The development will principally comprise the construction of a two storey warehouse unit with ancillary office and staff facilities and associated development as well as a single storey garage. The warehouse unit will have a maximum height of 14.78 metres with a gross floor area of 1,996 sq m including warehouse area (1,670 sq m), ancillary staff facilities (184 sq m) and ancillary office area (142 sq m). The garage will have a maximum height of 14.358 metres and a gross floor area of 500sq m. The development will also include: a vehicular and a pedestrian entrance located at the northeast of the site from the internal Stephenstown Industrial Estate road and a separate HGV entrance located at the southeast of the site from the internal Stephenstown Industrial Estate road; 20 No. ancillary car parking spaces (including EV parking spaces and accessible parking spaces); covered bicycle parking spaces; a trailer/truck wash area; a HGV refuel area; HGV yard; dedicated HGV parking spaces; 4 No. level access goods doors; 4 No. dock levellers; canopies; access gates; signage; hard and soft landscaping; lighting; boundary treatments; plant; and all associated site development works above and below ground. Mainshore Limited trading as Jones International Transport Limited intend to apply for permission for development at this c. 1-459 Ha (14,594 sq m) site at Stephenstown Industrial Estate (alternatively known as 'Stephenstown Industrial Park'), Stephenstown, Balbriggan, Co. Dublin. The site is bounded to the north by greenfield lands (with the L1360 beyond), to the east by an internal access road with in Stephenstown Industrial Estate (with Units 6 & 7 Stephenstown Industrial Estate beyond), to the south by a warehouse and yard currently in use by S. Duffy Plant Hire Ltd., and to the west by Folkstown Lane. AI received 30/01/23
Planning permission is sought for raised roof height
Planning permission for 1. Attic conversion with dormer to rear roof to accommodate attic stairs to allow conversion into non habitable storage, roof windows to front. 2 Single storey extension to side and front of existing house to create a bedroom and wetroom all with associated ancillary works.
Development consisting of a three-sided open-fronted plant storage shed and all associated site development works to existing industrial workshop and ancillary offices. AI received 19/11/21
Permission for alterations at extension of existing industrial workshop and ancillary offices and all associated site development works.
Retention Permission for internal modifications/alterations to the unit including a new internal staircase and the construction of a mezzanine level for storage and display purposes associated with the permitted use of the unit.
Permission for the partial demolition of the existing derelict structures to the rear of Bedford House, partial removal of the site boundary wall and creation of new public plaza, renovation of remaining existing derelict buildings and construction of a new three storey music school and auditorium as part of a new campus. The application also includes development at Rosscarrig, a protected structure consisting of a change of use to a commercial building, the replacement of an existing boiler house annex with a two-storey extension, a one storey ground floor extension to the rear elevation and 9 additional parking spaces. Add Info received 27th July 2020. Add Info deemed Significant 4th August 2020. Revised Public Notices received 11th August 2020.
The development consists of the construction of additional floor space to Mezzanine floor area, including all associated site and ancillary works at this address in accordance with the drawings as submitted.
Retention of a single-storey building to the rear of existing two-storey building (Sunshine House) for use as educational/recreational activities, ancillary to the main building use and to include use as a Montessori/Pre-School between the hours of 9.00 a.m. and 12.30 p.m. Monday - Friday.
