from 747.6 sqm to 739 sqm (a decrease of 8.6 sqm); (vi) Changes to elevations and facades, including adjustments to fenestration, minor design feature modifications, and updates to materials; (vii) Reduction in the size of the permitted substation serving Unit 7 from c. 50 sqm to c. 26 sqm (a reduction of 24 sqm) (viii) Modification to the design and footprint of bicycle store associated with Unit 7 resulting in an increase in internal floor area from 55 sqm to 60 sqm; and (ix) All other ancillary and associated site development works, including modifications to drainage arrangements. The proposed amendments to Unit 7 will result in a net decrease in the gross floor area by 42.4 sqm and a net decrease in the gross floor area of the substation by 24 sqm. (2) Amendments to Unit 8 which will include: (i) Modification to the external footprint and internal layout of Unit 8 resulting in a net decrease in GFA from 4,896.4 sqm to 4,803 sqm (a reduction of 93.4 sqm); (ii) Reconfiguration of the internal layout of the warehouse hall, including the removal of marshalling office (50 sqm) and marshalling office mezzanine (54.6 sqm), with associated adjustments to the hall facades; (iii) Reduction in overall height of Unit 8 from 17.065m to 16.945 (a decrease of 0.12m); (iv) Increase in plant deck area mezzanine from 30.4 sqm to 95 sqm (an increase of 64.6 sqm); (v) Reconfiguration of ancillary office layout, including reduction in gross floor area from 663.3 sqm to 584 sqm (a decrease of 79.3 sqm); (vi) Changes to elevations and facades, including adjustments to fenestration, minor design feature modifications, and updates to materials; (vii) Reduction in size of the permitted substation serving Unit 8 from c. 50 sqm to c. 26 sqm (a reduction of 24 sqm) (viii) Relocation and modification to the design and footprint of the bicycle store associated with Unit 8 resulting in an increase in internal floor area from 55 sqm to 60 sqm; and (ix) All other ancillary and associated site development works, including modifications to drainage arrangements. The proposed amendments to Unit 8 will result in a net decrease in the gross floor area by 93.4 sqm and a net decrease in the gross floor area of the substation by 24 sqm

Site northwest of the Cherryhound-Tyrrelstown M2-M3 Link Road and, souFingal County CouncilPermission0 reasons0 conditions0.8 km away
Granted23 January 2026
FW23A/0191

The development will consist of: the provision of 12 no. logistics/warehouse buildings (c. 159,924 sq.m) as follows: Building X1 (c. 6,364 sq.m and a height of c. 17.06m), Building X2 (c. 8,072 sq.m and a height of c. 17.06m), Building X3 (c. 4,896 sq.m and a height of c. 17.06m), Building X4 (c. 42,490 sq.m and a height of c. 17.63m), Building X5 (c. 23, 102 sq.m and a height of c. 17.25m), Building X6 (c. 8,843.3 sq.m and a height of c. 17.25m), Building X7 (c. 6,339.5 sq.m and a height of c. 17.63m), Building X8 (c. 8,010.7 sq.m and a height of c. 17.25m), Building X9 (c. 10,684.2 sq.m and a height of c. 17.25m), Building X10 (C. 13,041.5 sq.m and a height of c. 17.25m), Building X11 (c.13,042.4 sq.m and a height of c. 17.25m), Building X12 (c. 15,038.4 sq.m and a height of c. 17.25m), each building will include an attached 2 to 3-storey ancillary office building ranging in height c. 8.35m to 12.10m; associated yard areas, trailer and truck parking, and car and bicycle parking spaces at surface level; ancillary facilities to include a campus management/community building (c. 689 sq.m) with associated outdoor sports/amenity space, a retail/café unit (c. 45 sq.m) and 12 no. substations (c. 604 sq.m combined); internal pedestrian, bicycle and vehicular circulation roads, lanes and pathways, with primary access via the existing roundabout at Cherryhound-Tyrrelstown M2-M3 Link Road and secondary emergency access via R121; new pedestrian/bicycle links to adjoining lands, including the provision of a pedestrian crossing and bus shelter at Hollywoodrath Drive, and pedestrian/bicycle links to Hollywoodrath Drive, the R121 and lands to the northeast; associated landscaping, public open space, boundary treatments, lighting, signage and CCTV; associated drainage, attenuation and service connections; and all associated temporary construction compounds and site works. An Environmental Impact Assessment Report accompanies the planning application. AI rcvd 31/10/2023 SAI rcvd 07/11/2023

