The application site comprises an area of c. 0.15 hectares. The proposed development comprises an alteration to planning permission Reg. Ref. SD21A/0241, as amended by Reg Ref SD23A/0035. There is a separate application under consideration under Reg Ref SD23A/0203 for the provision of a temporary medium voltage substation on lands to the southeast of the application site. The proposed development (for which a temporary 3-year permission is sought) will comprise the following: Construction of a temporary power generation compound, comprising 24 no. generators (to be powered by hydrogenated vegetable oil), associated flues (c. 6m in height), 8 no. fuel storage tanks, a switchgear room, control room, spares containers, and ancillary structures, all within a fenced compound; The proposed generators will be enclosed within an acoustic panel enclosure c. 11m in height; The proposed temporary power generation compound will be located on an area for permitted car parking under Ref Ref SD21A/0241, as amended by Reg Ref SD23A/0035, which will be constructed following the removal of the temporary compound; The proposed development includes all associated and ancillary works.
784 photovoltaic panels on the roof of the existing building with all associated site works.
The construction of a 2-storey extension and any associated site works to the south elevation of the existing engineering stores in the administration offices building which comprises of construction of circa 34sq.m area with a maximum height of 9.4m to accommodate two storey units at Grange Castle Business Park, Grange Castle, Dublin 22. The application relates to development which comprises of an activity, which requires an Industrial Emissions Licence in accordance with the First Schedule of the EPA Act 1922 as amended.
The proposals will comprise of amendments to Unit 7 (K78 V6TY) constructed under Reg. Ref.: SD23A/0301 (as amended by Reg. Ref.: SD24A/0224W and SD25A/0011W). The proposed amendments will consist of: • Change of use from logistics/warehousing to logistics/warehousing/light - industry to accommodate a manufacturing use; • Reconfiguration of the layout of the unit resulting a slight increase in the total GFA from 12,650 sqm to 13,333 sqm. The warehouse floor area of the unit will decrease from 11,509 sqm GFA to 10,652 sqm of manufacturing floor area for the new use and the associated office space will increase from 994 sqm to 2,518 sqm; • Amendments to the elevations to accommodate the changes to the layout of the unit; • Provision of a canopy at the entrance of the building on the southern elevation and a new outdoor terrace (c. 110 sqm) to the south of the unit; • Reconfiguration of the car parking spaces to the south of the unit and provision of a new overflow car parking area to the west of the service yard; • A total of 213 no. car parking space will be provided to serve the development; • New entrance to overflow car park from internal link road to the south; • Provision of 10 no. van spaces to the south west corner of the service yard; • Installation of a containerised generator within the service yard area; • Provision of new tenant signage on south elevation: • Relocation of existing signage on the south elevation to the east elevation; • Provision of carpark totem to overflow parking; • Provision of additional PV panels at roof level and; • All associated site development works and landscaping works
The proposed development will consist of: Reconfiguration of the layout of Unit 5 resulting a slight decrease in the total GFA from 13,348 sqm to 12,650 sqm. The warehouse floor area of the unit will increase from 11,137 sq.m to 11,509 sq.m GFA and the associated office space will decrease from 1,689 sq.m to 994 sq.m; Reconfiguration of the service yard area including: Decreasing the service yard area to the north and west of the Unit 5 building; Relocation/reconfiguration of the service yard entrance; Omission of the permitted outbuildings in the service yard; Provision of updated landscaping with attenuation pond to the north of the building and service yard; Amendments to the western elevation to accommodate the changes to the layout of the unit; Reconfiguration of the bicycle parking area resulting in a reduction from 70 no. spaces to 64 no. spaces; Omission of the permitted tenant signage to Unit 5 and; All associated site development works.
Development on a Site that includes a two storey residential property on lands to the south of the New Nangor Road (R134), Dublin 22; and on land within the townlands of Ballybane and Kilbride within Profile Park, Clondalkin, Dublin 22 on an overall site of 3.79hectares; The development will consist of the demolition of the two storey dwelling (207.35sqm) and associated outbuildings and farm structures (348.36sq.m); and the construction of 1 two storey data center with plant at roof level and associated ancillary development that will have a gross floor area of 12,893sqm that will consist of the following, 1 two storey data center (Building 13) with a gross floor area of 12,893sqm. It will include 13 emergency back-up generators of which 12 will be double stacked and one will be single stacked within a compound to the south-western side of the data center with associated flues that each will be 22.316m in height and 7 hot-air exhaust cooling vents that each will be 20.016m In height; The data center will include data storage rooms, associated electrical and mechanical plant rooms, loading bays, maintenance and storage spaces, office administration areas, and plant including PV panels at roof level as well as a separate house generator that will provide emergency power to the admin and ancillary spaces. Each generator will include a diesel tank and there will be a refuelling area to serve the proposed emergency generators; The data center will have a primary parapet height of 14.246m above ground level, with plant and screen around plus a plant room above at roof level. The plant room has an overall height of 21.571m; Construction of an internal road network and circulation areas, with a staff entrance off Falcon Avenue to the east, as well as a secondary vehicular access for service and delivery vehicles only across a new bridge over the Baldonnel Stream from the permitted entrance as granted under SDCC Planning Ref. SD21A/0241 from the south-west, both from within Profile Park that contains an access from the New Nangor Road (R134); Provision of 60 car parking spaces (to include 12 EV spaces and 3 disabled spaces), and 34 cycle parking spaces; Signage (5.7sq.m) at first floor level at the northern end of the eastern elevation of the data center building; Ancillary site development works will include footpaths, attenuation ponds that will include an amendment to the permitted attenuation pond as granted to the north of the Baldonnel Stream under SDCC Planning Ref. SD21 A/0241, as well as green walls and green roof. The installation and connection to the underground foul and storm water drainage network, and installation of utility ducts and cables, that will include the drilling and laying of ducts and cables under the internal road network within Profile Park. Other ancillary site development works will include hard and soft landscaping that will include an amendment to the permitted landscaping as granted under SDCC Planning Ref. SD21A/0241, lighting, fencing, signage, services road, entrance gates, and sprinkler tanks; An Environmental Impact Assessment Report (EIAR) has been submitted with this application.
Amendments to planning permission Reg. Ref.: SD21A/0241 as previously amended by Reg. Ref. SD23A/0035. The proposed amendments consist of the following the provision of a temporary, single storey, medium voltage ESB substation building (with a gross floor area of c. 39.5 sq.m), accessed from the estate road to the south east. Associated landscaping and tree planting. All associated and ancillary works.
Retain the two rooftop lattice telecommunications support structures carrying antennas and link dishes.