Planning permission is requested for a) an increase in capacity of existing preschool from 33 children up to 44 children. B) Extended opening hours to operate from 9.00am - 5.00pm to allow for morning and afternoon sessions. C) 1 no. additional staff car parking space. AI received 26/07/23
Construction of a new single storey 4 bedroom detached dwelling (122 sq.m) to the rear of the site, shall include 1 new roof light, with new vehicular entrance exiting onto Hamlet Lane, development shall include boundary treatments and associated site works. AI received 30/03/21 AI deemed significant 31/03/21 Revised notices received 08/04/21 CAI received 11/05/21 CAI deemed significant SCAI received 02/06/21
The development will consist of the refurbishment and change of use of the ground floor from commercial and religious uses to community facility providing day services to adults with disabilities. The works will include modifications and upgrades to the north and south facades, installation of access ramp to the entrance on Hampton Street, provision of a set-down parking bay at the rear laneway and all associated site works and services. Additional information received 07/08/25
Planning permission is requested for internal alterations and extensions to front and rear and to expand offering of childcare to provide both sessional and full-time day care in line with relevant guidelines along with associated site works. AI Rcvd 17/04/24
Development at the rear of Roscarrig, which is a Protected Structure. The development consists of the installation of a two-storey external glazed service lift at the end of the coach house return. AI received 08/04/21
We, North & East Housing Association, intend to apply for: permission, for the development at this site address: Marian House, Loreto Convent, Convent Lane, Balbriggan, Co. Dublin. The development will consist of: the alteration to, and extension of, 'Marian House', a Protected Structure, to provide a total of 24no. older person housing units comprising 18no. one-bedroom and 6no. two-bedroom apartments, a shared amenity space, and associated siteworks. The development includes construction of a new 4-storey building to the south of the existing structure providing 15no. deck accessed and own-door units, and renovation of the protected structure to accommodate 9no. own-door and apartment units, plus a shared amenity space. Works include demolition and removal of; a 1980's ground floor extension to the east of Marian House; an external fire escape stairs; plant equipment incl redundant oil tanks; the existing vehicular entrance and a section of wall on Convent lane; the boundary wall to the north of the site; and walls within the site. Landscaping works include the provision of 12no. car parking spaces, 1no. motorcycle space, 32 bicycle spaces, bicycle and refuse stores, a community garden, and all associated site development works. Proposed Works to Marian House include; Alterations to windows openings to the front and rear facades; replacement of selected windows with new windows / doors; installation of new balconies to the front façade; formation of new openings from the existing stairs for connection to the proposed lift core. Internally; removal of the suspended timber ground floor for new concrete; insertion of a new interim floor between ground and first; alterations to walls and floor for new layouts; new breathable insulation to interior of external walls; installation of new services throughout; and repair to existing built fabric including roofs, external wall, windows, doors and site features. AA and EIA screening reports have been prepared. Additional Information Received 17/12/2025
Temporary planning permission for single storey kiosk in the curtiage of Balbriggan Railway Station a protected structure.
A Retention Planning Permission (temporary) is sought for a single-storey coffee kiosk in the curtilage of Balbriggan Railway Station a protected structure.
Retention permission for attic conversion to non habitable storage space (17.9 sqm), attic dormer window to rear elevation. 'Velux' type roof window to side elevation, single storey shed to rear garden (30.75sqm) and all associated site work.
1. The development will consist of a distillery (total floor area of floor area 5659m2) which includes provision of an ancillary visitor centre, storage shed along with associated external plant cooling tower and ancillary equipment to include water storage tanks, gas tanks along with signage on the buildings. 2. The development will consist of 7 no. separate buildings (total floor areas of 7892m2) for light industrial and warehouse uses each with associated offices, showrooms, signage, access roads, turning/loading areas, footways, storage areas, parking, electric vehicle charge points, landscaping, lighting, fencing, bicycle and bin storage facilities and associated site works. 3. The demolition of existing agricultural sheds and outbuildings associated with Harvest Lodge along with the refurbishment and change of use of Harvest Lodge to a campus management building along with provision of an associated campus maintenance office and associated parking. 4.The provision of a new site entrance with associated works to facilitate vehicular and pedestrian access. 5. The provision of a business park entrance sign along with perimeter fencing and security gates. 6. A proposed on-site pumping station and rising main which will discharge all treated wastewater effluent from the site to the existing public foul sewerage system. 7. Provision of associated on-line surface water attenuation ponds and attenuation as part of the surface water system. 8. All ancillary site development, landscaping and construction works to facilitate foul, water and service networks to include provision of an ESB substation. AI receievd 01/12/2022 SAI Received 01/12/2022
The development will consist of family flat extension to rear of existing bungalow dwelling. Conversion of existing single dwelling to dormer dwelling with first floor living space over entire proposed structure and all associated site works. AI received 23/09/21
