The development is comprised of a single storey extension to the rear, two storey extension to side, energy upgrade and modifications to existing structure and all ancillary works
Demolition of existing two storey dwelling of 'Bulmer' and associated outbuildings and demolition of the existing single storey house of 'Little Acre' and its associated garage and other buildings; demolition of single storey stable building on the overall site; construction of 2 two storey Information Communication Technology (ICT) facilities each with three storey plant levels and associated ancillary development which will have a gross floor area of 30,518sq.m on an overall site of 8.2 hectares; 1 two storey ICT facility (building A) will be located to the south-east of the site and will have a gross floor area of 15,196sq.m including 18 emergency generators located at ground and first floor level within a compound to the north-eastern side of the ICT facility with associated flues that will be 25m in height and will be grouped in four groups of four and 1 group of two flues (18 flues overall); 1 two storey ICT facility (building B) will be located to the north-west of Building A and centrally within the overall site and will have a gross floor area of 15,196sq.m including 18 emergency generators located at ground and first floor level within a compound to the north-eastern side of the ICT facility with associated flues that will be 25m in height and will be grouped in four groups of four and 1 group of two flues (18 flues overall); each of the two ICT facilities will include data storage rooms, associated electrical and mechanical plant rooms, loading bays, maintenance and storage spaces, office administration areas; 2 pump rooms of 25sq.m each (4 overall - 100sq.m) plus water storage tanks and plant as well as a separate house generator that will provide emergency power to the admin and ancillary spaces; each generator will also include a diesel belly tank with a single refuelling area to serve the proposed emergency generators; 1 temporary and single storey substation (26sq.m); ancillary site development works including attenuation ponds and the installation and connection to the underground foul and storm water drainage network and installation of utility ducts and cables; other ancillary site development works will include hard and soft landscaping throughout the site, lighting, fencing, signage, central services road, security gate, sprinkler tank house and 80 car parking spaces and 17 sheltered bicycle parking spaces; the development will be enclosed with landscaping to all frontages including a wetland to the south-east and will be accessed from the Peamount Road (R120) located within the townland of Milltown on lands that contain the 2 residential properties of 'Little Acre' and 'Bulmer' as well as agricultural lands and buildings which are located to the north of the Peamount Road and the lands to the north and within the overall site are subject to a concurrent application for a Power Generation Facility under Reg. SD20A/0058; An Environmental Impact Assessment Report (EIAR) is included with the application.
Demolition of the existing single storey house of 'Little Acre' and its associated garage and other buildings; demolition of the single storey stable building on the overall site; construction of a gas powered Power Plant with all its associated elements; the part single and part two storey property of Bulmer and an agricultural building to the east of the overall site will not be demolished; The Power Plant compound of 14,475sq.m will contain 2 Power Units each with 1 25m height stack (2 overall), transformers, air intakes and electrical modules; the Power Plant compound will also contain a two storey administration and workshop building (427sq.m) and LV switchgear building (140sq.m) (567sq.m in total) plus an AGI connection, gas compressor, water tank, water treatment, firewater tank and pumps, fuel skids, fuel tank and 1 emergency diesel generator; the proposal also includes a battery energy storage system compound of 3,300sq.m containing 15 battery containers and 15 inverters that will be linked to the Power Plant; the development will be accessed from a new vehicular entrance from Peamount Road that will provide access to the Power Plant at the rear of the site; all ancillary site development works, including attenuation pond and dry swales to connect to existing infrastructural services and network as well as fencing, signage, services road entrance gate and 8 car parking spaces; the development will be enclosed with landscaping to all frontages; an EPA-Industrial Emissions Directive (IED) licence will be applied for to facilitate the operation of the proposed development for a period of 10 years on a site of 8.2 hectares on lands that contain the 2 residential properties of 'Little Acre' and 'Bulmer'.
Proposed LED Flood-Lighting System on Grass Pitch consisting of 6 number 20 Metre high columns and all associated ducting, column bases and light fittings
Planning permission for an attic conversion including a change of roof profile from hipped roof profile from hipped roof to a half-hipped gable-ended profile, a rear dormer roof extension, two rooflights to the front elevation, a new window to the gable wall and new internal access stairs and all associated site works
Retention of existing single storey extension at rear.
Change of use of a residential dining area to a kitchen for a home baking business.
