Retention permission for 3 Prefabricated buildings consisting of the following: Building No. 1 Use as Play therapy & Counselling unit, Building No. 2. Family Support Unit, Building No. 3. After-schools facility and all associated site works
A 48 sq. metre building used as a childcare facility
Retention permission for unauthorised works to include the construction of a concrete slab to be used as a base for a prefabricated building. 2. Permission for the installation of a prefabricated building on site to be used as an Afterschools facility, and all associated site works
The erection of 1 No. 660kw wind turbine (hub height 45.00m), and the construction of a 25.00 sq.m. electrical sub-station, site access road, and all ancillary works, as per development previously granted by An Bord Pleanala on foot of File Ref. No. PL01.243964(13/322). The planning permission sought shall be for a period of fifteen years from the date of commissioning of the wind turbine which is an amendment to condition No. 2 of previous permission Pl01.243964 authorising ten years from the date of commissioning of the wind turbine
Of 13/322 - the erection of 1 no. 660 kw wind turbine (hub height 45.00m), and the construction of a 25.00 sq.m electrical sub-station, site access road, and all ancillary works
The construction of an outdoor classroom, including all associated site works
The construction of a two-storey dwelling, connections to mains sewerage & water services, new splayed entrance and all associated development works
The construction of 65 number two storey dwellings, comprising of 22 number semi-detached dwellings, 9 blocks of 3 number terraced dwellings and 4 blocks of 4 number terraced dwellings, new splayed vehicular entrance and separate pedestrian access, connection to local watermain, public sewer, and all associated site development works
Proposed extension, single & double story height extension to; front, rear, side façade, new doors & windows, new external insulation & render works
The construction of a detached domestic garage and all associated site works
Permission for development consisting of a single storey extension to side of existing dwelling along with all associated site works
1) Utility extension to the rear, 2) Extension of conservatory to the side, 3) Addition of bedroom window and ensuite window, 4) Garage / Store and all associated site works
Permission to construct 6 no. dwellings consisting of 4 no. 2 bed apartments and 2 no. 1 bed apartments; all in a two storey block; and all associated site works
The construction of a single-storey garden office to the south corner of the site and all associated ancillary works
The demolition of my existing workshop, permission for the construction of a new replacement workshop, and all associated site works
For the re-construction of a section of an existing riverside retaining wall to the Barrow Canal adjacent to junction of R705 and L3044, in the townland of Dunleckny, Bagnelstown. The development will consist of the re-construction of a section of an existing riverside retaining wall, approximately 12m long, which has partially collapsed. The new section of retaining wall shall be constructed in reinforced concrete with stone cladding to match the existing stone retaining wall. An Ecological Impact Assessment and a Natura Impact Statement have also been prepared in respect of the proposed works and submitted with the application.
Permission for the demolition of an existing single storey extension to be replaced with the construction of a dormer type extension to the rear of our dwelling, the construction of a porch to the front elevation of our dwelling, upgrading works to existing entrance and front boundary, retention permission for a domestic garage / store and all associated site works.