The development will consist of the construction of 197 no. dwellings,open space, and ancillary infrastructure will facilitate Phase 4 of the lands at Ladywell in Balbriggan as follows: A) 129 no. terraced and semi-detached houses comprising 55 no. 2-bedroom houses (2 storey), 67 no. 3-bedroom houses (2 storey) and 7 no. 4-bedroom houses (3 storey) [house types with variants]; B) 18 no. terraced and semi-detached 3 bedroom townhouse dwellings; 18 no. Later Living Units (8 no. 1 bedroom & 10 no. 2 bedroom - all bungalows) [house types with variants]; C) 12 no. 1 bedroom Maisonettes in 6 no. 2-storey semi-detached buildings, and 4 no. 1 bedroom apartments in a 3-storey building (all apartments with terraces) along with 1 no. retail/café unit (c.165 sq. m) and 1 no. retail/medical unit (c. 185 sq. m) [including 'back of house area' & both units to be able to be sub-divided and amalgamated]; D) 16 no. duplex apartments (comprising 8 no. 1 bedroom [with terrace] and 8 no. 3 bedroom units) in 4 no. 3 storey buildings; E) Public open space c.0.85 hectares (with an additional c.0.76 hectares of riparian corridor open space), hard and soft landscaping (including public lighting & boundary treatment) and communal/semi-private open space (c. 660 sq. m) for the proposed townhouse, duplex and apartment units; F) Vehicular access will be provided via the Boulevard Road along with the provision of car parking spaces (280 no.), bicycle parking spaces and all internal roads and footpaths and bicycle and bin stores; G) Provision of surface water attenuation measures, (including widening of Clonard Brook), connection to water supply, provision of foul drainage infrastructure to Irish Water specifications and all ancillary site development, construction, and landscaping works [and temporary construction access from local road L1130]; H) The proposal will also amend the layout to elements of the shared layout across the permitted phases to include (Phase 3A [F21A/0055;ABP Ref:312048-21] relating to 29 no. dwellings replaced with 26 no. dwellings, Phase 3B [F22A/0526] relating to layout and Phase 3C [F22A/0670] relating to 3 no. dwellings replaced with 4 no. dwellings and associated amendments to attenuation (Clonard stream) and services. I) Provision of signalised upgrade of the junction of Boulevard Road and the Clonard Road (R122). An Environmental Impact Assessment Report and a Natura Impact Statement have been prepared in respect of the proposed development and submitted with this LRD application. A dedicated website has been set up for the LRD application which can be viewed at https://folkstownlrd.ie/ AI received 09/10/24
Planning permission is requested for retention of
The development will consist of: a planning permission for a change of use from Retail to a Community Centre including all associated site works. Additional Information Received 27/01/2026
The Development will consist of: The construction of a 4 storey building with part 3 storey building with roof garden. A) Two no. Commercial units at ground floor level, with bin and bike stores at ground floor level. B) 12 no. Apartments (5 no. two bed units, 6 no. one bed units, 1 no. 3 bed unit) connection to public foul, water and surface water sewer. C) Associated landscaping works including dedicated area for public art space, boundary walls and all associated site works.
The development will consist of: (a) amendments to condition no.3 in Planning Grant Reference F17A/0298 to include; (b) the increase in child numbers to be accommodated at any one time in the Childcare Facility from a maximum of 46 children to a maximum of 54 children. Additional Information received 10/09/25
The Development will consist
Permission for construction of a 3 Storey Building with Roof Garden level. The development will consist of A. Ground floor creche and medical centre (3 consultants offices) B. First floor apartments (6 no. two bedroom units), one office suite C. Second floor apartments (4 no. two bedroom units) D. Roof level garden connection to public foul, water and surface water sewer, bike and bin store, landscaping, boundary walls and all associated site works. AI received 15/05/23 SAI received 25/05/23
Located North of Colaiste Ghlor na Mara and overlapping with Phase 2A & 2B off the Taylor Hill development (constructed / in construction), bounded generally by Taylor Hill Grange to the North, Taylor Hill Way to the South & Boulevard Road to the West and on a site to the East at Taylor Hill Wood (relating to works to enhance the existing detention basin). Planning Permission for development on 2 no. parcels of land (c.1.26 Ha.) relating to: 'Phase 2D' The proposal includes a portion of the site boundary of Planning Reg. Ref. F15A/0550 (amended by Planning Reg. Ref. F19A/0001) at Phase 2B of the Taylor Hill development (currently under construction). The development will consist of alterations and extension of site boundaries to Planning Reg. Ref. F15A/0550 (amended by Planning Reg. Ref. F19A/0001) to provide for: The construction of 32 no. 2-storey dwellings, comprising 5 no. 2-bed (House Types E & L), 15 no. 3-bed (House Types D, K/K1 & F/F1/F2/F3) and 12 no. 3-bed dwellings with 4-bed option including dormer at 2nd floor level (House Types B & B1) with associated car parking and private open spaces; stone entrance wall and pier with capping to match existing on North side of Taylor Hill Grange; new access road linking Taylor Hill Grange with Taylor Hill Way; an enlarged (to comprise a 2-storey) crèche extending to c. 1,025 sw. m (345 sq. m permitted) with associated 5 no. car parking spaces and set down area; landscaping; associated infrastructure and site development works, including enhanced detention basin on a separate parcel of land to the East at Taylor Hill Wood. The proposals comprise an additional phase to Planning Reg. Ref. F15A/0550, contributing to a total of 248 no. dwellings for Phase 2 A-D inclusive. Add Info received 1st May 2020. Clarification of Add Info received 12th June 2020.
