To construct an agricultural storage shed of 846m2 internal floor area, associated external concrete apron of 337m2 in area and all associated ancillary site works
Permission to demolish an existing house ruins and construct a single storey dwelling, appropriate waste water treatment system, proposed bored well, new entrance, conversion / change of use of existing agricultural outhouse to a domestic storage shed and all ancillary site works and landscaping
Retention Permission for the as constructed storage / collection area extension to south elevation of permitted commercial unit. Planning permission is sought for the construction of (a) extension consisting of a covered loading area to the north elevation of existing commercial unit, (b) extension consisting of covered loading area to the east elevation existing commercial unit (c) all associated site development works
Alterations to existing light industrial and associated office space unit as granted under Pl Ref. 04/897, to carry out internal changes comprising of a first floor area and full planning permission to carry out elevation alterations to accommodate same
Permission for the construction of a four-bedroom, single storey residential dwelling, including roof lights; and a detached single storey domestic garage. Other works as part of the development include: EN certified wastewater treatment system and associated EPA compliant soil polishing filter; soakways; bore well; new vehicular entrance; landscaping; boundary treatment; and all associated works to facilitate the development.
The construction of a dormer dwelling house, garage, new site entrance and connection to public services
Retention permission is sought for the as-built pitched roof to the rear of dwelling
Is sought for (a) as-built modifications to front elevation and extended kitchen area to dwelling (b) as-built modifications to domestic garage which includes 1st floor storage area and all associated ancillary works (previously granted permission PL07/400)
The construction of a commercial/light industrial portal frame structure with ancillary office accommodation, replacement of existing site entrance, new entrances and perimeter boundary treatments including new subdivision boundary, additional parking facilities, and associated services and site works
Works to existing dwelling house including, partial demolition and single storey extension, upgrade of existing sewerage system to EPA CoP criteria, together with all associated site works
Permission for development for a part single storey / part two storey dwelling, waste water treatment system and percolation area, new vehicular entrance and all associated site works
The construction of a Single Storey Dwelling, wastewater treatment system, a bored well, splayed entrance and all associated site development works
Permission for the construction of an Agricultural machinery shed, connection to services and all associated site works.
Permission for the construction of a two storey dwelling, garage, septic tank and percolation area, bored well, splayed entrance and all associated site development works
Retention permission for a new boundary wall as constructed, permission for completion of same, permission for alterations to existing entrance to improve sightlines and all associated site works.
The construction of extension to the existing industrial unit and all ancillary site development works
The construction of shed / store used for domestic purposes and storing of vintage vehicles, and all associated site works
A 10 Year Planning Permission for a solar farm with a total area of circa 57 hectares. The solar farm will consist of solar panels on ground mounted frames, 8 no. single storey electrical inverter/transformer stations, 2 no. single storey spare parts containers, 1 no. Ring Main Unit, 3 no. weather stations, underground electrical ducting and cabling within the development site, private lands and within the L4038, L8185, R448, L3051, L3052 and L3050 public roads to connect solar farm field parcels, security fencing, CCTV, access tracks, 5 no. watercourse/drain deck crossings and 2 no. horizontal directional drill crossings (under M9 motorway and the Dublin - Waterford railway), temporary construction compounds, landscaping and all associated ancillary development and drainage works. Construction and operational access will be via 2 no. existing entrances from the R448 and L1010. Sections of the proposed underground electrical cabling will traverse the solar farms proposed under Carlow County Council References 24/60043 and 24/60205, but will not alter infrastructure proposed under these applications. The operational lifespan of the solar farm will be 40 years and planning permission is requested for this duration. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application.