Construction of a gas fired power plant with an electrical output of up to 125MW with associated balance of plant, equipment and buildings including; an Engine Hall building with a height of 18.9m, comprising 6 gas engines and ancillary infrastructure; an Electrical Annex Building with a height of 18.7m; a Workshop building with a height of 5. 1m; a Tank Farm building with a height of 5.68m; a Security hut with a height of 3.27m; an Exhaust Stack with a height of 31.8m; a Gas AGI including a kiosk with height of 3.3m; Radiator Coolers with a height of 8.46m; 2 electrical transformers with a height of 4.98m; Tanks including 2 x Diesel Oil Storage Tanks (volume of 2500m3 combined); SCR Urea Tank (26m3); Lube Oil Storage Tank (26m3); Lube Oil Maintenance Tank (26m3); Pilot Oil Tank (26m3); Fire Water Storage Tank (1000m3); Effluent Collecting Tank (26m3); Underground Surface Water Attenuation Tank (490m3); 2 new access onto the existing private road network with Profile Park; 12 parking spaces, footpaths, landscaping; fencing and all other associated site development plant and equipment and other works including surface water and foul wastewater drainage. An EIAR was submitted with this application.
Widening of the site entrance to provide for a separate lane for the entrance and exit of cars to separate car traffic from heavy good vehicle traffic and associated works at Kilcarberry Business Park, Clondalkin, Dublin 22.
Amendments to a development granted permission under Reg. Ref. SD21A/0167 for a gas fired power plant in Profile Park, Baldonnel. Permission is sought for revisions to the permitted Above Ground Infrastructure (AGI), associated with Gas Network Ireland’s high-pressure gas supply to the power plant which include: • the provision of an E & I kiosk, a regulators & meters kiosk, a gas analyser kiosk, and revisions to the boiler house kiosk with boiler flues. • the provision of a new stormwater attenuation design to serve the AGI compound; • minor revisions to the permitted internal road to serve the AGI; • minor revisions to the permitted fencing surrounding the Gas Pressure Reduction Skid located to the north of the proposed AGI; and • all associated and ancillary works. No changes are proposed to the gas fired power plant or to the site access permitted under Reg. Ref. SD21A/0167. The development permitted under Reg. Ref. SD21A/0167 includes activities which are subject to an Industrial Emissions Licence (Ref Number P1196-01).
The development will consist of a single storey self-contained family flat side extension and all associated site works
Permission and Retention permission for development at this site (total c. 0.42 ha) at Maxol Service Station, Newcastle Road, Adamstown, Lucan, Co. Dublin, K78 X4E1 (c. 0.29 ha) and the adjoining unused lands (c. 0.13 ha) to the south located at the junction of Newcastle Road and the Adamstown Industrial Estate access road. The development for which permission is sought will consist of: Change of use and incorporation of the unused lands (c. 0.13 ha) into the service station site and removal of the intervening boundary; Construction of an EV Charging Hub (consisting of 6 No. EV charging car parking spaces, canopy, substation and ancillary plant, and associated signage (6 No. x 2.5 sq m above the charging spaces, and 2 No. x 9.5 sq m single-sided internally illuminated totem signs)); Revisions to the overall site layout (resulting in the provisions of 33 No. car parking spaces (an increase of 15 No. car parking spaces) excluding the EV Hub spaces), motorbike and bicycle parking, alterations to vehicular circulation, relocation of air and water services, offset fills, vents and associated chambers; Provision of replacement foul water treatment plant with associated plant and percolation area, foul drain infrastructure for future connection to foul sewer, and new external lighting; changes to levels, hard and soft landscaping including revised boundary treatments, associated site servicing (water supply, foul and surface water drainage including surface water attenuation measures), all other associated site development works above and below ground. Development for which retention permission is sought consists of: An external gas tank with associated enclosure; Extensions to the filling station building comprising an entrance porch / lobby area (13 sq m) and back of house extension (34 sq m); Alterations to the internal layout of the building including the incorporation of a c. 48 sq m back of house area into the front of house area, increasing circulation spaces; Extended café/restaurant for the sale of hot and cold food for consumption both on and off the premises (from 32 sq m to 42.5 sq m), including a change of use to restaurant use of a 20 sq m area. The permitted café seating area (50 sq m) and the net retail area (100 sq m, including a 12.5 sq m ancillary off licence) will remain unchanged.
10 year permission for the construction of a 115MW Peaker Power Plant in a single storey building with a mezzanine level office and electrical control area. This building has a platform height of 17.52m, 7 shafts with a height of 20.74m and 2 stacks with a height of 25m. The development also includes water and fuel tanks with associated pump houses; 1 building consisting of a compact workshop and warehouse and a security area, with a height of 6.5m; site access and entrance gates; internal roadways and footpaths; security fencing; 6 car parking spaces (1 of these is accessible) and appropriate landscaping all on a site of 1.23 hectare site in the north of Grange Castle Business Park. The total gross floor area of the facility is approx. 3,583sq.m. This application relates to development which comprises of an activity which requires an Industrial Emissions Licence in accordance with the First Schedule of the EPA Act 1992 as amended.
10 year permission for the construction of a 115MW Peaker Power Plant in a single storey building with a mezzanine level office and electrical control area. This building has a platform height of 17.52m, 7 shafts with a height of 20.74m and 2 stacks with a height of 25m. The development also includes water and fuel tanks with associated pump houses; 1 building consisting of a compact workshop and warehouse and a security area, with a height of 6.5m; site access and entrance gates; internal roadways and footpaths; security fencing; 6 car parking spaces (1 of these is accessible) and appropriate landscaping all on a site of 1.23 hectare site in the north of Grange Castle Business Park. The total gross floor area of the facility is approx. 3,583sq.m. This application relates to development which comprises of an activity which requires an Industrial Emissions Licence in accordance with the First Schedule of the EPA Act 1992 as amended.
Alterations to a previously approved development (Reg. Ref. SD15A/0061 and Reg. Ref. SD16A/0398) which relates to a 10-year permission for the construction of a Peaker Power Plant in a single storey building with a mezzanine level, together with associated plant equipment including water & fuel tanks. The alterations to the previously approved development (Reg. Ref. SD15A/0061 & SD16A/0398) include the following: (i) alterations to the previously approved building within the eastern portion of the site as follows: (a) an increase in the overall footprint of the building to the north-west to include office space, and staff facilities at ground floor level; and to the north-east to include a boiler room at ground floor level; (b) revised roof footprint to the rear of the building, with the roof being lowered to the rear; (c) relocation of stair cores and updates to building elevations, including the introduction of additional glazing; (d) amendments to the external open service yard to the north of the building including the removal of the previously approved transformer rooms, addition of containerised plant and minor alterations to the location of shaft towers; (e) a minor increase in the height (by 600mm) of the screen to the service yard. Alterations to the western portion of the site include; (ii) minor amendments to the positioning of the internal roadway; (iii) amendments to the tank bund area and tank arrangement to the west of the site, and the addition of contained plant and a pump house building; (iv) minor amendment to the location of the approved tanker unloading area; (v) relocation of car parking spaces from the south of the site to the north of the main bund areas, with the exception of the approved accessible parking space; (vi) provision of a gas skid & support structure to the south-west of the site; (vii) provision of an enlarged plant compound to the west of the bund area and relocation of transformers to this compound; (viii) revisions to the positioning and an increase in size of the approved pipe bridge to align with services; (ix) provision of a new bicycle parking shelter comprising 8 no. parking spaces; (x) amendments to soft landscaping to accommodate the revised layout and; (xi) drainage, boundary treatments, site lighting, EV car charging ports; and all associated site development and ancillary works necessary to facilitate the development. The capacity of the plant will be 115MW as approved under Reg. Ref. SD15A/ 0061. This application relates to development which comprises of an activity which requires an Industrial Emissions Licence in accordance with the First Schedule of the EPA Act 1992 as amended.