The development will consist of demolishing existing extension & shed to rear of the existing house to make way for a new ground & first floor extension and all ancillary works,
The construction of a new above ground Motor Control Centre (MCC) kiosk (24m3) and associated ancillary works within existing Quay street Waste Water Pumping station (WwPS).
Planning permission is requested for a new detached dormer bungalow to rear of existing dwellinghouse along with all associated site works to include new boundary treatment and new vehicular access.
Retention of a change of use from retail to a shop for the sale of hot food (pizza) as well as cold non-alcoholic drinks and desserts, mainly for home delivery, with ancillary customer collection. The application also includes the retention of one externally-illuminated fascia / shopfront sign. AI Rcvd 19/11/2024
Permission to extend the existing house to the front at ground floor level incorporating a first-floor balcony above, to enlarge and relocate the existing window openings in the front facade, to include new windows in the western facade, to demolish the existing chimneys on the western facade and to construct a new boundary wall along the western side of the existing house.
The development on land within the car park of Ardgillan Community College, Castleland, Balbriggan, Co Dublin. the development will consist of the installation of an aircraft noise monitoring terminal on a standalone, tiltable mast structure (6m in height) along with associated works including electricity connection. AI received 13/07/23
(i) Construction of a two-storey, with single storey element to rear, flat-roofed building to accommodate 1 no. one-bedroom apartment and 1 no. two-bedroom apartment at ground floor level (each served by private garden to rear) and 1 no. three-bedroom apartment at first floor level (served by 2 no. balconies located on the north-west and south-west elevations); (ii) Provision of new shared vehicular & pedestrian accesses off Barnwall Court, 4 no. car parking spaces and 4 no. cycle parking spaces; and, (iii) Landscaping, boundary treatment, SuDS water drainage and all ancillary works necessary to facilitate the development.
The proposed development will consist of the installation of a pedestrian access gate to the western boundary of the house.
Permission is sought for a) new front porch extension
Changes to previously granted Planning Permission F19A/0361 for the installation of a single storey prefabricated temporary accommodation building. The proposed changes to comprise the addition of a second storey containing 4 no. general classrooms, sanitary facilities, internal accommodation stairs and external fire escape stairs, along with changes to the proposed elevations.
Permission for remediation of the eastern wing of the existing school, which extends over three floors, comprising replacement of its existing external walls, windows and doors, and the reconfiguration of its entrance, construction of a new single- storey extension to the construction studies room on the north side of the ground floor, measuring 21 m2, and associated site works.
Construction of a new single storey flat roof extension, with balcony, to the front elevation of the existing residential property including all associated site works. The extension will comprise of 27.6m². AI received 30/09/21 AI deemed significant Revised public notices (SAI) received 15/11/21
Retain porch to the front, garage to the side, original ground level shed converted to habitable space, first floor extension to the side and sun room to the rear.
Construction of a new single storey flat roof extension with balcony to the front elevation of the existing residential property, including all associated site works. The extension will comprise of 27.6m2, glazing to the balcony will be opaque to the side elevations with clear glazing to the front.
Retention permission for a single storey extension to the rear of the existing property at 4 Seabanks Road, Bath Road, Balbriggan, Co Dublin K32 VK22. The extension is in residential use and comprises of 20 sqm.