Lands (c.46.7 ha) located to the northwest of the Cherryhound-TyrrelstFingal County CouncilPermission0 reasons0 conditions0.9 km away
Granted10 January 2024
FW24A/0539E

The development will consist of an extension to the existing facility of 2112m2 warehousing cold storage with 39m2 dispatch office, an extension to truck park area to northeast boundary and all associated site works. AI Received 19/02/2025

O'Toole Transport, Bay Lane, Hollywoodrath, D15 WDN7Fingal County CouncilPermission0 reasons0 conditions0.9 km away
Granted13 March 2025
FW25A/0507E

The development consists of amendments to permitted Reg Ref FW24A/0471E. The amendments consist of: 1) the change of 4no. house types from A1/A2 type, 3-bed two storey houses, to B1/B2 type, 4-bed two storey houses. 2) the omission of 1no. 4-bed two storey house type E, replaced with 2no. 4-bed two storey houses type B1/B2 and associated road layout, parking layout revision. Additional Information Received 23/02/2026 Significant Additional Information Received 12/03/2026

Hollywood, Ratoath Road and Gallanstown Road, Hollystown, Dublin 15Fingal County CouncilPermission0 reasons0 conditions1.1 km away
Granted02 April 2026
FW20B/0141

The development will consist of 1. Construction of a new single storey flat roof side and rear extension to consist of a living room and study. 2. General remodel and upgrade of the main dwelling to suit the proposed layouts. 3. All drainage, structural and associated site works to be implemented.

2 ChapelWood Drive, Hollystown, Dublin 15, D15 WF83Fingal County CouncilPermission0 reasons0 conditions1.1 km away
Granted15 December 2020
FW22B/0084

1) Single storey domestic garage to gable end and rear of house. 2) Single storey extension to rear of house as addition to existing single storey extension.

9 Chapelwood View, Hollystown, Dublin 15, D15 KVF7.Fingal County CouncilPermission0 reasons0 conditions1.1 km away
Granted29 August 2022
FW22B/0031

Construction of a single storey extension to the rear and side of existing dwelling and a single storey porch to the front of the existing dwelling. The development will consist of a new porch, new playroom and home office and other minor alterations to existing internal layout together with all associated site works. AI received 17/10/2022

19, Alderwood, Hollystown, Dublin 15Fingal County CouncilPermission0 reasons0 conditions1.1 km away
Granted03 November 2022
FW24A/0433E

Permission for a proposed development to install 33kV underground cabling and associated infrastructure required to connect Irishtown Solar Farm (permitted under Fingal County Council Reg. Ref. FW22A/0201) to the grid via the existing Gallanstown 110kV substation (Ballymacarney and part of Baytown, The Ward, County Meath), on lands at Irishtown, Spricklestown, Ward Lower, Co. Dublin. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application.

Irishtown, Spricklestown, Ward Lower, County DublinFingal County CouncilPermission0 reasons0 conditions1.1 km away
Granted12 December 2024
FW21B/0115

New ground floor extension to rear/side with internal modifications and associated site works.

25 Alderwood, Hollystown, Dublin 15, D15 W592Fingal County CouncilPermission0 reasons0 conditions1.1 km away
Granted12 August 2021
FW24A/0471E

Planning permission is sought for a development that will consist of the construction of 86 no. dwellings (9 no. 2-bedroom 2-storey terraced dwellings; 50 no. 3-bedroom 2- and 2.5-storey terraced, semi-detached, and detached dwellings, and 27 no. 4-bedroom 2-storey semi-detached and detached dwellings) and a 2- storey detached creche, with 188 car parking spaces (including 9 no. spaces for creche staff and drop-off area, and 179 no. spaces for residential use including 2 no. visitor spaces) including accessible parking and EV charging, and 1 no. motorbike parking space, with bicycle parking spaces provided within the curtilage of each unit and bicycle parking provided for the creche. The proposed development will provide for public open space, landscaping and boundary treatments; public lighting; bin and cycle storage; ESB substation; foul drainage works along Ratoath Road together with all associated site infrastructure and engineering works necessary to facilitate the development, including the diversion of an existing surface water pipe within the site, to now run along the site's eastern and southern boundaries. Vehicular and pedestrian access is proposed via Gallanstown Road, including 2 no. new pedestrian crossings, at Ratoath Road, along with new traffic calming measures along Ratoath Road. The proposed development also provides for a new bus turning area along Ratoath Road. AI Received 21/03/2025

Lands at Ratoath Road and Gallanstown Road, Hollystown, Dublin 15Fingal County CouncilPermission0 reasons0 conditions1.1 km away
Granted16 April 2025
FW19A/0207

A soil and stone recovery facility that will allow for the full restoration of the lands that currently constitute a disused quarry, access via the already established existing site entrance, a new temporary administration building, a new temporary welfare facility, a new temporary weighbridge office, the relocation of the existing weighbridge, a new temporary internal access road, a new temporary storage facility, a new temporary wheelwash facility, removal of the existing fuel storage tank, temporary car parking, temporary lighting, temporary associated infrastructure, landscaping and all ancillary site works. An Environmental Impact Assessment Report and a Natura Impact Statement accompany this planning application and both documents are available for inspection or purchase. The proposed development will require a waste licence from the Environmental Protection Agency in order to operate.

The Townland of Bay, Bay Lane, St Margarets, Co DublinFingal County CouncilPermission0 reasons0 conditions1.1 km away
Granted06 February 2020
FW23A/0036

Planning Permission for a residential development of lands at Ratoath Road and Gallanstown Road, Hollystown, Dublin 15. The site is within the curtilage of Hollywoodrath House ( a protected Structure). The proposed development will consist of the construction of 96 no. dwellings (9 no. 2-bedroom, 2 storey terraced dwellings; 60 no. 3-bedroom, 2- and-2.5 storey, terraced and semi-detached dwellings; 27 no. 4-bedroom, two-storey, semi-detached and detached dwellings) with 192 no. car parking spaces and 62 no. bicycle parking spaces. The proposed development will provide public open space, landscaping, trees, and boundary treatments; public lighting; bin and cycle storage; ESB substation; foul drainage works along Ratoath Road together with all associated site infrastructure and engineering works necessary to facilitate the development. Vehicular and pedestrian access is proposed via Gallanstown Road together with pedestrian access, including 2 no. new pedestrian crossings, at Ratoath Road. AI rcvd 06/10/23 SAI received 12/10/23

Within the curtilage of Hollywoodrath House (A Protected Structure), LFingal County CouncilPermission0 reasons0 conditions1.2 km away
Refused06 November 2023
FW21A/0003

Residential development on a site of c.1.7 hectares at Hollystown, Dublin 15. The site is within the curtilage of Hollywoodrath House, Hollywood, Hollystown, Dublin 15 (Protected structure RPS 0665). The proposed development comprises the following: Construction of 52 no. residential units consisting of 30 no. houses ranging in height from 2 no. to 3 no. storeys (1 no. one-bed unit, 6 no, two-bed units, 21 no. three-bed units and 2 no, four-bed units) and 22 no. apartment/duplex units (2 no. one-bed units, 11 no. two-bed units and 9 no three-bed units) within 3 no. blocks at 3 no. storeys (c. 12 m). All units include the provision of a private rear garden, balcony or terrace; Refurbishment of an existing former barracks building on site as a one-bed house unit with a gross floor area of c.47 sq. m. Provision of communal and public open space and children's play area; Provision of 81 no. carparking spaces and 65 no. bicycle parking spaces. Provision of wastewater pumping station and surface water attenuation system; New hard and soft landscaping and boundary treatment to all boundaries and new internal road layout including pedestrian footpaths, demolition of existing garden wall associated with the existing building on site, provision of new vehicular entrance located off the R121 road along the eastern boundary, provision of pedestrian entrances off the Ratoath Road along the southern boundary, surface water SuDS techniques, surface water connection to adjoining lands to the west, provision of green roof and all associated site development works necessary to facilitate the development.