Of 110kV underground electricity cabling and all associated ancillary site development works. The proposed development of the underground electricity cabling will comprise 3 No. power cable ducts, 2 No. communications ducts and 1 no. earth continuity duct of c.43 metres in length which is to be installed in an excavated trench. The cabling will extend from and connect with permitted 110kV underground electricity cabling (under An Bord Pleanála reference ABP-313139-22) on the L30535 public road to a line bay in the Kellis 220kV substation
To demolish existing single storey dwelling and remove existing septic tank and shed, and construct a replacement single storey dwelling, revisions to existing entrance, new waste treatment system and percolation area, use of on-site mains water and all associated site works
The construction of a two-storey extension to the rear of the existing dwelling; the removal of the asbestos roof on the attached garage and its replacement with a trussed roof; conversion of the garage to personal office space; associated internal modifications and alterations to external elevations, including the installation of triple-glazed windows, dormer windows on the south elevation, external insulation to all elevations, stone cladding to portions of the front façade, together with all ancillary site works and services
Construction of one single storey extension to the east side elevation and one two storey extension to the west side elevation of an existing single storey dwelling including removal of existing chimney and installation of 3 velux windows to the front and rear of existing loft space and all associated site works
For a 10 year planning permission for a solar farm and associated works, comprising (1) A solar farm which will connect to the national electricity grid on lands with a total area of circa 128 hectares, consisting of solar panels on ground mounted frames, 18 no. single storey electrical inverter/transformer stations, equipment container, underground cabling within the solar farm site and within the N80 and L-3046 public roads to connect solar farm field parcels, security fencing, satellite communications pole, CCTV, access tracks inclusive of 9 no. agricultural bridges (including 1 no. bridge over the river Burrin), temporary construction compounds, landscaping and all associated ancillary development works. (2) minor amendments to a neighbouring solar farm planning permission (Carlow County Council planning reference 20143 & An Bord Pleanala reference: 307891-20) to facilitate future grid connection and additional access tracks for the proposed development. These amendments will comprise of the removal of 1,837 sqm of solar panels, provision of additional access tracks and focused removal of hedgerows to accommodate same, and the laying of 1,788 metres of 33kV underground cabling for the purposes of the future grid connection. (3) Construction and operational access for the solar farm will be via entrances from the L-7111, L-3046 and L-3049. The operational lifespan of the solar farm will be 35 years. A Natura Impact Statement (NIS) has been prepared and will be submitted to the planning authority with the application.
Extension of duration of planning permission, granted under 06/1177, 13/296, & 18/440, housing development comprising of 198 dwellings units consisting of 178 no. 3 bedroom semi-detached two storey houses, 18 no. two storey 3 bedroom terraced houses, a 2 storey building consisting of a creche on the ground floor with 2no. 2 bedroom apartments over site entrance, foul water pumping station and all associated site works and services.
To construct a two-storey dwelling, appropriate waste water treatment system and associated percolation area, new entrance off existing laneway, bored well, 6 no. stables with associated tack and feeding room, hard standing area and all ancillary site works and landscaping
Permission for development consisting of an agricultural shed for the storage of straw. Permission is also sought to relocate a utility pole to site boundary along with all associated site
Permission for a 10 year planning permission for the development of a synchronous condenser grid support facility, which will connect to the adjoining ESB Kellistown Electricity Substation. The proposed development will have a projected life span of 50 years. At the end of life the proposed development can either be decommissioned or refurbished to extend its life. The development is to be located within a site compound c. 1 ha. It will regulate reactive power on the electricity network and will consist of the following elements: a building (c. 540 sqm. c. 10m high) to house equipment including a synchronous condenser with flywheel, lube oil skid, air compressor and pumps. Equipment to be located outside the footprint of the building but within a fenced compound will include cooling equipment (c. 160 sqm. c. 3m high) 6 No. modular containers to house electrical and control equipment (total area of c. 195 sq m c. 5m high), a step-up transformer, an auxiliary transformer, an external circuit breaker, electrical balance of plant, 1 No. firefighting water tank, above ground oil separator and collection pit c. 100m of underground cabling ducts and cable to the adjoining ESB substation, balustrade boundary fencing, security entrance gate and CCTV, all other ancillary and miscellaneous site works to include site clearance, site access, internal roads and development of areas of hard standing and lay-down area. The proposed development will connect by underground cable to the Electricity Supply Board (ESB) 220kV substation adjoining the western boundary of the proposed development site. This underground cabling will not form a part of the transmission networks as defined in Section 2(1) of the Electricity Regulation Act 1999
Is sought for the construction for an agricultural entrance and associated works
To construct a dwelling house, domestic garage, waste water treatment system, percolation area, new bored well, new splayed entrance and associated site work
The following alterations to my existing dwelling consisting of, the construction of a two storey extension to the North (side) elevation, permission for construction of a single storey extension to the rear (West) elevation, construction of a front porch to the East elevation and all associated site works
The construction of a single storey extension to existing clubhouse, the demolition of existing toilets and smoking area, permission for 2no. playing pitches, associated fencing & lighting, a precast concrete ball skills wall, the construction of a machinery shed, a walking track, a proposed new car park and boundary perimeter fence. Retention permission for alterations to existing dressing rooms and all associated site works
A 10 year permission for a Battery Energy Storage system. The proposed development will comprise of the following; A Battery Energy Storage System with associated infrastructure including a new internal access road, approximately 50 metres in length to the permitted Garreenleen Solar Farm (Planning Ref. 22163); An approximately 90 metre 33kV double circuit underground cable grid connection to the permitted Bendinstown 110kV Substation (Planning Ref. ABP–313139), to be installed in an excavated trench including underground ducting; Modular office and welfare buildings; Six steel storage containers and all associated site development and reinstatement works. A Natura Impact Statement (NIS) has been prepared and is included with this planning application.