The development will consist of Phase 3A as well as roads, services and public space relating to the overall Phase 3 Ladywell Masterplan lands as follows: A) 99 no. dwellings comprising 73 no. 2-storey houses consisting of 24 no. 2 bedroom dwellings [House Types E1, E2, E3, E4), 44 no. 3 bedroom dwellings (House Types B1, B2,B3, D1, D3, F1, F2, F3, F4, F5] & 5 no. 4 bedroom dwellings [House Types M1 & M2]), all with private open space; 16 no. duplex apartments (8 no. 2 bedroom [Types X1, X3] and 8 no. 3 bedroom units [Types X2, X4) in a 3 storey duplex building (including terraces at first floor level, single storey refuse storage building and cycle parking); 6 no. 1 bedroom 'triplex' apartments [Types T1, T2, T3] with balconies at first and second storey levels in 2 no. 3 storey buildings along with a single storey bicycle store & 4 no. 1 bedroom 'maisonette' apartments in 2 no 2 storey buildings (Types P1 & P2]) & bin stores as well as 172 no. car parking spaces; B) Public Open Space of c. 1 hectare, (with additional 0.27 hectares of open space along riparian corridor) as well as communal and private open space; all associated landscaping and drainage works (including attenuation) with public lighting, planting and boundary treatments, including regrading/re-profiling of site (and ditches] where required; C) Provision of Class 1 Public Open Space (c. 0.65 hectares), with play equipment (accessed from Hamlet Lane) located to the west of Bremore Pastures and Hastings Lawn, south of Flemington Lane, (proposal includes alterations to part of the Class 1 public park and associated works approved under Reg. Ref. F15A/0550]; D) Provision of roads and services infrastructure (surface water, foul and water supply) to facilitate the future development of Phase 3 lands (Phases 3B-3D) including public lighting, Suds drainage and services infrastructure, as well as vehicular and pedestrian connections to the 'Boulevard Road' and all associated landscaping and ancillary site development works; E) Signalised upgrade of the junction of Boulevard Road and the Clonard Road (R122) as well as pedestrian crossings along Boulevard Road; An Environmental Impact Assessment Report (EIAR) will be submitted to the Planning Authority with the application. The EIAR is available for inspection or purchase. AI received 14/07/21 AI deemed significant 19/07/21 Revised Public Notices (SAI) received 21/07/21 CAI received 06/10/21
Demolition of existing garage including foundations; External insulation to the front elevation; Construction of a new two storey extension to the existing dwelling, to include a kitchen/dining/utility area on the ground floor and a bedroom/en-suite on the first floor; Minor alterations to the internal layout of the ground floor; Replacement of existing windows and doors; New side entrance gate and associated works. AI Received 17/09/2025
Permission for the demolition of existing house, revised vehicular entrance location and construction of an apartment development comprising 28 no. residential apartments arranged in 2 no. buildings ranging 4-5 storeys in height (total 2,742 sqm Gross Floor Area), all at a site of approximately 0.2773 hectares. The proposed development consists of: (a) 1 no. three-bedroom apartment (b) 20 no. two-bedroom apartments (c) 6 no. one bedroom apartments Block A contains 13 apartments; 1 no. 3 bedroom apartments, 9 no. two bedroom apartments and 3 no. one bedroom apartments. Block B contains 15 apartments; 11 no. two bedroom apartments and 4 no. one bedroom apartments. 28 vehicular parking spaces together with 44 no. bicycle parking spaces are proposed. Private and common open spaces, hard and soft landscaping, roads and pedestrian walkways, services (incl. SUDS), site lighting, solar panel arrays, and all other ancillary and associated site development works above and below ground level.
Retention is sought for as-constructed external stairs & balconies to front of duplex apartments, these were required in order to comply with Part B of the Building Regulations & revised car parking & associated siteworks
Planning permission is sought for alterations to approved plans (F23A/0114). Alterations are for 3 No. external stairs & balconies to front of duplex apartments (these are required in order to comply with Part B of the Building Regulations), minor internal & elevational changes, revised car parking & associated siteworks
The proposed development will consist of the following:
1. Amalgamation of ground floor level of unit nos. 12 & 13 to form a single retail food store unit (204sqm). 2. removal of internal wall to facilitate the amalgamation. 3. and all ancillary works necessary to facilitate development.