The development will consist of sub division of the existing corner house site to allow for construction of a new two storey, 2 bed dwelling with existing access from the road off Beechwood Lawns for car parking, new boundary separation fence and walls, new landscaping, new bin storage, new exterior terrace and all associated ancillary works. The works also include demolition of two existing garden sheds to the existing site to make way for the new dwelling.
Subdivision of the existing corner house site to allow for construction of a new two storey dwelling with new access from the road off Beechwood Lawns for two car parking spaces, new boundary separation fence and walls, new landscaping, new bin storage, new exterior terrace and all associated ancillary works. The existing dwelling rear garden space will be altered as part of the works and shall include demolition of two existing garden sheds to make way for the new dwelling.
Side extension at first floor level to add a bedroom and toilet, and extension of previously approved dormer at attic floor level. Proposed finishes to match and align with existing dwelling inclusive of all associated site works.
Retention of single storey flat roof extension to rear (south west), including kitchen with 2 rooflights, utility room, wc and dining area with sliding door; removal of entrance porch and new front door; change of use from garage to bedroom inclusive of change of garage door to window at front and increased parapet height; single storey blockwork shed with sliding door to rear of the dwelling to be retained inclusive of all associated site works.
Conversion of existing attic to non-habitable storage space; Existing hipped roof to be altered to A frame roof inclusive of a dormer window to the rear of the dwelling all at roof level; Proposed staircase from first floor to attic level; Proposed finishes to match and align with existing dwelling inclusive of all associated site works.
Construction of a new 4 bedroom, detached dormer bungalow; all ancillary site development works.
Construct a new first floor side extension above existing garage together with minor internal alterations and associated site works in order to enable the provision of a new bedroom & bathroom at fist floor level.
Provision of signage on the north, south and west elevations; Provision of a storage yard, access road, mesh fence and walls to the west of Unit G; Additional door to access storage yard on the west elevation and all associated landscaping and ancillary works to facilitate the development.
We DSV Solutions Limited intend to apply for planning permission for the inclusion of a new rear elevation canopy to the existing warehouse facility located at Unit F, Mountpark Baldonnell, Baldonnell Business Park, Dublin 22 as follows: Addition of a canopy structure (157m2, 7,42m high) attached to the rear of existing warehouse unit plus directly associated elevational changes and site works.
Single storey extension to rear, dormer loft extension to attic level to rear with solar panels to roof, two storey extension to side, energy upgrade and modifications to existing structure, rooflight to front roof ancillary works.
Installation of 2No. external non-illuminated lettered signs to the eastern and northern elevations at Unit F, Mountpark Baldonnell.
Installation of 1 no. external air handling unit and associated ductwork to existing Unit F.
Installation of 1 no. external permanent site back up generator to the north of the site.
The development will consist of the omission of a permitted above ground installation (AGI) compound under Reg. Ref.: SD20A/0058, the provision of an AGI at an alternate location within the site, and the provision of a Pressure Reduction Metering System (PRMS) and a foul pumping station, along with road upgrades to the public road (R120 Peamount Road), and provision of a foul sewer connection from the site to the northeast, via Peamount Road and Old Nangor Road. The relocated AGI, PRMS compound, and foul pumping station will be located in the southeastern corner of the site. It is proposed to demolish an existing two storey vacant house (with a gross floor area of 235 sq.m.) to provide for the AGI, PRMS compound, and foul pumping station. The relocated Gas AGI and the PRMS will be located within fenced compounds and will comprise of the following buildings and gas-related infrastructure: - 2 no. AGI buildings comprising AGI Building 1 with a total area of c.18 sq.m and overall height of c. 3.4m and AGI Building 2 with a total area of c. 8 sqm and overall height of c. 3.1m; - A Boiler House Kiosk with a total area of c. 12 sq.m and overall height c. 3.5m and boiler flues with a total height c. 5.4m; - A new E&I Kiosk with a total area of c. 12 sq.m and overall height of c. 2.7m; - A new Control Room with a total area of c. 12 sq.m and overall height of c. 3m; - A new Skid House with a total area of c. 123 sq.m and overall height of c. 3.3m; - The compounds will also accommodate associated valves and pipework. A new foul water pumping station with associated chambers, meters and a 24-hour storage tank will be provided to the east of the AGI and PRMS compounds. The proposed developmbent includes all associated and ancillary works including site lighting, boundary treatments, landscaping, drainage and infrastructure. The proposed development is located within a site subject to an application for an EPA Industrial Emissions (IE) Directive license.
Amend previously permitted application Ref. SD21A/0230 consisting of the installation of two external water tanks and associated concrete slabs, guardrails and access ladders, to the north-east of Units F & G (currently under construction) and all associated landscaping, infrastructure and site development works to facilitate the development.
The Development consists of 1. Single Storey extension to rear of property. 2. First floor Extension to the side of the existing 2 storey house 3. Installation of rooflights to the front and rear planes and construction of gable roof
Permission to raise the roofs of warehouses B3, B4 and B5 (previously known as B, C and D) to match height of adjoining warehouses, (c. 17.2m high), and associated changes, as previously granted, planning permission ref SD07A/8607.
New two storey extension to the side of the driver reception area, (on the Northwest elevation of the Crossdock area), to house additional sanitary facilities, at Dachser Ireland Ltd, Blackchurch Business Park, Rathcoole, Co. Dublin D24 C796
Construction of a detached single storey split level bungalow; single storey domestic garage; upgrade of existing agricultural entrance to vehicular entrance; secondary effluent treatment system and all associated site works.
Construction of a detached, single storey split-level bungalow; single storey domestic garage; upgrade of existing agricultural entrance to vehicular entrance; secondary effluent treatment system and all associated site works.
New primary school (Roll No. 20549P), including 20 classrooms, with a gross floor area of 3,449 sq.m over 3 storeys; The proposed development will also provide a no. multi-purpose hall and all ancillary teacher and pupil facilities; Vehicular, cycle, and pedestrian access to the site is proposed to the north-west of the school, with staff and visitor parking spaces; car and bus drop off and set down facilities and associated set down areas and accessible parking facilities; A secondary, future provision of pedestrian, vehicular and cycle access points are provided to the southern boundary of the site; The development will also include the provision of bicycle and scooter parking; external stores; Internal access roads, cycle and footpaths; hard and soft play areas including 2 ballcourts; piped infrastructure, connections and ducting; external plant area; landscaping and boundary treatments; green roofs, PV panels; 1 ESB substation; EV parking facilities; external courtyards and all hard and soft landscaping; ancillary ramps and stairs; lighting; signage; 3 attenuation tank; SUDs; 3 flagpoles; changes in level and all associated site development and excavation works above and below ground.
The proposals will comprise of amendments to Unit 7 (K78 V6TY) constructed under Reg. Ref.: SD23A/0301 (as amended by Reg. Ref.: SD24A/0224W and SD25A/0011W). The proposed amendments will consist of: • Change of use from logistics/warehousing to logistics/warehousing/light - industry to accommodate a manufacturing use; • Reconfiguration of the layout of the unit resulting a slight increase in the total GFA from 12,650 sqm to 13,333 sqm. The warehouse floor area of the unit will decrease from 11,509 sqm GFA to 10,652 sqm of manufacturing floor area for the new use and the associated office space will increase from 994 sqm to 2,518 sqm; • Amendments to the elevations to accommodate the changes to the layout of the unit; • Provision of a canopy at the entrance of the building on the southern elevation and a new outdoor terrace (c. 110 sqm) to the south of the unit; • Reconfiguration of the car parking spaces to the south of the unit and provision of a new overflow car parking area to the west of the service yard; • A total of 213 no. car parking space will be provided to serve the development; • New entrance to overflow car park from internal link road to the south; • Provision of 10 no. van spaces to the south west corner of the service yard; • Installation of a containerised generator within the service yard area; • Provision of new tenant signage on south elevation: • Relocation of existing signage on the south elevation to the east elevation; • Provision of carpark totem to overflow parking; • Provision of additional PV panels at roof level and; • All associated site development works and landscaping works
Construction of an outdoor all-weather horse arena and a building to contain stables to house horses and to contain farm machinery implements and fodder, also ancillary works (i.e concrete yards, gates and boundaries), also all for agricultural purposes only in new farmyard using existing farm & road entrances.
Permission for demolition off existing single storey garage and the construction of a new two storey extension to the side of the existing house and single storey extension to the rear of the house with all assocciated works.
Demolition of 1 residential property and 1 ancillary outbuilding. Construction of a residential development of 42 three-bedroom dwellings in a mix of terraced and semi-detached units. The proposed will comprise of 2 typologies: typology F (21 dwellings) and typology L (21 dwellings) both 2 storey with typology F having a 2nd floor loft accommodation with front dormer windows. Total residential gross floorspace is 5622sqm. Development includes 84 in curtilage surface car parking spaces (3281sqm). Public open spaces in an eastern park and a western park (including proposed play equipment), an additional large parkland to the south of the site (11797sqm) comprising the first phase of linear park. Private domestic gardens. A new vehicular, pedestrian and cycle entrance from Stoney Hill road. An internal road network, including footpaths/cycleways. 3 refuse/bin stores, public lighting, landscaping, boundary treatments, drainage and engineering works and all other associated and ancillary development works.
The proposed development will consist of: Reconfiguration of the layout of Unit 5 resulting a slight decrease in the total GFA from 13,348 sqm to 12,650 sqm. The warehouse floor area of the unit will increase from 11,137 sq.m to 11,509 sq.m GFA and the associated office space will decrease from 1,689 sq.m to 994 sq.m; Reconfiguration of the service yard area including: Decreasing the service yard area to the north and west of the Unit 5 building; Relocation/reconfiguration of the service yard entrance; Omission of the permitted outbuildings in the service yard; Provision of updated landscaping with attenuation pond to the north of the building and service yard; Amendments to the western elevation to accommodate the changes to the layout of the unit; Reconfiguration of the bicycle parking area resulting in a reduction from 70 no. spaces to 64 no. spaces; Omission of the permitted tenant signage to Unit 5 and; All associated site development works.
Amendment to previously permitted Ref. SD20A/0215 consisting of signage for Unit E including the provision of, 2 way finding signs located at entrances to Unit E; 2 totem signs located to the west and north of Unit E; 3 halo illuminated signs to the south-western, north-eastern and south-eastern elevations; all associated works.
The construction a logistics/warehouse unit (Unit E) southwest of Mountpark Baldonnell Phase 1 and west of the older original Business Park, Unit E will comprise of a GIA 60,747sq.m (including 2,020sq.m of ancillary office space and 4,802sq.m of other ancillary areas); Provide for 340 car parking spaces, 22 motorcycle parking spaces and 160 bicycle spaces to serves the proposed development; Flood mitigation works to store and attenuate flood flows from the River Camac; Formations of plateaux on the site with surplus excavated material to allow for future development of Unit F; Access to the site will be from the existing Phase 1 development (referenced above) located on Clonlara Road; amendments to the yard and entrance arrangement for permitted Unit D are proposed (SD19A/0048); All ancillary landscaping, internal roads, associated infrastructure and buildings and site development works to support the development which is primarily greenfield and located between Casement Aerodrome and the N7 national route. The proposal will form part of the second phase of development to that permitted under SD19A/0370 and Phase 1 under SD15A/0309 (ABP Ref. PL06S.246392), as amended by permissions SD17A/0362, SD18A/0266 and SD19A/0048. An Environmental Impact Assessment Report (EIAR) will be submitted to the Planning Authority with the planning application.
Construction of two logistics/warehouse units (Unit C & D) southwest of Mountpark Baldonnell Phase 1 and west of the older original Business Park. Unit C will comprise of a GIA 11,492sq.m (including 592sq.m of associated office space); Unit D will comprise of a GIA 7,856sq.m (including 400sq.m of associated office space); provide for 193 car parking spaces and 56 bicycle spaces to serve the proposed development; flood mitigation works to store and attenuate flood flows from the River Camac; formation of plateaus on the site with surplus excavated material to allow for future development; access to the site will be from the existing Phase 1 development located on Clonlara Road; all ancillary landscaping, internal roads, associated infrastructure and site development works to support the development; the site is primarily greenfield and located between Casement Aerodrome and the N7 national route; the proposal will form a second phase of Development to that permitted under SD15A/0309 (ABP Ref. PL06S.246392) as amended by permissions SD17A/0362, SD18A/0266 and SD19A/0048; An Environmental Impact Assessment Report (EIAR) is submitted with the planning application.
3 new buildings. Block A: two storey with six industrial and office units; Block B: two storey with one industrial and office unit; Block C: three storey with ground floor café and office, first floor offices, second floor gym and ancillary areas; new perimeter wall and fence with two revised entrances and gates; surface car parking and all associated site works.
Construction 2 logistics/warehouse units (Unit F and Unit G amounting to 15,168sq.m GIA in total) south west of Mountpark Baldonnell Phase 1 and west of the older original Business Park; Unit F will comprise a GIA 6,463sq.m (including 568sq.m of ancillary office space), 65 car parking spaces and 20 bicycle spaces; Unit G will comprise a GIA 8,705sq.m (including 608sq.m of ancillary office space) 87 car parking spaces and 28 bicycle spaces; flood mitigation measures as permitted under SD20A/0215 and SD20A/0319 will service the development and are under construction; access to the site will be from the existing Phase 1 development (referenced below) located on Clonlara Road; totem wayfinding signage; all ancillary landscaping, PV panels; internal roads, associated infrastructure and buildings and site development works to support the development at the townlands of Moneenalion Commons Upper, Brownsbarn and Collegeland, Baldonnell Business Park, Dublin 22; the site is primarily greenfield and located between Casement Aerodrome and the N7 national route; the proposal will form part of the second phase of development to that permitted under SD20A/0215, SD19A/0370 and Phase 1 under SD15A/0309 (ABP Ref. PL06S.246392), as amended by permissions SD17A/0362, SD18A/0266 SD19A/0048 and SD20A/0319; an Environmental Impact Assessment Report (EIAR) will be submitted to the Planning Authority with the planning application.
Amend permitted logistics/warehouse units C and D and incorporate other amendments, providing for a resultant; Unit C, 7,937sq.m including 757sq.m ancillary office space (permitted 11,492sq.m total); Unit D, 12,050sq.m including 911sq.m ancillary office space (permitted 7, 856sqm total); Overall increase of 639sq.m for Units C and D; provision of maintenance ramp to swale; resultant amendments to site layout, minor revisions to flood mitigation strategy, yards, elevations, signage, internal road layout, landscaping, ground works, drainage, gates, fencing, services and utilities and all associated and ancillary site development works at a site at the townlands of Moneenalion Commons Upper, Brownsbarn and Collegeland, Baldonnell Business Park and is located between the Casement Aerodrome and the N7 national route and comprising of amendments to the second phase of development permitted under Ref. SD19A/0370 & SD20A/0215.
(1) Demolition of 5 no. existing dwellings and associated outbuildings on the site. (2) Construction of a 176 no. dwellings on the site to the east of Stoney Hill Road comprising 100 no. duplex units and 76 no. houses and with a mix comprising of 16 no. 1 beds, 50 no. 2 beds, 70 no. 3 beds and 40 no. 4 beds with detached, semi-detached and terraced units. The house types include two storey and three storey typologies and the duplex units are three storeys in height. (3) A total of 245 no. surface car parking spaces for the residential development (including visitor, accessible and EV charging spaces) comprising of 152 no. for the 76 no. houses and 93 no. for the 100 no. duplex units. (4) Bicycle parking comprising of 187 no spaces in total (including 3 no. cargo bicycle spaces) in sheltered bicycle stores. (5) Open space comprising of: a) 8,725 sq.m of public open space, including the main park and pocket parks. b) 2,680 sq.m of communal open space, including 100 sq.m of play to serve the duplex units, c) 4,311 sq.m of ecological open space, including landscape buffers. (6) A new vehicular, pedestrian and cyclist access from Stoney Hill Road to the north-west of the residential development site and a secondary access for emergency vehicles only further to the south on Stoney Hill Road. (7) A 2 no. storey creche building of 639.2 sq.m plus an outdoor play area of 591 sq.m located on an existing undeveloped portion of the Peyton site located to the west of Stoney Hill Road. The creche includes 10 no. car parking spaces and 20 no. bicycle parking spaces. The crèche development includes all associated and ancillary works. (8) Infrastructure works to serve the proposed development to include the internal road network, ESB substations/switchrooms, lighting, site drainage works, hard and soft landscaping, boundary treatment, and all ancillary site services and development works above and below ground. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development and is submitted as part of the planning application.
The construction of a split level single storey dwelling (199 sq.m.) with a detached garage (40 sq.m.), an on-site proprietary waste water treatment plant and percolation area, modifications to existing agricultural entrance at the L2019 to access the proposed dwelling and all ancillary site development works
Canopy waste compactor/baler on south western elevation and all associated site works on a site under construction and located between Casement Aerodrome and the N7 national route. The proposal amends a previously permitted development under SDCC Reg. Ref. SD20A/0215.
Signage for Unit E including the provision of 1 halo illuminated sign to the north eastern elevation; and all associated works. (Development site at Unit E in the townland of Collegeland, Baldonnel Business Park, Dublin 22; the site is under construction and located between Casement Aerodrome and the N7 national route)
Amendments and modifications to the permitted data centre development granted under Reg. Ref. SD18A/0134 - ABP Ref. ABP-302813-18 and the temporary substation permission granted under SD19A/0300 to include: Demolition of the two storey dwelling of Weston House; single storey dwelling and outbuildings/ stables of Weston Lodge; and the single storey dwelling and converted garage of Kent Cottage. Retention of sprinkler tank and pump house to the south-west of Building A Data Centre to replace 4 sprinkler tanks; Retention of 40kW(p) PV panels on the roof of Building A Data Centre; Retention of revised size of northern attenuation pond and loss of permitted landscaping to its south; Retention of ramped access to rear of temporary substation permitted under SD19A/0300; Retention of revised flue arrangement for Building A Data Centre from 2 associated flues per generator to 1 associated flue per generator (16 in total) and grouped into 8 towers of two flues each (each 20m high); Retention of revised position of security fence to north, west and south of Building A Data Centre; and retention and modifications of landscape berm along Baldonnel Road and to east of Weston House. Development will consist of new works to include: Modifications of permitted vehicular entrance to the data centre to include a new single storey guard house (37sq.m) and two internal entrance gates; Modification to car parking so that the permitted entrance to the parking area from the east is closed off; Modifications of flue arrangement for Building B Data Centre from 2 associated flues per generator to 1 associated flue per generator (16 in total) and grouped into 8 towers of two flues each (each 20m high); Modifications to permitted landscape scheme to north and south of Building A Data Centre; Removal of roadside entrance to Erganagh House (demolished), Kent Cottage, and the former scaffolding yard; and removal of roadside entrance to Weston House and its replacement with a new agricultural gate and fence to be erected to facilitate access for maintenance and security purposes only all on a site of 9.7Ha located within lands in the Grange Castle South Business Park and the residential properties of Weston House, Kent Cottage and Weston Lodge as well as the former scaffolding yard on land within the townlands of Aungierstown and Ballybane; Ballybane; and Milltown and bounding Baldonnel Road to the west and south and Grange Castle South access road to the north, Baldonnel, Dublin 22.
Amendments and modifications to the permitted data centre development granted under Reg. Ref. SD18A/0134 - ABP Ref. ABP-302813-18 and the temporary substation permission granted under SD19A/0300 to include: Demolition of the two storey dwelling of Weston House; single storey dwelling and outbuildings/ stables of Weston Lodge; and the single storey dwelling and converted garage of Kent Cottage. Retention of sprinkler tank and pump house to the south-west of Building A Data Centre to replace 4 sprinkler tanks; Retention of 40kW(p) PV panels on the roof of Building A Data Centre; Retention of revised size of northern attenuation pond and loss of permitted landscaping to its south; Retention of ramped access to rear of temporary substation permitted under SD19A/0300; Retention of revised flue arrangement for Building A Data Centre from 2 associated flues per generator to 1 associated flue per generator (16 in total) and grouped into 8 towers of two flues each (each 20m high); Retention of revised position of security fence to north, west and south of Building A Data Centre; and retention and modifications of landscape berm along Baldonnel Road and to east of Weston House. Development will consist of new works to include: Modifications of permitted vehicular entrance to the data centre to include a new single storey guard house (37sq.m) and two internal entrance gates; Modification to car parking so that the permitted entrance to the parking area from the east is closed off; Modifications of flue arrangement for Building B Data Centre from 2 associated flues per generator to 1 associated flue per generator (16 in total) and grouped into 8 towers of two flues each (each 20m high); Modifications to permitted landscape scheme to north and south of Building A Data Centre; Removal of roadside entrance to Erganagh House (demolished), Kent Cottage, and the former scaffolding yard; and removal of roadside entrance to Weston House and its replacement with a new agricultural gate and fence to be erected to facilitate access for maintenance and security purposes only all on a site of 9.7Ha located within lands in the Grange Castle South Business Park and the residential properties of Weston House, Kent Cottage and Weston Lodge as well as the former scaffolding yard on land within the townlands of Aungierstown and Ballybane; Ballybane; and Milltown and bounding Baldonnel Road to the west and south and Grange Castle South access road to the north, Baldonnel, Dublin 22.