Permission to install a standby industrial diesel generator and solar panels. The generator will include a bunded fuel tank to be located within a mesh enclosure. The proposed solar panels will be attached to a steel frame erected over the proposed generator and existing telecoms equipment, (covering an area of approximately 36 sq.m., to a maximum height of 4.6 meters above local ground level.) Works to include all ancillary development works, all located within an existing fenced compound.
The development will consist of the development of a Regional Network Gateway (RNG) facility (supporting infrastructure for the MS data centres) comprising the following: Demolition of existing, temporary, single storey showroom. Construction of a single storey main building (RNG Building - c.1,297.7 sq.m) with air handling units (AHUs). External plant/equipment yards including 3 no. diesel generators; sprinkler tank and pump house; electrical plant rooms, PV panels. Replacement of existing estate road access with new main access and secondary/emergency access. MV substation (with separate estate road access). Stormwater attenuation pond. Bike parking shelter and bin store. 12 no. car parking spaces (4 of which are EV parking spaces and with 1 accessible parking space). Internal road and footpath layout, perimeter fencing and security gates. Landscaped and planted areas including riparian zones. All associated site development works, site lighting, boundary treatments, services/utilities provision (including underground works), and all other ancillary works. Total gross floor area of the development c.1,536.9 sq.m
10 year permission on a site is bounded to the east and south by Grange Castle Golf Club, to the north by Nangor Road (R134) and to the west by an estate road known as Falcon Avenue) for modifications to the permitted data centre granted under SDCC Reg. Ref. SD21A/0186 comprising the following, reconfiguration and alterations to the data centre building to include removal of front of house offices at third floor level, alterations to floor levels at second floor to provide consistency between front of house and data halls, parapet height increase of front of house to c.16.8m, provision of storage at second floor level in lieu of relocated internal generators to the external generator yard and associated elevational alterations; extension of loading dock at ground floor level by c.6osqm in area with minor height increase to c.5.3m; removal of 3 air plenums to the front (north) elevation and provision of screening to generator flues in lieu of omitted plenums; alterations at roof level to include removal of 2m high gantry screening; alterations to the permitted generator plant yard to the north of the data centre to include the removal of fuel tanks, reconfiguration of plant and generators, provision of 2 additional external generators (increase from 5 to 9 external generators), provision of 4 additional external plant rooms, provision of diesel pump tank cabinets and stepover, relocation of generator yard doors and enlarged generator yard to accommodate the proposed modifications; increase in plant areas by c.77sq.m; reconfiguration of plant within the permitted chiller plant yard to the south of the data centre; removal of 1 sprinkler/water tank and removal of stairs and door to the side of the waste compound; reconfiguration of car parking and motorcycle spaces and removal of 1 accessible space. 64 total number of car parking spaces; the proposal also includes provision of on-site gas power generation compound ( c.2,604sq.m in area) in the area previously reserved for a future data centre; the compound comprises 7 modular plant rooms (totalling c.180sq.m in area), 10 gas fired generators and associated flues c.14.7m high, gas skid, associated modular plant, boundary treatment surrounding the compound c.6.5m high and 2 vehicular access points including general and emergency access; all associated site development works, services provision, drainage works, access, landscaping and boundary treatment works; no buildings are proposed above the existing ESB and SDCC wayleaves to the west and north of the site; the overall Gross Floor Area of the development is reduced by c.44sq.m to c.9,795sq.m from previously permitted under SDCC Reg. Ref. SD21A/0186; the application is accompanied by a Natura Impact Statement.
Construction of a 3 storey (part 4 storey) data centre known as 'DB8' to include data halls, electrical/plant rooms including internal generators, offices, lobbies, ancillary staff areas including break rooms and toilets, stores, stair/lift cores throughout and photovoltaic panels at roof level; the total gross floor area excluding hot air plenums and external staircase is c.9,601sq.m and the overall height of the data centre ranges from c.16m to c.20m to roof parapet level and up to c.24.48m including roof top plant, flues and lift overrun; provision of 5 external generators, 8 fuel tanks and ancillary plant contained within a plant yard to the north of DB8; provision of a water tank plant room, air cooled chillers and ancillary plant contained within a chiller plant yard to the south of DB8; provision of a water sprinkler pump room (c.23sqm), 2 sprinkler tanks (c.12m high each), heat recovery plant room (c.17sqm), ESB substation (c.44sqm), waste/bin stores (c.52sqm); total floor area of ancillary structures and plant (c.303sqm); provision of a delivery yard and loading bays, 64 car parking spaces, 5 motorcycle spaces, bicycle shelter serving 14 spaces, smoke shelter, internal access roads and footpaths, vehicular and pedestrian access to the west from Falcon Avenue and closure of an existing vehicular entrance from Falcon Avenue; all associated site development works, services provision, drainage works including attenuation, landscape and boundary treatment works including berming, hedgerow protection areas and security fencing; no buildings are proposed above the existing ESB wayleave and SDCC watermain wayleave to the west and north of the site; the area to the southwest of the site (temporary meadow) is reserved for a future data centre, subject of a separate application to South Dublin County Council on a site bounded to the east and south by Grange Castle Golf Club, to the north by Nangor Road (R134) and to the west by an estate road known as Falcon Avenue. This application is accompanied by a Natura Impact Statement.
10 year permission for development consisting of removal of an existing unused waste water treatment facility on site and the erection of two data centre buildings, gas powered energy generation compound, and all other associated ancillary buildings and works; the two data centre buildings, DUB 15 and DUB 16, will comprise a total floor area of c. 33,577sq.m over two storeys; the first 2 storey data centre building (DUB15), located to the southwest of the site, will comprise 16,865sq.m data storage use, ancillary office use and associated electrical and mechanical plant rooms, loading bays, maintenance and storage space; a second 2 storey data centre building (DUB16), located to the southeast of the site, will comprise 16,712sq.m data storage areas, ancillary office use and associated electrical and mechanical plant rooms, loading bays, maintenance and storage space; both data centre buildings will reach a height of 20m; emergency generators and associated emission flues and plant are proposed in compounds adjacent to each data centre building; gas powered energy generation is proposed to the north east corner of the site to provide electricity for the proposed development; the application proposes to re-route and widen an existing watercourse constructed following an earlier planning permission; it is proposed to reroute this watercourse along the eastern and southern boundary of the site; landscaping is proposed to the south of the site to screen the buildings; fencing and security gates are proposed around the site; new access roads within the site are proposed along with 71 car parking spaces and 26 cycle spaces, bin stores, site lighting, and all associated works including underground foul and storm water drainage attenuation and utility cables and all other ancillary works; a Natura Impact Statement will be submitted to the planning authority with the application.
The permanent continuation of use of the following existing buildings and structures: a prefabricated office (16.0m x 3.8m x 3.0m high); prefabricated canteen facilities (14.0m x 3.8m x 3.0m high); water holding tank (29.7m x 6.3m); 4 aggregate ground storage bays; power house (15.9m x 4.0m x 3.6m high); and weighbridge, all previously permitted for a five year period under Pl. Ref. SD17A/0218.
1 screened bin compound to be relocated to the south-east corner of the site; 2 transformers within individual compounds and adjoining switch room (35.2sq.m) to be located to the east of the permitted data centre to replace screened transformer compound permitted to the south-east of the site; 1 new plantroom (19.8sq.m) and 1 water storage tank to be located to the west of the permitted data centre to replace previously approved fire suppression enclosure and new double gates to replace sliding gates at entrance into the permitted data centre site.
385 dwelling units (139 houses, 70 Build-to-Rent duplex / apartments, 72 duplex / apartments and 104 apartments), ranging between two to six storeys in height comprising the following: - Total of 139 houses consisting of 102 three bedroom two storey terraced houses (House Type: 0, E & F); 11 four bedroom two storey terraced houses (House Type: C); 26 four bedroom three storey terraced houses (House Type: A & B); Total of 70 Build-to-Rent duplex / apartments units consisting of 35 two bedroom units (House Type: J, L & O); 35 three bedroom units (House Type: K, M & P); Total of 72 duplex / apartment units consisting of: - 36 two bedroom units (House Type: J, L & O); 36 three bedroom units (House Type: K, M & P); Total of 104 apartment units accommodated in 2 blocks ranging from four to six storeys consisting of 48 one bedroom units (House Type: A1 & A2); 56 two bedroom units (House Type: B1 & B2); Private rear gardens are provided for all houses. Private patios / terraces and balconies are provided for all duplexes and apartments; Vehicular access to serve the development is provided off the Clonburris Southern Link Street permitted under SDCC Reg. Ref. SDZ20A/0021 and currently under construction. Pedestrian and cycle access is also provided to the Newcastle Road (R120) and to the Clonburris Southern Link Street; All associated and ancillary site development, infrastructural, hard and soft landscaping and boundary treatment works, including: - A single storey tenant amenity building (c. 170 sq.m); Areas of public open space (1.45Ha); 538 car parking spaces and 878 bicycle parking spaces (660 long-term spaces and 218 visitor spaces); Bin and bicycle stores; Plant provided at undercroft level and additional plant provided at roof level (including solar panels) of the proposed apartment blocks; 3 ESB Sub-stations; Demolition of remaining walls and hardstanding associated with a former agricultural building; The development proposed includes minor revisions to an attenuation pond, connections to water services (wastewater, surface water and water supply) and connections to permitted cycle/ pedestrian paths permitted under SDCC Reg. Ref. SDZ20A/0021 on a site (c. 8.94 Ha) in the townland of Adamstown, within the Clonburris Strategic Development Zone (Adamstown Extension). On lands generally bound by the Dublin-Cork Rail Line to the north; Hayden's Lane, the Griffeen River and the undeveloped lands of Clonburris Strategic Development Zone to the east; Lucan Pitch and Putt to the south; and Newcastle Road (R120) to the west. This site consists of Development Areas AE-Sl and AE-S2 within the Clonburris Strategic Development Zone, as prescribed by the Clonburris Strategic Development Zone Planning Scheme 2019; This application is being made in accordance with the Clonburris Strategic Development Zone Planning Scheme 2019 and related to a proposed development within the Clonburris Strategic Development Planning Scheme Area, as defined by Statutory Instrument No. 604 of 2015.
Permission is sought for minor revisions to the already permitted residential development consisting of: - Minor reduction in gross floor areas and internal layout reconfiguration of 131no. houses (House Type A, B, C, D, E & F) and 142no. duplex units (Duplex Type J, K, L, M, O & P) including change of Duplex Type L from 2-bed Duplex (2 storey) to 3-bed Duplex (2 storey) and all associated elevational adjustments and adjustments to private / communal open space; Replacement of 4no. House Type D with 5no. House Type G; Replacement of 4no. House Type E with 3no. House Type H; Adjustments to the terrace of houses on Local Road 1 (4no. House: No. 278 - 281) to split the previously permitted terrace into 2no. sets of 2no. semi-detached houses (House No. 278 - 279 and House No. 280 - 281); Minor reduction in height of Apartment Block 1; Localised adjustment to landscaping where building footprints have reduced and adjustments to the landscaping around the perimeter of Apartment Block 1 and 2; Additional changes to the specification of the permitted landscaping / road surface finishes; Adjustments to bicycle stores including the addition of 9no. bicycle spaces; And all associated and ancillary site development works. The proposal is a minor amendment to development already permitted under SDCC Reg. Ref. SDZ23A/0004. The development continues to consist of the 395no. dwellings as already permitted. This application is being made in accordance with the Clonburris Strategic Development Zone Planning Scheme 2019 and related to a proposed development within the Clonburris Strategic Development Planning Scheme Area, as defined by Statutory Instrument No. 604 of 2015.
Construction of a part one /part three storey extension on the western and (part) southern elevation of the existing QAQC Building to provide and expanding staff cafeteria at ground floor (including the remodelling of the canteen within the existing building)and office accommodation on the 1st and 2nd floors: construction of plant room and plant area enclosure on the roof of existing QAQC building and all associated site works required to facilitate the proposed development including hard and soft landscaping to the north, western and southern boundaries of the proposed extension, a subterranean surface water attenuation tank and foul eater grease trap to the north end of proposed extension, and 2 no, surface level external plant enclosures to the south of the proposed extension.
The development consists of additions, alterations and modifications to the existing and permitted industrial facilities (permitted under Reg. Ref. SD23A/0123) at the Pfizer site in Grange Castle. They include; (a) The relocation of and modifications to the previously permitted photovoltaic solar panel substation, adjacent to the car park at the centre of the site and to the south-east of the DS2 building permitted under Reg. Ref. SD23A/0123. The proposed building is now approximately 41 square metres and approximately 6.3 metres high. (b) The construction of a waste compound office, within the waste compound to the south of the DS2 building, both previously permitted under Reg. Ref. SD23A/0123. The proposed building is approximately 14.4 square metres and approximately 2.85 metres high. (c) Modifications and alterations to the existing access and egress (Pfizer Gate No. 3) from the public road within the Grange Castle Business Park, including installation of new vehicular gate and associated fencing including associated minor alterations to existing adjacent berms and modifications and alterations to the existing public pathway and public cycle lane adjacent to the existing entrance (Pfizer Gate No. 3). (d) The works also include modifications to previously permitted underground utilities, site lighting, internal roads and footpaths and all associated siteworks.
Additions, alterations and modifications to the existing and permitted industrial facilities, with a total area of approximately 305.8 sqm (permitted under Reg Ref SD23A/0123) at the Pfizer site in Grange Castle. They include; A. a single storey extension to the link building adjacent to the DS2 building permitted under Reg Ref SD23A/0123. The proposed extension is approximately 240 sqm and approximately 7.9 meters high. B. Demolition of existing single-storey extension approximately 36 sqm and approximately 4.2 meters high and construction of a new single storey extension to the existing Softened Water Building. The proposed extension is approximately 65.8 sqm and approximately 7.2 meters high. C. The works also include modifications to internal roads and pathways, underground utilities, site lighting, internal roads and footpaths and all associated site works. This application consists of a variation to previously permitted development for an activity for which a licence under Part IV of the Environmental Protection Agency Act 1992 (as amended by the Protection of the Environment Act, 2003) is required.
The installation of double row V-shaped duo-pitch and single row mono-pitch solar carports on the existing surface car park to the north of the QAQC Building and over part of the surface car park to the west of the Development and Drug Substance buildings, 2 no. single storey substation buildings, EV charging equipment, and all other associated works required to facilitate the proposed development including surface water drainage and landscaping
Permission for development consisting of the completion of the development granted permission under Planning Application Reg. Ref. SD16A/0236 subject to the amendments and alterations to the previously approved biopharmaceutical manufacturing facility and warehouse extension and other additional, new development not forming part of SD16A/0236, located at the Pfizer site at Grange Castle Business Park, New Nangor Road; The modifications to the approved development will consist of alterations and modifications to previously approved site buildings and infrastructure required to support the proposed development they include, (a) A 6-level biopharmaceutical manufacturing building sized approximately 30,469sq.m (previously approximately 34,650sq.m) and approximately 35 metres high (previously approximately 28.2m high), with stairwells approximately 38m high, and roof-mounted plant and equipment, including solar panels; Modifications to the existing Development and Manufacturing Facility including elevational alterations and modifications to existing plant and equipment; (b) A single-storey warehouse building extension with high-bay, sized approximately 3,200 square metres (previously approximately 1,142sq.m) and approximately 17.5m high, with roof-mounted plant and equipment, including solar panels; (c) A single-storey pedestrian and materials link sized approximately 1,687sq.m (previously approximately 750sq.m) and approximately 6.95m high; (d) A new, additional 4-level extension to the existing DS1 biopharmaceutical manufacturing building, to accommodate material lifts and storage areas, sized approximately 1,925sq.m and approximately 38.2m high, to the south elevation of the existing building; (e) A new, additional single-storey chiller building sized approximately 395 square metres and approximately 6.25m high, with roof-mounted plant and equipment; (f) A new, additional single-storey plant and utilities building sized approximately 256sq.m and approximately 6.25m high, with roof-mounted plant and equipment; (g) Provision of relocated car park from its previously permitted location at the northeast of the side to a new location to the southeast of the proposed biopharmaceutical facility; including approximately 273 additional car parking spaces, including accessible car parking spaces, electric vehicle charging, motorcycle parking, dedicated car-pooling spaces and cycle parking, all accessed from the internal Grange Castle Business Park roads. Mobility parking is located adjacent and directly north of the proposed facility; (h) A relocated, single-storey security building sized approximately 60 sq.m and 6m high; (i) The proposed site infrastructure includes additional cooling towers/heat exchangers, a tank farm, pipe-bridges, surface water harvest tanks, docks and yard areas, including associated items of plant and equipment, an electric vehicle charging and solar panel substation to service photovoltaic panels over new car parking spaces, photovoltaic solar panels located over new car parking spaces, electrical generators, underground pumping facilities and internal roads and paths, fencing and site lighting, and the use of the existing Pfizer site entrance (Gate No.3) for heavy goods vehicles; (j) The development includes modifications to and the extension of, the existing internal road network within the Pfizer Campus; (k) Proposed new landscaping includes new landscaped and planted areas, replacement and reinforcement of the existing landscaping and modifications to existing berms and perimeter security fencing and gates; (l) Proposed new signage based at ground level and on the building facades on the proposed new production building; (m) The works include temporary contractor compounds, temporary car parking and the temporary use of existing site entrances during construction activities; (n) Proposed new surface water management infrastructure for the site, consisting of underground attenuation systems, rainwater harvest cisterns and distribution pipework; (o) All associated site works including sustainability features described in points (a) to (I); Planning permission for the construction of a temporary contractors car park on land to the west of the Pfizer facility with access off Grange Castle Business Park and the reinstatement of the lands to agriculture after the need for the car park expires; The application is seeking permission of 5 years for the completion of the development granted permission under PA Ref: SD16A/0236 subject to the above amendments and alterations to the previously approved Biopharmaceutical Manufacturing Facility and Warehouse and other additional, new, development not forming part of SD16A/0236; This application consists of a development for an activity for which a licence under Part IV of the Environmental Protection Agency Act 1992 (as amended by the Protection of the Environment Act, 2003) is required; An Environmental Impact Assessment Report (EIAR) accompanies this planning application.
Replacement of existing signs in approved locations including the high level signs on the western elevation of the Drug Substance Building and the northern elevation of the Administration QAQC Building with a halo lit company logo and lettering and a face lit company logo and lettering, respectively; the nonilluminated wall mounted company sign adjacent to the entrance on the northern elevation of the Administration QAQC Building with non-illuminated company logo and lettering; the non-illuminated signs on structures on the verge of the Business Park estate road to the west of the site; and the signage on the approved internally illuminated structure on the verge at the junction of the Business Park estate roads to the north west of the site. The development for retention permission consists of the retention of a non-illuminated sign installed on a structure on the verge of the Business Park estate road to the west of the site; non-illuminated signs installed on the boundary fence adjacent to two of the entrances to the site from the Business Park estate road; non-illuminated traffic direction signs installed on traffic sign poles adjacent to the southern entrance into the site and on the verge of the Business Park estate road to the west of the site; and a wall mounted non-illuminated sign with company logo and lettering adjacent to the entrance on the western elevation to the Central Utility building.
2 No. trough-lit fascia signs and internally applied window graphics to glazing
Change of use of unit 3 (56sqm) from Class 1 (retail) to Class 9 (Residential Training Centre) and associated signage and ancillary works. The development will take place within Adamstown Strategic Development Zone.
Change of use of one 59sq.m polyvalent community room into a sessional Montessori preschool, running daily Monday - Friday, from 9am to 12noon, as well as 2 display signs, internally mounted on a south window during operating hours and all related arrangements.