For the subdivision of an existing site, the construction of a new two storey dwelling to be accessed by exiting entrance which will become a shared entrance, conection to services, new boundary treatments and all associated site works
2 No. mobile homes used as dwellings for a period not exceeding 3 years, permission for the subdivision of an existing site, the construction of a one and a half storey type dwelling to be accessed by an existing entrance which will become a shared entrance, connection to services, new boundary treatments and all associated site works
For the demolition of an existing single storey extension to the side and rear elevation of my existing dwelling, the construction of a two storey extension to the rear elevation and all associated site works
Planning permission for a ten year planning permission for the proposed erection of 94 No. fully serviced dwelling houses, 1 No. creche and all associated site works (planning previously granted under PL. Reg. No. 04/856 & 07/93 on approx. site)
1. The change of use of our existing dwelling to be used to facilitate the expansion of our existing adjoining childcare facility, upgrading of existing septic tank & percolation area to secondary treatment system & soil polishing filter. 2. The construction of a single storey extension to the rear & side elevations of the afore mentioned childcare facility, associated carparking spaces and all associated site works at
Retention planning permission to retain indefinitely the four self-contained apartments as set out, serviced and contained within the detached two storey building
To apply for a 10 year permission for the proposed development of an underground electricity interconnector cable. The proposed development of the underground electricity interconnector cable will comprise 1 no. 33kV triple circuit cable of c.92 metres in length which is to be installed in an excavated trench including underground ducting and all associated site development and reinstatement works. The proposed development represents a minor revision to the approved layout of the solar farm previously permitted under Carlow County Council planning reference 20/143 and An Bord Pleanala Reference 307891-20 comprising the laying of underground cabling in the previously permitted grassed field area. The purpose of the proposed development is to facilitate the interconnection from the permitted solar farm to a 110kV substation which is the subject to the application to An Bord Pleanala (Reference VA01.313139) A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application.
A 5-year permission for temporary development at Bendinstown (townland) in County Carlow. The development will consist of the installation of 3 no. single storey porta cabin units for use as office (2 no.) and storage space (1 no.), 6 no. car parking spaces and all associated site development works. The proposed development will serve the Garreenleen Solar Farm Development (as permitted under Carlow County Council Reference 20/143 / An Bord Pleanála Reference ABP-307891-20). The proposed operational development will be accessed via the L7112 local road via the entrance permitted under An Bord Pleanála Reference ABP-313139-22
The construction of a 287m3 bovine slatted underground slurry storage tank connecting to an existing slurry tank with agitation points, a 229m3 dairy washings underground storage tank and a 1.8m high mass concrete wall along the length of the dairy washings tank separating the farmyard and the dwelling house. New concrete yard and low gradient concrete steps to tank level from cow lane. Construction of a 16.7m3 additional effluent tank to accommodate construction of a 540m2 silage pad with perimeter effluent drains. The demolition of an existing 40m2 derelict rubble stone house/shed, demolition of an existing silage wall to accommodate a wider feeding passage from 3.5m to 5.5m and construction of new 1.8m high pit wall to replace demolished wall, hard and soft landscaping and all associated works to facilitate the development.
Is sought for as built dormer type extension to the rear of the dwelling including ancillary site works
PL18-296 for the restoration, part demolition and extension to the rear of an existing house, along with the installation of a new sewage treatment sewage, percolation area and all associated site and landscaping works
A domestic garage and garden shed
Permission for alterations to my existing front boundary to include the raising of the existing wall, the installation of steel railings and all associated site works
Permission for the construction of a new agricultural entrance from the public roadway onto agricultural land to comprise of a splayed access and associated fences and surface water drainage and all associated site works
The change of use of existing domestic garage for use as a granny flat ancillary to the use of the existing dwelling house including elevational alterations to same, full planning permission is sought to construct a single storey extension to the rear of same and to construct an extension linking the existing building to the existing dwelling house, all ancillary site works and services
To construct a single storey, split level dwelling while demolishing an existing single storey dwelling, upgrading existing entrance, detached garage, new waste water treatment system, percolation area, bored well, and all associated site works
Construct extension to side of dwelling house to comprise 2 no. bedrooms, bathroom, living room and extend domestic garage.
A 10 year Planning Permission for a solar farm which will connect to the national grid on lands with a total area of circa 127 hectares, consisting of solar panels on ground mounted frames, 28 No. single storey electrical inverter/transformer stations and associated equipment container, security fencing, satellite communications pole, CCTV, upgrading to existing access tracks and new access tracks, temporary construction compounds, landscaping and all associated ancillary development works. Construction and operational access will be via entrances from the L-7111 and L-7112. The operational lifespan of the solar farm will be 35 years. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application.