Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 228 decisions within 5 km, 1 exact-site or onsite candidate record, and 10 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Carlow County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Carlow County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Carlow County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched2 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 matched10 structured nearby appeal records.
10 matchedNo current-dated citation is loaded for Carlow County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
A 10 year permission for a Battery Energy Storage system. The proposed development will comprise of the following; A Battery Energy Storage System with associated infrastructure including a new internal access road, approximately 50 metres in length to the permitted Garreenleen Solar Farm (Planning Ref. 22163); An approximately 90 metre 33kV double circuit underground cable grid connection to the permitted Bendinstown 110kV Substation (Planning Ref. ABP–313139), to be installed in an excavated trench including underground ducting; Modular office and welfare buildings; Six steel storage containers and all associated site development and reinstatement works. A Natura Impact Statement (NIS) has been prepared and is included with this planning application.
To apply for a 10 year permission for the proposed development of an underground electricity interconnector cable. The proposed development of the underground electricity interconnector cable will comprise 1 no. 33kV triple circuit cable of c.92 metres in length which is to be installed in an excavated trench including underground ducting and all associated site development and reinstatement works. The proposed development represents a minor revision to the approved layout of the solar farm previously permitted under Carlow County Council planning reference 20/143 and An Bord Pleanala Reference 307891-20 comprising the laying of underground cabling in the previously permitted grassed field area. The purpose of the proposed development is to facilitate the interconnection from the permitted solar farm to a 110kV substation which is the subject to the application to An Bord Pleanala (Reference VA01.313139) A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application.
A 5-year permission for temporary development at Bendinstown (townland) in County Carlow. The development will consist of the installation of 3 no. single storey porta cabin units for use as office (2 no.) and storage space (1 no.), 6 no. car parking spaces and all associated site development works. The proposed development will serve the Garreenleen Solar Farm Development (as permitted under Carlow County Council Reference 20/143 / An Bord Pleanála Reference ABP-307891-20). The proposed operational development will be accessed via the L7112 local road via the entrance permitted under An Bord Pleanála Reference ABP-313139-22
A 10 year Planning Permission for a solar farm which will connect to the national grid on lands with a total area of circa 127 hectares, consisting of solar panels on ground mounted frames, 28 No. single storey electrical inverter/transformer stations and associated equipment container, security fencing, satellite communications pole, CCTV, upgrading to existing access tracks and new access tracks, temporary construction compounds, landscaping and all associated ancillary development works. Construction and operational access will be via entrances from the L-7111 and L-7112. The operational lifespan of the solar farm will be 35 years. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application.
For a single storey / part storey & half dwelling, septic tank and percolation area, new vehicular entrance, bored well and all associated site works
For a single storey / part storey & half dwelling, septic tank and percolation area, new vehicular entrance, bored well and all associated site works
The brief summarizes the pattern across all 228 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2560155The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief