Planning records
Showing 401-450 of 605 public recordsThe construction of a Two-Storey Dwelling, detached garage, connection to mains sewerage and water, splayed entrance and all associated site development works.
A new single storey home office and domestic store at the existing dwelling, plus all associated site works
To extend house at Carrigbeg, Bagenalstown, Co Carlow for Ken Sweeny. The single-story extension will consist of a bedroom (to replace the existing ground floor bedroom) and a playroom
For the construction of an ESB Sub-Station and all associated works to facilitate the development
The construction of new agricultural entrance and all associated works
Is sought for the construction of an industrial unit extension to the side of existing unit and all ancillary site development works
Construction of a single storey industrial unit extension to the side of existing unit and all ancillary site development works
The development will consist of the extension of the operational lifespan of a solar farm permitted by Carlow County Council under Planning Reg. 22/118 from 35 No. years as permitted (by reason of condition No. 3 of permission Planning Reg. 22/118) to 40 No. years.
The proposed works will include a solar farm on an area of approximately 14.16 hectares, comprising photovoltaic panels on ground mounted frames, 4 no. single storey inverter/transformer stations, 1 no. single storey terminal stations, 1 no. single storey electrical switch room, 1 no. storage container, security fencing, CCTV and all associated ancillary development works. Elgin Energy Services Ltd. are applying for the proposed solar farm to have planning permission that is effective for 10 years (and an operation period of 40 years)
The construction of a single-storey extension to the side of the existing dwelling and all associated site development works
Retention planning permission for alterations to agricultural building approved on foot of planning reference 17/14, the alterations include increase in the overall building heights and length with all ancillary site works
Permission is sought for the construction of an industrial storage unit with all associated site works, constructed to rear of existing industrial unit.
The construction of (i) A new treated water storage tank, (ii) New transfer pumps and local control panel within a weather-proof enclosure, (iii) Demolition of contact tanks, (iv) Ancillary development works and (v) Associated temporary development works, including a temporary compound area for the construction period
New single-storey sunroom and two bedroom extension and all associated site works
To amend the occupancy condition (condition no. 3) attached to PL 23/195 to provide for occupancy of the house by the applicants. Including all associated site works
To retain; (A) Change of use of permitted building from approved holiday home to self-contained permanent dwelling. Also, Planning permission for (B) Proposed new site entrance and change of site boundaries from previously granted positions. Original planning reference 01/688. Including all associated site works
The construction of an outdoor classroom, including all associated site works
To construct an extension to front of dwelling along with associated site works
Retention permission for 3 Prefabricated buildings consisting of the following: Building No. 1 Use as Play therapy & Counselling unit, Building No. 2. Family Support Unit, Building No. 3. After-schools facility and all associated site works
A 48 sq. metre building used as a childcare facility
Retention permission for unauthorised works to include the construction of a concrete slab to be used as a base for a prefabricated building. 2. Permission for the installation of a prefabricated building on site to be used as an Afterschools facility, and all associated site works
The renovation of the existing two story cottage, demolition of existing side and rear extension, along with garage and the construction of new side and a two story rear extension, including all associate site and landscaping works
Planning permission is sought for the construction of an industrial storage unit with all associated site works, constructed to rear of existing industrial unit
The construction of a bay window to the front of the dwelling and all associated site works
Change of use at ground floor level from existing commercial use to residential use, external alterations to window sizes, connection to all existing on site services and all associated site works
The development will consist of the relocation and revised design of a single storey medium voltage electrical substation (previously permitted as part of a solar farm permission by Carlow County Council Planning Reg. 22/118) to provide a revised single storey 20kV substation building at a revised location within the overall permitted solar farm site. The application also seeks permission for a turning area adjacent to the proposed substation to accommodate emergency fire tender access and revisions to the permitted solar panel layout to accommodate the relocated substation and proposed turning area.