(1) the phased demolition of existing school buildings, including the phased decommissioning and removal of existing temporary school accommodation units, (2) the phased construction of a new 1- and 2-storey school building, to cater for a total of 750 no. pupils, with a total gross internal floor area of 7,752m2, incorporating 27no. general classrooms and associated support teaching and tech spaces, a special needs unit, a general purpose/dining hall, a library, offices and meeting rooms, and other ancillary accommodation, and to include photovoltaic panels at roof level, (3) the construction of a new, separate sports hall building with a total gross internal floor area of 1097.9m2, incorporating a multi-use hall and associated changing and equipment storage spaces, a fitness suite, a meditation space, general storage spaces, and other ancillary accommodation, (4) the provision of a new grassed sports playing pitch in the western part of the site, 5no. hard surface ball courts to the north of the new school and sports hall buildings, outdoor seating and breakout areas, a special needs unit garden, a tech yard, an external material and bin store (133m2), a new substation and switchroom (24.5m2), Liquid Petroleum Gas (LPG) and Air Source Heat Pump (ASHP) compounds, hard and soft landscaping with footpaths, public lighting, and all associated boundary treatments, (5) modifications to the existing site entrance arrangements to include a minor realignment of the existing vehicular and pedestrian entrance from the south, and the provision of a new, gated pedestrian access from Eastwood to the north, (6) parking and access arrangements to include modifications to the bus set down areas and to the internal road layout, and parking provision for 87no. cars, inclusive of 5no. disabled spaces and 5no. electric vehicle charge points, 125no. sheltered bicycle stands providing 250no. sheltered bike parking spaces, and 10no. uncovered bicycle stands providing 20no. short stay visitor bike parking spaces, (7) new foul and surface water drainage system works incorporating SUDS measures, attenuation, rainwater harvesting, and all other associated site and development works. A Natura Impact Statement has been prepared in respect of the proposed development
The addition of an entrance door to east elevation of existing dwelling and all associated site development works
For demolition of an existing attached single storey utility/boiler house to the rear of my existing dwelling, construction of a new pitched roof over my existing garage, conversion of my attached garage to habitable use, external alterations, construction of a new single storey extension to the front and rear of my existing dwelling, internal alterations and all associated site works
Permission for a single storey extension to the side of existing dwelling and all associated site development works
The construction of a dormer-style extension to side of existing dwelling, the decommissioning of existing septic tank and installation of new onsite wastewater treatment system with polishing filter, along with all associated site development works
Change of use at ground floor level from existing commercial use to residential use, external alterations to window sizes, connection to all existing on site services and all associated site works
The as-built revision to the front elevation
The construction of a Detached Single-Storey Dwelling, new entrance, connection to mains water & sewerage and all associated ancillary works
To construct a dormer style dwelling house, new site entrance, connect to public sewer and water mains, all ancillary site works and services
The construction of a single storey extension to the side & rear of existing dwelling, demolition of existing flat roof extension, upgrade of wastewater treatment system, new splayed entrance and all associated site development works
For the demolition of existing derelict dwelling and the construction of 4 number two storey terraced dwellings with connection to existing on site services with all ancillary site works. This planning application shall include a Natura Impact Statement (NIS).
Application for extension of duration of planning permission for the refurbishment and re-use of part of Dunleckney Maltings, Bagenalstown, a protected structure. It is proposed to refurbish building 4 (323 sq m) for re-use as an enterprise centre, ancillary to the existing primary industrial use, to include visitor reception, visitor facilities, promotion of industrial building including maltings and brewing. The proposed works will include the removal of the following: modern rainwater goods; upper floor of timber and concrete; timber and metal shutters; blockwork infill to openings, together with all existing building services to Building 4, and modern kiosk and weighbridge. It is proposed to refurbish Building 4 with the installation of insulated composite panel corrugated metal roofing, timber windows to the existing openings and unblocked openings, install a new raised insulated timber floor to the ground level using salvaged boards, form six new openings fitted with glazed doors, install two external ramps and internal ramp and timber decks to the south and west sides, install a mezzanine level, sanitary facilities, kitchen and reception / servery, clad out the existing mass concrete buttresses in brick to match with signage to form main entrance, new paving to the courtyard, installation of new parking facilities for sixteen cars including two accessible spaces, parking for a coach, bicycles, external lighting, bunded oil storage tank behind fencing, new foul drainage underground pump unit and connection into main drainage.
The construction of a proposed single storey sun lounge extension to existing nursing home complex, alterations to provide door access to same and all associated works
See public notices for full description of works
The construction of a Detached Two-Storey Dwelling, connection to mains water & sewerage and all associated site development works
To construct a 1543sqm training all weather artificial turf pitch with surrounding 6.0m fencing and access gates and 4no. 10.0m flood light poles and all associated site works on existing tennis courts
1. erect two of 8.0M height flood light poles to the existing training area and associated works. 2 Erect PV Solar Panels on the roof of existing club house and associated works
To construct bicycle shelter and associated site works
The development will consist of the extension of the operational lifespan of a solar farm permitted by Carlow County Council under Planning Reg. 22/118 from 35 No. years as permitted (by reason of condition No. 3 of permission Planning Reg. 22/118) to 40 No. years.