Site at Hollystown, Mulhuddart, Dublin 15. The site is bound by RatoatFingal County CouncilPermission0 reasons0 conditions1.2 km away
Refused02 March 2021
FW25A/0472E

The development consists of amendments to permitted Reg Ref W24A/0471E. The amendments consist of, 1) revised design of detached two storey creche with a new floor area of 196.6sq.m (previously 341sq.m) and associated internal layout, play area, elevational, parking, bicycle layout and bin store updates. 2) the addition of 2no. three storey houses, Type C1 adjacent to the creche. 3) Change of house type from a C2, three storey house to a C1, three storey house. 4) Road layout revision at Hollywood Close to create a homezone with associated car parking updates and all ancillary site development works. Additional Information Received 17/02/2026 Significant Additional Information Received 27/02/2026

Hollywood, Ratoath Road and Gallanstown Road, Hollystown, Dublin 15Fingal County CouncilPermission0 reasons0 conditions1.2 km away
Granted26 March 2026
FW25A/0485E

The development consists of amendments to permitted Reg Ref FW24A/0471E. The amendments consist of the change of house type from a A3, 3-bed two storey house, to a A4, 4-bed two storey house.

Hollywood, Ratoath Road and Gallanstown Road, Hollystown, Dublin 15.Fingal County CouncilPermission0 reasons0 conditions1.2 km away
Granted16 January 2026
FW25A/0156

The development will consist of an increase in the maximum number of children to be accommodated in the existing Creche from 50 at any one time ( as conditioned within Condition No. 4 of the Grant of Planning Permission made under Planning Register Reference Number F07A/1454) to 77 Children and, the construction of a bicycle shelter to accommodate ten bicycles. Additional information received 10/11/25 Significant Additional Information received 28/11/2025

1 Chapelwood Drive, Hollystown, Dublin 15, D15 HP21Fingal County CouncilPermission0 reasons0 conditions1.2 km away
Granted16 December 2025
FW24A/0099

Permission to erect a new 5.2m x 1.85m x 2.8m stainless steel and glass bus shelter with 2 No. internally illuminated advertising panels of 2 Sq. m each (4Sq.m total) located on public footpath at Bus Stop no. 7560,opposite 3 Hollywoodrath Drive, Hollywoodrath, Dublin 15, along with all associated site works. AI received 23/09/2024

Bus Stop No. 7560, Opposite 3 Hollywoodrath Drive, Hollywoodrath, DublFingal County CouncilPermission0 reasons0 conditions1.2 km away
Granted16 October 2024
FW20B/0102

Permission for proposed two attached garages to side of two dwelling houses with associated site development works.

37 & 38, Alderwood, Hollystown, Dublin 15Fingal County CouncilPermission0 reasons0 conditions1.2 km away
Granted08 October 2020
FW25A/0350

Planning Permission is sought for works to existing semi-detached dwelling. Works to include: demolition of existing garden wall in side garden to allow for construction of single storey extension to the side of existing dwelling to accommodate office/music room with access from front and rear garden; 1no. skylight to proposed flat roof over proposed extension and all associated site and landscaping works.

39 Alderwood, Ballymacarney Road, Rathoath Road, Dublin 15, D15 F389Fingal County CouncilPermission0 reasons0 conditions1.3 km away
Granted09 October 2025
FW22A/0034

The development will consist of of 4 No. ground floor shops, a remote work hub, a stand-alone café with outdoor seated dining area and 17 No. residential units across 4 individual blocks ranging from one to three storeys on a site measuring circa 0.53 Hectares and comprising; (i) Block A: 2 storey block of 2 No. two bed and 3 No. 1 bed apartments over 4 No. ground floor shops, (ii) Block B: 3 storey block of 4 No. 2-storey 3-bedroom duplex units over a ground floor remote work hub, (iii) Block C: 3 storey block of 4 No. 2-storey 3-bedroom duplex units over 4 No. ground level 2 bedroom apartments, (iv) Block D: single storey standalone pavilion style café with outdoor seated dining area, (v) Ancillary bicycle storage, refuse storage and ESB substation in 3 individual single storey buildings, (vi) provision of 46 No. car parking spaces, 82 No. bicycle parking spaces and 2 No. motorcycle parking spaces, (vii) an area of public open space, including a children’s play area, (viii) relocation of an existing vehicular and pedestrian entrance off the Ratoath Road to the Northern end of the site frontage (ix) alterations to the existing boundaries and all associated site development works including hard and soft landscaping, service connections and drainage works including connections to the existing public foul and surface water systems in the Ratoath Road. AI received 17/6/2022

