Unauthorised development, including the construction of a commercial building, 2. No. domestic sheds/stores, 2. No. metal shipping containers used for storage of goods for a charitable organisation, and all associated site works
Permission for the demolition of an existing single storey extension to the rear elevation of existing dwelling, permission for the construction of a storey and a half type extension to the rear of existing dwelling, permission for the construction of a domestic shed/garage, and all associated site works
Retention planning permission for the as-built single storey sunroom to the (southern) side of existing dwelling and all associated site works
Permission for a 10 year planning permission for the development of a synchronous condenser grid support facility, which will connect to the adjoining ESB Kellistown Electricity Substation. The proposed development will have a projected life span of 50 years. At the end of life the proposed development can either be decommissioned or refurbished to extend its life. The development is to be located within a site compound c. 1 ha. It will regulate reactive power on the electricity network and will consist of the following elements: a building (c. 540 sqm. c. 10m high) to house equipment including a synchronous condenser with flywheel, lube oil skid, air compressor and pumps. Equipment to be located outside the footprint of the building but within a fenced compound will include cooling equipment (c. 160 sqm. c. 3m high) 6 No. modular containers to house electrical and control equipment (total area of c. 195 sq m c. 5m high), a step-up transformer, an auxiliary transformer, an external circuit breaker, electrical balance of plant, 1 No. firefighting water tank, above ground oil separator and collection pit c. 100m of underground cabling ducts and cable to the adjoining ESB substation, balustrade boundary fencing, security entrance gate and CCTV, all other ancillary and miscellaneous site works to include site clearance, site access, internal roads and development of areas of hard standing and lay-down area. The proposed development will connect by underground cable to the Electricity Supply Board (ESB) 220kV substation adjoining the western boundary of the proposed development site. This underground cabling will not form a part of the transmission networks as defined in Section 2(1) of the Electricity Regulation Act 1999
Permission to retain conservatory as constructed to the side of existing dwelling house, all ancillary site works and services.
Works to existing dwelling house including, partial demolition and single storey extension, upgrade of existing sewerage system to EPA CoP criteria, together with all associated site works
10 Year permission for development consisting of the construction of a Solar PV development comprising photovoltaic panels laid out in arrays over a total development site area will be ca. 65.6 ha, the construction of a 38kV substation (ca 114.4m2 x 4.75 tall) a transformer unit (ca. 18m2 x 4m tall) and associated bund (ca. 55m2), along with ancillary development including; 24 no. Power Hubs (ca. 15.25m2 x 2.4m) which incorporate an inverter and a transformer, 1 no. single storey communications building (11.1m2 x 2.5m), 1 no. single storey client side sub-station building (15.25m2 x 2.9m), 1 no. single storey equipment storage building (7.5m2 x 2.7m), 10 no. CCTV cameras mounted on 4m high poles, perimeter security fencing, site access, site egress and all ancillary works. Permission currently exists for a PV development on part of the site (Planning Permission Ref No. 16325). An Natura Impact Statement will accompany the planning application.
Construct a single storey extension to the side of existing single storey dwelling, demolition of existing sun room to the rear and existing detached garage, new percolation area and waste water treatment system, use of existing on site services, use of existing entrance and all associated site works at Orchard, Leighlinbridge, Co. Carlow. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development and is submitted with the Application
To construct a single storey extension to the side of existing single storey dwelling, demolition of existing garage, new percolation area and waste water treatment system, use of existing on site services, use of existing entrance and all associated site works
To construct a two storey dwelling, detached single storey double garage, upgrading of existing entrance, bored well, waste water treatment system, percolation area and all associated site works
To construct a part single storey, part two storey dwelling, detached single storey double garage, new entrance off existing laneway, bored well, waste water treatment system, percolation area and all associated site works
A single storied dwelling, garage, new entrance/driveway, effluent disposal system to comply with current EPA code of practice, provision of a well and associated site works
10-year permission. The development will consist of the construction of (i) a Solar PV development comprising photovoltaic panels laid out in arrays over a total development site area of ca. 91.2ha, (ii) the construction of a 38kV substation building ((6.1m (h) x 20.9 (l) and 7.3 (w)) and associated compound area, a transformer unit (ca. 6m x ca. 3.6m) and associated bund, (iii) 352 number Battery Energy Storage System units comprising 22 modules (ca. 21.9m x ca.5.2m) each with 16 number cabinet units within each module and (iv) all ancillary development including 15 number transformer integrated units (ca. 10.5m x ca.2.7m), 12 number inverter units (ca. 6.0m x ca.2.4m), 7 number CCTV cameras mounted on 4m high poles, a 3m high acoustic barrier, with berm and fencing, perimeter security fencing, site access, site egress and all ancillary works and services. The development will have a 40-year operational lifetime. Permission currently exists for a PV development on ca/65.6ha of the site (Planning Permission Ref No. 21/23) that will be superseded by this application if approved