The proposed works will include a solar farm on an area of approximately 14.16 hectares, comprising photovoltaic panels on ground mounted frames, 4 no. single storey inverter/transformer stations, 1 no. single storey terminal stations, 1 no. single storey electrical switch room, 1 no. storage container, security fencing, CCTV and all associated ancillary development works. Elgin Energy Services Ltd. are applying for the proposed solar farm to have planning permission that is effective for 10 years (and an operation period of 40 years)
Permission for an extension to existing workshop buildings to be constructed in 2 phases
1. Proposed new 10,350m wide vehicle entrance and single storey turnstiles, ticket booth and associated works. 2. Proposed new single storey ladies & gents toilets block and all associated works. 3. Proposed new 329 spectator covered stand and associated works. 4. Proposed surface carparking (93 spaces) and all associated works. 5. Proposed new 1.8m wide pedestrian entrance and close existing pedestrian entrance close to the club house. 6. Demolish existing tractor shed/store.
For a stand-alone studio outbuilding within the grounds of Dunleckney Glebe House ancillary and associated with the residential use of the main building. Dunleckney Glebe House is a protected structure RPS reference CW276
A dormer dwelling house with basement, dormer type garage with link to dwelling house, septic tank and percolation area, together with all associated site and landscaping works. The application includes a Stage 1 Appropriate Assessment Screening for the proposed development
Permission for development which will consist of an upgrade to the existing Bagenalstown Wastewater Treatment Plant (WwTP) to facilitate an increased treatment capacity. The proposed development will include (1) minor works to the existing inlet works, sludge dewatering building, Picket Fence Thickener, and administration building & control room; (2) change of use to 1 no. clarifier tank to a storm holding tank and minor works to same, as well as minor works to the existing storm holding tank and minor works to same, as well as minor works to the existing storm holding tank; (3) 1 no. aerobic reactor and 4 no. air blowers; (4) 1 no. flow diversion chamber and minor works to an existing flow diversion chamber; (5) 1 no. ferric sulphate storage tank with integrated bund and 2 no. chemical dosing pumps; (6) 1 no. MLSS distribution chamber (7) 1 no. RAS/WAS Pumping Station and 2 No. (each) RAS/WAS Pumping Station and 2 No. (each) RAS/WAS pumps (8) 2 no. final clarifier tanks; (9) 1 no. final effluent chamber (10) treated effluent flow meter & bypass (11) standby generator and (12) all ancillary works including pipework, pumps, landscaping and all associated site development and site excavation works above and below ground. A Natura Impact Statement will be submitted to the Planning Authority with the application.
To install 30 KW of roof mounted solar panels on existing roof of canopy attached to the shop front (area of solar panels 127.3 sq.m roof area 173 sq.m) and all associated site works
Permission for the construction of a two storey dwelling, stable building, on-site wastewater treatment system, bored well, splayed entrance and all associated site development works
The construction of a portal frame Grain storage unit and all associated site development works
(a) the change of use for part of existing portal frame building, from recreation centre to light industrial packaging / manufacturing area and visitor area. (b) External and internal alterations to include demolition of existing internal walls and alterations to roof structure and finishes. (c) The construction of an E.S.B. substation to include switch room and all ancillary development works
Development will consist of essential maintenance and repair works to the Barrow Navigation, in accordance with Waterways Ireland’s statutory remit, comprising the following: (i) Bank Revetment & Strengthening Works, (ii) Post-Flood Spot Dredging & Maintenance Dredging, (iii) Back-drain Maintenance, (iv) Small-scale Bank Repair Works, (v) Trackway Surface Upgrade Works, (vi) 10 no. Temporary Construction Compounds, (vii) Temporary mobile welfare units, and, (viii) All works ancillary and incidental to the maintenance and repair works referred to above. A Natura Impact Statement (NIS) has been prepared in respect of the planning application and will be submitted with the planning application
The installation of solar photovoltaic panels mounted to roof of existing portal frame building and all associated site works
For (a) the erection of 3 no. water tanks having maximum height of 12 meters above ground level. (b) the relocation of 2 no. existing grain silos and all associated site works
The construction of a portal frame light industrial storage unit and all associated site development works