Planning Permission for; 1) Single storey extension with 4no. roof windows to the rear of existing dwelling and front porch. 2) Conversion of existing attic space comprising modification of existing roof structure, dormer window to the rear, new access stairs, 3no. roof windows to the front of exiting dwelling and all associated site works within a Strategic Development Zone
New external Freezer Plant Platform Structure; single storey MRO Stores building within the existing construction compound; external Data Centre unit to the south of the existing Manufacturing Suites Building; airlock extension & relocated external double emergency exit doors to the south of the existing Manufacturing Suites Building; Pallet Storage building adjacent to the existing Drum Store West building within the Utility Yard and boiler Water Chemical Dosing Unit within the CUB yard and all associated site works.
The construction of a single storey extension to the rear and side of their existing detached dwelling and all associated site works. The extension will consist of a Bedroom, Accessible Wet room and Dressing area. The site is within the Adamstown Strategic Development Zone.
1) The provision of a pedestrian/cyclist entrance on the northern boundary including turnstile and disabled access gates, and stepped and ramp accesses to the footpath; and 2) The provision of a stepped pedestrian access to the existing monitoring station building at the north west boundary including repositioning of boundary fence to incorporate the area into the overall campus.
Minor amendments to the development permitted under Planning Permission Ref SDZ21A/0007 comprising the following: repositioning of landscaped communal courtyard of Block G from first floor podium level to ground floor level due to removal of podium parking at Level 0, and the consequential relocation of 83 car parking spaces within the Block F multi-storey car park (as permitted under Ref SDZ20A/0008, amended by SDZ20A/0018 and as further amended under a concurrent application under Ref SDZ21A/0017) and to on-street locations immediately adjacent to Block G, all including ancillary site development and landscape works; modification of 174 apartments (74 one-bedroom units, 98 two-bedroom units and 2 three-bedroom units) arising from adjustments to structural grids in Block G consequent to repositioning of the car parking and the landscaped courtyard; adjustments to Block G2 consisting of a minor reduction to the footprint of the Block by 0.6m and the removal of the setback floor on the northern half of the block (level 5), the reduction In height (1 floor) to the northern half of Block G2 (now 5 storey), a minor reduction to the overall provision of residential units from 185 to 184 apartment units, a minor reduction to the overall provision of car parking spaces from 93 to 92 spaces, a minor reduction to the overall provision of bicycle parking spaces from 225 to 224 spaces, the introduction of 9 ground floor units, facilitated by the removal of the podium from the core, the introduction of an additional apartment unit on Level 1, adjustments to the location of the bicycle, plant, and waste stores serving Block G, including the provision of bicycle storage structures In the courtyard; the development now proposed in Block G comprises of 184 apartments in a mix of 83 one-bedroom units, 99 two-bedroom units, 2 three-bedroom units, in two blocks (Block G1 ranges in height from 4 to 9 storeys and Block G2 ranges in height from 4 to 6 storeys; both including set back floors).
Phase Two of the Adamstown District Centre and consists of 17,764sq.m (gross floor area, including car park and storage) of residential development to be constructed in 2 buildings ranging in height from 4 to 9 storeys; a total of 185 apartments, comprising 82 1-bedroom apartments, 102 2-bedroom apartments and 1 3-bedroom apartment; ancillary resident's amenity rooms and facilities are also provided at the ground floor level of Block G1; all apartments are provided with private open space in the form of balconies or gardens. The proposed block description is as follows: Block G1 (c. 6,708sq.m gross floor area, 5,420sq.m net floor area); 4-9 storeys, with a total of 86 apartments (38 1-bedroom apartments and 48 2-bedroom apartments); resident's amenity area (231sq.m) including lounge and gym at ground floor, with direct access to semiprivate communal open space; private front gardens are provided on the west elevation for all ground floor units; private front gardens are also provided for first floor units on the east elevation, with access onto a communal open space between Blocks G1 and G2 above the podium; ancillary plant, storage, waste and internal bicycle parking rooms provided at ground floor level; Block G2 (c.7,808 sq. m gross floor area, 6,480 sq. m net floor area): 4-5 storeys with 1 no. setback storey and a total of 99no. apartments (44 1-bedroom apartments, 54 2-bedroom apartments and 1 3-bedroom apartment); private front gardens are provided on the east and south elevations for all ground floor units; private front gardens are also provided for first floor units on the west elevation, with access onto a communal open space between Blocks G1 and G2 above the podium; ancillary plant, storage, waste and internal bicycle parking rooms provided at ground floor level; the development provides a total of 1,249sq.m landscaped public open space, principally in 2 areas - to the north and to the south west of the site; a total of 1,478sq.m resident's communal open space is provided at ground floor level and at first floor level on a podium above the car parking area, with a further 486sq.m. of communal open space in the form of buffers and planted areas; a total of 93 car parking spaces are provided for this development, with 10 at street level and 83 beneath the podium between Blocks G1 and G2; a further 10 car parking spaces are to be provided at street level, but are reserved for use by a future phase of development. 225 bicycle parking spaces are provided, including 185 covered, stacked bicycle parking spaces and 40 'Sheffield Stands' in the public realm; new Toucan Crossing at Station Road and other roads infrastructure across the development including insertion of tactile paving, raised tables, loading bay and roads signage; photovoltaic panels are provided on the roof of both Blocks G1 and G2, as well as lift over runs and plant at roof level; the development also includes the provision of ancillary site development, boundary treatments and landscape works; the application site incorporates elements of the Adamstown Station Development Areas within the Adamstown Strategic Development Zone; this application is being made in accordance with the Adamstown Planning Scheme 2014, as amended, and relates to a proposed development within the Adamstown Strategic Development Zone Planning Scheme Area, as defined by Statutory Instrument No. 272 of 2001 on lands bounded generally by Adamstown Avenue and the Stratton housing development to the North, by Station Road, Adamstown Train Station and the Dublin to Kildare railway line to the South, by Adamstown Park to the East, and to the West by lands currently undeveloped, but benefitting from Planning Permission Reg. Ref. SDZ20A/0008, as amended by Reg. Ref. SDZ20A/0016 and SDZ20A/0018.
Change of use of existing temporary car park to a temporary park and ride facility (commercial car park). The temporary park and ride facility (commercial car park) is proposed to consist of 27 no. car parking spaces, of which 2 no. are accessible spaces; vehicular access to the temporary park and ride facility is via the existing entrance off Adamstown Avenue, with provision made for anew pedestrian access located adjacent to existing vehicular access on Adamstown Avenue; associated car park management signage (4 no.); all ancillary site development and landscape works; all on site of c. 1,054 sqm.
The proposed development includes the construction of: 6 no. Stage buildings (buildings 1,2,3,11,13 &14) ranging in height between c. 20m and c. 23 m and comprising 11 no. Internal sound stages with overhead catwalks and 2-storey ancillary production offices including office space, plant and switch rooms, toilets, ICT rooms, staff toilets and showers and rooftop plant (totalling c. 35,187 sq. m); 4 no. workshops (buildings 15,16,17 &18) ranging in height between c. 9m and c. 10.5 m and comprising internal workshop areas, staff toilets and showers, ICT, plant and switch rooms(totalling c. 18,244 sq. m); TV studio and reception (building 4) comprising 3 no. TV studios (c. 17.8m height) and various supporting spaces across 3 floors including backstage shooting area, green rooms, hair and makeup rooms, production suites with ancillary offices, wardrobe, laundry room, Technical support offices, vision dept, lighting dept, pro service, run and crew kit room, chief engineer office, studio manager office, scenic store, props store, cameras and grip room, lighting and electrical room, plant room, sound control rooms, vision rooms, recording rooms and toilets at ground floor level; standard dressing rooms, tv post production spaces, kitchen and crew area, toilets, mechanical/electrical room, technical offices, media store at first floor level; star dressing rooms, tv post production, lounge and kitchen and toilets at second floor level; Single storey reception building to include guest holding areas, VIP and Guest service, security offices, staff toilets, showers and locker rooms (c. 10,875sq. m); 2-storey Dining Hall with ancillary 100 seat theatre (building 6) comprising indoor and outdoor dining areas, kitchen, storage and mechanical rooms, toilets and 3 no. meeting rooms at ground floor level; office space and covered outdoor balconies at First floor level (c. 4,351sq. m) Standalone café (building 5) (c. 96 sq. m) 3 no. single storey production suites (buildings 7,8 & 9) comprising offices, conference room, kitchenette, communal areas and toilets (totalling c. 795 sq. m); 3-storey car parking deck (building 19) (c. 14,782.sq.m) to include 438 no car parking spaces ( including 100 no. EV and 27 no. disabled) with ancillary offices (building 20) (c. 4,307sq.m) refuse recycling area and rooftop plant; and Outdoor stage area associated with the TV Studio and Reception Building; Site landscaping to include: an amenity walkway and biodiversity area along the northern boundary of the site; public realm and planting areas in the vicinity of TV Studio and Reception Building and production suite offices; green roofs; and boundary treatments. Hard standing to include backlot area (c. 14,160 sq.m) and 'shooting lanes' (c.18,900 sq.m) to facilitate outdoor filming; Electrical Substation (c 236 sq. m); primary and secondary gate houses (buildings 10 & 12) (c. 19 sq. m each) The proposed development will include the provision of 516 no. surface car parking spaces (including 96no. EV, 13 no. disabled and 13 no. EV / disabled ); Basecamp area to provide 36 no. Large Vehicle parking spaces & 3 no. bus parking spaces to front of reception building as well as provision of Bicycle parking to include 274 no. covered spaces and 96 no. external spaces. Additional works to include removal of existing wall and vegetation at south western boundary; provision of bin store adjacent to the proposed backlot area and additional waste storage area adjacent to proposed dining hall; proposed pump station; rooftop PV panels (Buildings 17 & 18);rooftop plant; Building signage; LED video screen on eastern elevation of TV studio and reception building; public lighting; drainage and services provision; boundary treatments (including security fencing); piped site wide services; pedestrian and cycle links and all ancillary works and services necessary to facilitate construction and operation. The primary proposed vehicular, cyclist and pedestrian entrance from the newly constructed Grange Castle West Access Road will be located at the eastern boundary of the site with a secondary vehicular access at the southeastern corner of the site.
Extension to existing external freezer plant platform structure to east of existing building and associated site works.
Extension to existing above ground natural gas installation; the extension will include a regulator/meter kiosk, boiler/generator kiosk, electrical/instrumentation kiosk, underground and above ground pipework, 2.4m high chain-link and palisade fencing, light/CCTV columns and all ancillary services and associated site works.
Construction of a 31 sq./m ground floor extension the rear of existing duplex dwelling and all associated siteworks.
The installation of 18 no. telecommunication antennas, together with 9 no. dishes, 3 no. equipment cabinets and all associated equipment on the building's rooftop plantroom. The development will provide high speed wireless data and broadband services for all 3 of Irelands mobile operators, namely Eircom (t/a eir), Three Ireland and Vodafone Ireland. This application relates to part of the lands within Adamstown Strategic Development Zone.
Signage on south, east, west and north elevations of Block F of the development permitted under Planning Permission Reg. Ref. SDZ20A/0008, as amended by SDZ20A/0016 SDZ20A/0018 and SDZ21A/0017. The total quantum of proposed signage is c.107.6sqm, including the provision of 4 externally mounted 'Tesco' advertising signs {approx. 1,500mm high and 5,656mm wide) with translucent acrylic face and internal LED lighting affixed to the upper level facade on the North, East and South elevations of the building; the provision of 4 externally mounted 'Aldi' advertising sign cases {approx. 2,470mm high and 2,070mm wide) with translucent acrylic face and internal LED lighting affixed to the upper level facade on the North, East and South elevations of the building; the provision of lno. horizontal, externally mounted '3-D letter' signs for 'The Crossings' {approx. 928mm high and 8,775mm wide) with translucent acrylic face and internal LED lighting affixed to the upper level facade on south,west and east elevations; the provision of Sno. vertical, externally mounted '3-D letter' signs for 'The Crossings' {approx. 800mm high and 8,000mm wide) with translucent acrylic face and internal LED lighting affixed to the upper level facade on the west elevations; the provision of lno. carpark entrance sign {approx. 719mm high and 3,725mm wide) with black and white aluminium composite panels and internal LED lighting affixed to the upper level facade on the east elevation; the provision of internal carparking level, directional and carpark marking signage at all levels; Block F is otherwise permitted under Reg. Ref. SDZ20A/0008 {the 'parent permission') and as subsequently amended by SDZ20A/0016 SDZ20A/0018 and SDZ21A/0017; the application site incorporates elements of Adamstown Square and Adamstown Station Development Areas within the Adamstown Strategic Development Zone; this application is being made in accordance with the Adamstown Planning Scheme 2014, as amended, and relates to a proposed development within the Adamstown Strategic Development Zone Planning Scheme Area, as defined by Statutory Instrument No. 272 of 2001 on lands bounded generally by Adamstown Avenue, Adamstown Boulevard and the Stratton housing development to the North, by Station Road, Adamstown Train Station and the Dublin to Kildare railway line to the South, by Adamstown Park to the east and by currently undeveloped lands to be developed in a subsequent phase of development to the west.
Construction of Phase One of the Adamstown District Centre; proposed development is a mixed use commercial and residential development of c.36,621sq.m (gross floor area) in total (excluding the multi-storey car park) to be constructed in buildings ranging in height from 4-9 storeys. The non-residential element of the development consists of a total of c.9,653sq.m (net sales floor space), as follows: 16 retail units comprising c.8,693sq.m including 1 supermarket (c.6,880sq.m in total) and 2 retail service units (c.290sq.m); 5 retail/restaurant/café units comprising a total of c.959sq.m; projecting signage and awnings on retail and retail/café/restaurant units. The residential element consists of a total of 278 residential units comprising 16 studio units, 66 one bedroom units, 151 two bedroom units and 45 three bedroom units in a mix of apartments and duplexes; ancillary residents amenity rooms and facilities also provided and all residential units are provided with private open space in the form of balconies or gardens. The proposed block description as follows: Block B (c.14,506sq.m gross floor area) 4-7 storeys with setbacks at 4th and 5th floors arranged around an internal courtyard accommodating 6 retail units and 3 retail/restaurant/café units at ground floor level; residents amenity area at first floor and 135 residential units including 15 two bedroom own door duplexes and 120 apartments (1 studio, 46 one bedroom, 50 two bedroom and 23 three bedroom units); private front gardens are provided at ground floor level on the west and south elevations and balconies are provided on all outward facing elevations of the building and on courtyard elevations; car parking is provided at ground floor within the interior of the courtyard along with bicycle parking and ancillary management, waste, plant and service areas; a residents communal open space is provided at first floor level on a podium above the car parking area; Block E (c.15,235sq.m gross floor area) 4-9 storeys with setback at 5th floor arranged around an internal courtyard accommodating 9 retail units and 2 retail/restaurant/café units at ground floor level and 143 residential units including 10 two bedroom own door duplexes and 133 apartments (15 studios, 20 one bedroom, 76 two bedroom and 22 three bedroom units); private front gardens are provided at ground floor level on the west elevation and balconies are provided on all outward facing elevations of the building and on courtyard elevations; car parking is provided at ground floor level within the interior of the courtyard along with bicycle parking and ancillary management, waste, plant and services areas; a residents communal open space is provided at first floor level on a podium above the car parking area; Block F (c.30,647sq.m gross floor area including car parking levels) 4 storeys, a supermarket is provided at ground floor level including sales area, retail back of house and service areas as well as internal vehicular goods and delivery area accessed from Station Road and existing onto the proposed back street which runs perpendicular to Station Road and Adamstown Avenue; a multi-storey car park accessed from Station Road by ramp at ground floor level is at first, second and third floor levels; the multi-storey car park includes residential car parking spaces as well as spaces associated with the supermarket unit and other non-residential uses in the district centre; the third/top floor of the multi-storey car park will not be made available for car parking under this planning application as it is designed to cater for a subsequent phase of development, subject to a future planning application. The development provides a total of c.16,000sq.m of public realm including the creation of a new public square, internal streets and landscaping works; alterations to Station Road to include landscaping; reconfiguration of existing on street parking; insertion of raised table at station entrance; taxi set-down spaces and creation of 2 bus bays to the north and south of Station Road; creation of vehicular and pedestrian accesses to the site from Adamstown Avenue, Station Road and Adamstown Park; removal of 2 public/visitor car parking spaces along Adamstown Avenue proximate to Stratton Way to accommodate provision of a bus bay, together with provision of a bus bay on south side of Adamstown Avenue opposite; photovoltaic panels on the roofs of Block B and E; lift overruns and plant at roof levels; 534 car parking spaces to be provided through a mixture of on-street parking; podium parking under Blocks B ad E in the proposed multi-storey car park in the upper levels of Block F; the first and second floor levels of the multi-storey car park accommodate 448 car parking spaces in this phase; a total of 702 cycle parking spaces (271 stands/542 spaces within Blocks B and E and 80 stands/160 spaces in the public space) are provided throughout the development to cater for both residential and commercial uses; the 50 bike stands at Adamstown Station are to be maintained. The proposal also includes temporary landscaping and construction of temporary site hoarding and fencing in or around areas for future phases of development immediately adjacent to the development; all ancillary site development and landscape works on lands bounded generally by Adamstown Avenue, Adamstown Boulevard and the Stratton housing development to the north, by Station Road, Adamstown Train Station and the Dublin to Kildare railway line to the south, by Adamstown Park to the east and by currently undeveloped lands to be developed in a subsequent phase of development to the west; the application site incorporates elements of Adamstown Square and Adamstown Station Development areas with the Adamstown Strategic Development Zone and is being made in accordance with the Adamstown Planning Scheme 2014, as amended, and relates to a proposed development within the Adamstown Strategic Development Zone Planning Scheme Area, as defined by Statutory Instrument No. 272 of 2001.
Amendments to Block F of the development permitted under Planning Permission Reg. Ref. SDZ20A/0008, as amended by SDZ20A/0016 and SDZ20A/0018 comprising of provision of an additional level of car parking to be inserted into the recently permitted multi-storey car park (Block F) under Reg. Ref. SDZ20A/0018. A raised plantroom, with railings is also proposed at roof level. With these additions, Block F will be four storeys in height, with an additional setback plantroom on the roof. Car parking is provided at first, second and third floors. (Block F now comprises total 29,371sq.m gfa; minor amendments to the permitted floor layouts of all levels within Block F. This includes an increase of retail floorspace in Anchor Unit 1 at ground floor level of 57sq.m (gfa), and an increase of 33sq.m (gfa) at third floor of retail plant; retail floorspace has increased in Block F overall from 7,115sq.m (gfa) to approximately 7,205sq.m (gfa); minor modification to entrance to the car park is also proposed; a total of 673 car parking spaces to now be provided within Block F, with 230 spaces allocated to residential use and 443 spaces associated with the supermarket units and other non-residential uses in the district centre; minor alterations to façade of Block F, including relocation and addition of doors, windows and louvers at ground floor level; PV Panels are provided on the roof on lands bounded generally by Adamstown Avenue, Adamstown Boulevard and the Stratton housing development to the North, by Station Road, Adamstown Train Station and the Dublin to Kildare railway line to the South, by Adamstown Park to the east and by currently undeveloped lands to be developed in a subsequent phase of development to the west.
Amendments to the development permitted under Planning Permission Reg. Ref. SDZ20A/0008, as amended by SDZ20A/0016 and comprises of the following: Adjustments to the configuration of the footprint of Block F now over 3 levels (c. 22,652sq.m overall, of which retail is c.7115sq.m), including revised facade treatment, including canopies and signage zones.; Reconfiguration of the ground floor layout of Block F to provide 2 supermarket units, both with off-licences (including one discount food store) (c. 3804sq.m and c. 2136sq.m respectively) with shared entrance lobby and revised retail back of house and service area layout, including ancillary accommodation in the upper floor of Block F.; A multi storey car park is proposed at first and second levels of Block F above the retail uses (the previously permitted third level is being omitted). The amended floorplate of Block F provides 448 car parking spaces over first and second level (as already permitted). The multi storey car park includes residential car parking spaces, as well as spaces associated with the supermarket units and other non-residential uses in the district centre.; Relocation of entrance to the multi storey car park to now be accessed from Adamstown Avenue to the north via a revised access ramp layout. Amendments to the access and egress to ground floor internal vehicular goods delivery from Station Road.; Revised location and reconfiguration of the back street from Adamstown Avenue, along with internal streets and public spaces arising from adjusted floorplate of Block F.; Associated amendments to landscaping and ancillary site development works, including temporary landscaping as part of reconfigured layout of street immediately to the east of Block F and provision of ESB sub station.