Extension to side of existing dwelling and incorporating existing garage in to proposed extension to form independent living unit. Construct new garage and associated site works
Retain deviations to an approved two storey side extension under Reg. Ref. No. SD20B/0364 as follows: (i) repositioned/enlarged/additional windows to four facades of dwelling, (ii) provision of a non-habitable structural basement plant/storage room under extension, (iii) coloured nap plaster external first floor finish in lieu of steel cladding to dwelling, (iv) minor external alterations, (v) rainwater harvesting tanks and (vi) additional landscape planting and associated site development works.
Demolition of existing granny flat; construction of two storey extension to side of house and installation of new wastewater treatment system.
Demolition of the existing single storey house of 'Erganagh' and the construction of a two storey data centre and delivery bays with associated three storey office block and services that will have a gross floor area of 35,426sq.m on an overall site of 9.2 hectares. The two storey data centre facility and delivery bay (32,419sq.m) will be separated into two adjoined blocks over two floors with a single data hall on each floor of each data centre with service and technical space around each data hall (4 data halls overall) with a two storey delivery bay attached to the east of the data centre block. A three storey office block and delivery bay (2,882sq.m) is attached to the west of the data centre block. The data centre will be served by services and plant to the north of the data centre blocks that will include 32 standby generators with 2 associated flues per generator (64 in total) and grouped into 16 towers of flour flues each (each 20m high). There are proposed to be 32 acoustically attenuated chillers located on the upper level plant gantries to the north of the data hall blocks (eight on each gantry). The development will also include a new substation with associated transformer yard and single storey transformer building (125sq.m) that will be located to the northeast of the site. The development will be accessed from the Grange Castle South Access Road from the north via the Baldonnel Road and will also include ancillary site development works, including 2 attenuation ponds, to connect to existing Grange Castle infrastructural services as well as fencing, signage, services road, entrance gate, 70 car parking spaces including 3 disabled car parking spaces, and 30 sheltered bicycle parking spaces. The development will be enclosed with landscaping to all frontages including a wetland to the west all on a site (9.2ha) located within lands in the Grange Castle Business Park South and the residential properties of Erganagh, Kent Cottage and Weston Lodge on land with the townlands of Aungierstown and Ballybane; Ballybane; and Milltown and bounding Baldonnel Road to the west and south and Grange Castle South Access Road to the north, Baldonnel, Dublin 22. An Environmental Impact Assessment Report (EIAR) has been submitted with this application.
Demolition of the existing single storey house of 'Erganagh' and the construction of a two storey data centre and delivery bays with associated three storey office block and services that will have a gross floor area of 35,426sq.m on an overall site of 9.2 hectares. The two storey data centre facility and delivery bay (32,419sq.m) will be separated into two adjoined blocks over two floors with a single data hall on each floor of each data centre with service and technical space around each data hall (4 data halls overall) with a two storey delivery bay attached to the east of the data centre block. A three storey office block and delivery bay (2,882sq.m) is attached to the west of the data centre block. The data centre will be served by services and plant to the north of the data centre blocks that will include 32 standby generators with 2 associated flues per generator (64 in total) and grouped into 16 towers of flour flues each (each 20m high). There are proposed to be 32 acoustically attenuated chillers located on the upper level plant gantries to the north of the data hall blocks (eight on each gantry). The development will also include a new substation with associated transformer yard and single storey transformer building (125sq.m) that will be located to the northeast of the site. The development will be accessed from the Grange Castle South Access Road from the north via the Baldonnel Road and will also include ancillary site development works, including 2 attenuation ponds, to connect to existing Grange Castle infrastructural services as well as fencing, signage, services road, entrance gate, 70 car parking spaces including 3 disabled car parking spaces, and 30 sheltered bicycle parking spaces. The development will be enclosed with landscaping to all frontages including a wetland to the west all on a site (9.2ha) located within lands in the Grange Castle Business Park South and the residential properties of Erganagh, Kent Cottage and Weston Lodge on land with the townlands of Aungierstown and Ballybane; Ballybane; and Milltown and bounding Baldonnel Road to the west and south and Grange Castle South Access Road to the north, Baldonnel, Dublin 22. An Environmental Impact Assessment Report (EIAR) has been submitted with this application.