The as-built revision to the front elevation
The retention of extensions to existing semi-detached dwelling and retention of domestic garage and all associated site works
Is sought to demolish existing single storey extension as constructed to the rear of existing cottage, full planning permission is sought to construct a single storey replacement extension to the rear of same, to restore original cottage including internal alterations at ground and first floor level, all ancillary site works and services at Protected Structure RPS Ref: No: CW377 known as Rose Cottage
For works as described below to Rose Cottage which is a protected structure (RPS ref no: CW377) 1. Conservation and restoration of the original south facing cottage (Rose Cottage) and boundary walls and piers with internal modifications at ground and first floor and associated works. 2. Demolition of the adjoining 20th Century single storey extensions to the original cottage (Rose Cottage) and associated works. 3. New single storey contemporary extension to the existing cottage (Rose Cottage) and associated site works. No modifications are proposed to the exterior of the original building
The construction of an onsite wastewater treatment system, consisting of wastewater pump station, over ground rising main, sludge tank, balance tank, aerobic digester, control room and all associated site works. Retention planning permission is sought for the erection of 2 No grain silos, 2 No gas silos and 4 No Multi-Purpose Vessels with all ancillary site works
The construction of a dormer style dwelling, new entrance, bored well, domestic Garage, on site waste water treatment system & soil polishing filter and all associated works
Of existing single storey extension to the rear of existing dwelling and all associated works
For (a) the erection of 3 no. water tanks having maximum height of 12 meters above ground level. (b) the relocation of 2 no. existing grain silos and all associated site works
The installation of solar photovoltaic panels mounted to roof of existing portal frame building and all associated site works
Permission for development consisting of the construction of a proposed single storey ground floor kitchen extension to the rear and side including a first-floor bedroom extension to the side of my existing dwelling. The development includes a total extension area of 20.58m2 comprising ground floor extension of 11.82m2 and first floor extension of 8.75m2 to my existing dwelling of gross area 74.56m2 on my site area of 213.25m2. The proposed works include partial demolition of the ground floor rear wall to my kitchen, relocation of a first-floor side window, internal reconfigurations, reconfigured services, and all associated site works.
Permission for an extension to existing workshop buildings to be constructed in 2 phases
For changes to development granted under 19/117 consisting of relocation of the car wash base connected to existing services. Existing pedestrian entry gate to rear yard was retained. Other works as part of the development include: installation of an oil and amp; silt trap; landscaping; and all associated works to facilitate the development
Permission for single storey extension to the side and rear of the existing dwelling including alterations to front elevation and all associated ancillary works
Revisions to previously permitted extensions to the existing dwelling under PL21/111
(a) the change of use for part of existing portal frame building, from recreation centre to light industrial packaging / manufacturing area and visitor area. (b) External and internal alterations to include demolition of existing internal walls and alterations to roof structure and finishes. (c) The construction of an E.S.B. substation to include switch room and all ancillary development works
To construct a single storey domestic ensuite/bedroom extension to front and side of existing house and all associated site works
The addition of an entrance door to east elevation of existing dwelling and all associated site development works
For the continued use of the existing 30m high communication structure carrying antennae and dished with all associated ground-mounted equipment, within an existing 2.4m high palisade compound following on from previous LPA ref no. 10/208
The provision of internal first floor office space including the addition of first floor windows to the north and west elevations and all associated ancillary works
Construction of an agricultural building of 625m2 in area (Machinery and fodder storage) concrete aprons and all associated site works
The addition of a mobility impaired access structure (MIAS) that will be within the curtilage of 4 no. Protected Structures (RPS Reference Nos.: CW53, CW323, CW325, and CW326). The structure is a hybrid assembly of different concrete and steel elements including a pair of staircases (two flights each), free standing lift shafts, support portals, electrical services and a walkway. Associated works will include the relocation of approximately 25 no. existing car parking bays by 0.5m to accommodate the widening of the existing pedestrian access path to 1.8m, widening of existing platforms to accommodate the MIAS, a proposed platform end ramp on Platform 2 and all other ancillary works to facilitate the development
The construction of a portal frame storage unit with the installation of solar photovoltaic panels mounted to roof of same, with all associated ancillary site development works
Permission for the single storey extension to the side and rear of the existing dwelling including alterations to front elevation and all associated ancillary works
Permission for development consisting of a single storey extension to side of existing dwelling along with all associated site works