At lands adjoining ‘Duinch’ on the Ratoath Road at Hollystown, HollywFingal County CouncilPermission0 reasons0 conditions1.3 km away
Granted13 July 2022
FW20B/0167

A single storey pitched roof extension to the existing detached garage to provide a 'work from home' office space with garage and associated site works.

6 The Oaks, Hollystown, Dublin 15Fingal County CouncilPermission0 reasons0 conditions1.3 km away
Granted28 January 2021
FW20B/0029

Retention Planning Permission for a single storey side extension with alterations to existing building.

1 Church View, Hollystown, Dublin 15Fingal County CouncilPermission and Retention0 reasons0 conditions1.3 km away
Granted09 June 2020
FW24A/0474

Permission for retention of an attic conversion including two dormer windows to the front elevation and roof extension with windows to the rear elevation of the original bungalow and two single storey extensions to the rear, with a total additional area of 143 sq.m to the Dormer Bungalow.

Hollystown, Mulhuddart, Co. DublinFingal County CouncilRetention0 reasons0 conditions1.3 km away
Granted06 January 2025
FW24A/0132

Planning permission is sought for single storey building to rear garden, new building to have games room facility and home office/study room and all associated site works.

32 Hollywoodrath Drive, Hollystown, Dublin 15Fingal County CouncilPermission0 reasons0 conditions1.3 km away
Refused13 May 2024
FW25A/0486E

Permission for the construction of a new five bed detached, two storey dwelling (214sq. M), a new vehicular / pedestrian access, with a new dished kerb and all associated drainage / ancillary site works.

Lands to the Side/Rear of 6 The Oaks, Hollystown, Dublin 15, D15 E1WFingal County CouncilPermission0 reasons0 conditions1.3 km away
Refused20 January 2026
FW25A/0336E

Retention Planning Permission for 1. Detached single storey garage conversion to study/playroom to front, 2. Detached single storey timber cabin consisting of office room/Music room to rear garden, 3. Single storey timber cabin consisting of Gym/Games room/Storage and garden room, 4. Single storey detached bike shed to rear garden all with associated ancillary works.

5 The Oaks, Hollystown, Dublin 15, D15 X2D0Fingal County CouncilRetention0 reasons0 conditions1.3 km away
Granted06 October 2025
FW24A/0312E

Planning permission is being sought for a single storey extension (66m2) located to the side of the existing detached dwelling for use as a family granny flat.

No 6 Chapelton, Hollystown, Dublin 15, D15AX70Fingal County CouncilPermission0 reasons0 conditions1.3 km away
Granted16 September 2024
FW25A/0338

Retention development will consist of vehicular entrance to the side/front of the site. A partial flat roof single storey extension connecting the existing dwelling to the game's room/art studio. Retention for single storey extension to the side connecting with partial flat roof single storey to existing house. Moving the existing entrance door into the retention works. Retention for single storey detached office to the side of the existing house. Planning permission will consist of a proposed new dormer roof to the front of the existing dwelling roof to bring more natural light into the kitchen/living area. A new stone cladding finish to the side elevations of the dwelling matching in with neighbouring stone finishes and all ancillary works.

Lily Cottage, Hollywoodrath, Dublin 15, D15 A89HFingal County CouncilPermission and Retention0 reasons0 conditions1.3 km away
Granted06 October 2025
FW20A/0066

For the construction of a single 2 storey 3 bedroom detached dwelling with storage in the attic space along with the relocation of existing storage sheds, new boundary treatment, access road, water treatment system, removal of existing posts and nets onto existing golf course and all other ancillary site development works.

12 The Oaks, Hollystown, Dublin 15Fingal County CouncilPermission0 reasons0 conditions1.3 km away
Refused14 July 2020
FW22A/0149

Construction of a single storey garage/shed (50m2) to rear of existing house, with amended side entrance and ancillary site works,

18 Hollywood Rath Lawns, Hollystown, Dublin 15, D15 X2ON.Fingal County CouncilPermission0 reasons0 conditions1.3 km away
Granted29 August 2022
FW24A/0006

The proposed development will conist of

2 Hollywoodrath Meadows, Hollystown, Dublin 15, D15 R8DPFingal County CouncilPermission0 reasons0 conditions1.4 km away
Granted20 February 2024
FW22B/0103

Development comprising erection of 1 no. single storey ancillary garden room area (34m2 nett internal approx) 40m2 gross approx to including associated site works in rear garden (area 134m2 & overall site of area 323m2 0.032ha).

10, Hollywoodrath Lawns, Hollystown, Dublin 15, D15XEH4Fingal County CouncilPermission0 reasons0 conditions1.4 km away
Granted17 November 2022
FW26A/0088E

The development will consist of the conversion of the attic into habitable accommodation, a two-storey rear extension including attic-level accommodation with a flat-roof dormer, a two-storey side extension, and the installation of new window and dormer windows to the western side of the property, together with all associated site works.

13 Redwood, Hollystown, Dublin 15, D15 VH94Fingal County CouncilPermission0 reasons0 conditions1.4 km away
Granted30 April 2026
FW23A/0057

Planning permission for a single storey rear extension and alterations to existing two storey dwelling including the subdivision of existing house at ground floor level to create a self contained one bedroom living unit and all associated site works at 18 Hollywoodrath, Hollystown, Dublin 15. AI Rcvd 03/10/2023

18 Hollywoodrath Park, Hollystown, Dublin 15Fingal County CouncilPermission0 reasons0 conditions1.4 km away
Refused23 October 2023
FW21B/0090

The development shall consist of a single storey extension to the rear of the existing semi-detached dwelling and all associated site works.

No. 20 Hollywoodrath Park, Hollystown, Dublin 15Fingal County CouncilPermission0 reasons0 conditions1.4 km away
Granted12 July 2021
FW22A/0098

A 10 Year PERMISSION for development of a site of c 9.3ha in the townlands of Hollystown and Yellow Walls on part of the former Hollystown Golf Course lands, Ratoath Road, Hollystown, Dublin 15, D15 C6258. The development will consist of a GAA Cluster Facility including: a) 4 no. floodlit GAA pitches (Pitches No’s 1 to 4) comprising; 1 x synthetic all weather pitch (Pitch No. 2) (145m x 90m with floodlights with a lux level of 350 mounted on 8 no. 20 metre high columns); 2 x sand-based grass pitches (Pitch No’s 3 and 4) (145m x 90m with floodlights with a lux level of 350 mounted on 8 no. 20 metre high columns per pitch);1 x sand-based grass pitch (Pitch No. 1) (145m x 90m with floodlights with a lux level of 500 mounted on 8 no. 30 metre high columns). All pitches will have GAA goal posts and ball stop netting (12m in height and 30m in length) to rear of same, scoreboards and 2 dugouts each, a railing around the perimeter of each of the sand-based pitches and 2.5m sports fencing around the perimeter of the all-weather pitch. The development will also consist of b) the renovation and alteration of the former 2 storey clubhouse (existing area: 678m2) with the alteration of the existing bar area to 2 no. team changing rooms and alteration of existing changing room layouts with new external door access, officials changing room, showers and toilets on the ground floor, retention of existing kitchen facilities, re-purposing of first floor to offices, storage space and team meeting space/multi-purpose room, including removal of external stairs. c) Development of new two-storey extension (area:1,276m2, height: 10.06m) to provide 6 no. team changing rooms, showers and toilets, baths and physio rooms, plant room and toilets for spectators, all on ground floor. Gymnasium, storerooms, office and physio space and team meeting space/multi-purpose room on first floor. New access stairs and lift as well as terrace and green roof and pv solar roof panels. d) the provision of a separate Indoor Training Facility (area: 820m2, height: 7.25m) including a 30m x 20m pitch, team tactics space, toilets, plant room and store for equipment. e) the construction of a Spectator Stand to the east of Pitch No.1 (area: 296m2, height: 7m) to accommodate 500 spectators with partial roof/cover and undercroft equipment store. f) Hurling wall (9m x 9.5m and 5m in height) with fenced in floodlit astro-turf hurling practice area. g) Maintenance and storage building (area: 128m2, height: 4.3m). h) Demolition of existing driving range and pro-shop shed (area: 72m2). In addition the development will include i) a walking/jogging trail with outdoor exercise equipment around perimeter of site, an outdoor training area (30m x 20m) and 100m long speed training area, a new access roadway and pedestrian entrance onto Ratoath Road, 3 no. pedestrian/cycle access gates to adjacent lands to south-east. Car Parking for 54 no. standard car parking spaces, 9 no. universal access spaces and 100 no. overflow spaces for intermittent use with a grasscrete finish, 2 no. coach spaces and bicycle stands for the parking of 100 no. bicycles. j) Earthworks drainage infrastructure and attenuation, an ESB substation (area: 42m2) and switch room, retaining structures, signage, landscaping and all other associated site development works above and below ground level. AI Received 24/10/2022

Townlands of Hollystown and Yellow Walls, On part of the former HollysFingal County CouncilPermission0 reasons0 conditions1.5 km away
Granted17 November 2022
FW24A/0112

Construction of a 34 sq/m extension,

13 Hollywoodrath Close, Hollywoodrath, Dublin 15, D15HK3VFingal County CouncilPermission0 reasons0 conditions1.5 km away
Granted08 May 2024
FW20A/0197

Planning permission for alterations to the residental scheme permitted under Reg. Ref FW14A/0108, as amended by Reg. Ref: FW16A/0099 Reg. Ref FW16A/0148, Reg. Ref: fw17a/0016 and Reg. Ref FW18A/0132 (as extended) on site at Hollywoodrath, Hollystown, Dublin 15. The site is located on the southern side of the junction of the Ratoath Road and the R121 ( Church Road) and to the north of the M2/N3 link road. The proposed alterations relate to permitted House No's 3-8 and 9-14 Hollywoodrath Meadows (located in the eastern section of the site, i.e. Phase 3) and consist of the following: Alterations to permitted House No's 3-8 and 9-14 Hollywoodrath Meadows to provide for a change of house type from 11 no. House Type G2 and 1 no. House Type G2 (i) (both 2 storey end terrace / terrace, 3 - bedroom houses) to 11 no House Type B8B and 1 no. House Type B3B (2 storey end-terrace/ terrace, 3-bedroom houses). The alterations result in the creation of four terrace block 3 units each. The proposal includes associated sitting, boundary changes, boundary treatment and infrastructural works within the area of the proposed alterations.

Hollywoodrath, Hollystown, Dublin 15. The site is located on the southFingal County CouncilPermission0 reasons0 conditions1.5 km away
Granted28 January 2021
FW20B/0146

Second floor attic conversion to habitable space, to facilitate bedroom, ensuite and dressing room. Conversion to include two new rooflights on the front elevation, four new rooflights on the rear elevation, one new window on the second floor left side westerly elevation and two windows on the second floor right side easterly elevation.

42 Hollywoodrath Avenue, Hollystown, Dublin 15Fingal County CouncilPermission0 reasons0 conditions1.5 km away
Granted07 January 2021
FW26A/0079E

Retention Planning Permission for single storey cabin to rear garden, single storey pergola outdoor room and 1.8m high fencing to divide garden.

36 Hollywoodrath Avenue, Hollystown, Dublin 15, D15 TXK8Fingal County CouncilRetention0 reasons0 conditions1.5 km away
Refused21 April 2026
FW21B/0085

Permission for conversion of existing attic into a habitable space, to include new bedroom and en-suite and the construction of a single storey unit at the end of rear garden to include new garage/store and home office and all associated wite works.

35 Hollywoodrath Avenue, Hollystown, Dublin 15, D15 WK7FFingal County CouncilPermission0 reasons0 conditions1.5 km away
Granted12 July 2021
Showing 1-50 of 29,632
PreviousPage 1 of 20