To construct a two-storey dwelling, appropriate waste water treatment system and associated percolation area, new entrance off existing laneway, bored well, 6 no. stables with associated tack and feeding room, hard standing area and all ancillary site works and landscaping
For a 10 year planning permission for a solar farm and associated works, comprising (1) A solar farm which will connect to the national electricity grid on lands with a total area of circa 128 hectares, consisting of solar panels on ground mounted frames, 18 no. single storey electrical inverter/transformer stations, equipment container, underground cabling within the solar farm site and within the N80 and L-3046 public roads to connect solar farm field parcels, security fencing, satellite communications pole, CCTV, access tracks inclusive of 9 no. agricultural bridges (including 1 no. bridge over the river Burrin), temporary construction compounds, landscaping and all associated ancillary development works. (2) minor amendments to a neighbouring solar farm planning permission (Carlow County Council planning reference 20143 & An Bord Pleanala reference: 307891-20) to facilitate future grid connection and additional access tracks for the proposed development. These amendments will comprise of the removal of 1,837 sqm of solar panels, provision of additional access tracks and focused removal of hedgerows to accommodate same, and the laying of 1,788 metres of 33kV underground cabling for the purposes of the future grid connection. (3) Construction and operational access for the solar farm will be via entrances from the L-7111, L-3046 and L-3049. The operational lifespan of the solar farm will be 35 years. A Natura Impact Statement (NIS) has been prepared and will be submitted to the planning authority with the application.
Construct a part dormer style, part single storey dwelling, approriate waste water treatment system, proposed bored well, new entrance, domestic storage shed and all ancillary site works and landscaping
PL18-296 for the restoration, part demolition and extension to the rear of an existing house, along with the installation of a new sewage treatment sewage, percolation area and all associated site and landscaping works
The modifications, building upgrade and change of use of 2 no. existing stonebuilt agricultural outbuildings to provide tourist accommodation units to include 1 no. 1 bedroom unit and 4 no.2 bedroom units. The development will be accessed via existing entrance and the development will include the provision of a wastewater treatment system, associated soil polishing filter system and associated siteworks
(a) Retention Planning Permission to retain adjoining warehousing units 01 and 02 with combined floor area of 780m ² (presently used for storage of potatoes) and, (b) Planning permission for a change of use from existing warehousing use of storing potatoes to a maturation warehouse to store whiskey casks. (c) Proposed raising of roof profile height to warehousing unit 01 and minor alteration to both units, (d) Proposed 2 no. water storage tanks, (e) Proposed lagoon with associated perimeter fencing and landscaping, and all ancillary site works.
To erect an agricultural machinery storage shed and all associated site works
Permission for the proposed construction of an 8 bay cubicle cow housing agricultural building, to an approximate building height of 7.285m, and all associated ground works
Permission for new private dwelling with detached garage, private well, wastewater treatment unit and percolation area, new entrance and all associated site works
Permission is sought for the construction of a dormer style dwelling, garage, wastewater treatment system & polishing filter, bored well, new splayed entrance and all associated site works.
To construct a single storey extension to the front and side of existing part single storey, part two storey dwelling, relocation of existing entrance, upgrade of existing percolation area and all associated site works
The construction single storey extension to rear elevation of existing dwelling, also permission for the construction a new single story extension to the side elevation of existing dwelling and all associated site works
Permission for development consisting of an agricultural shed for the storage of straw. Permission is also sought to relocate a utility pole to site boundary along with all associated site
A 10 year permission for a Battery Energy Storage system. The proposed development will comprise of the following; A Battery Energy Storage System with associated infrastructure including a new internal access road, approximately 50 metres in length to the permitted Garreenleen Solar Farm (Planning Ref. 22163); An approximately 90 metre 33kV double circuit underground cable grid connection to the permitted Bendinstown 110kV Substation (Planning Ref. ABP–313139), to be installed in an excavated trench including underground ducting; Modular office and welfare buildings; Six steel storage containers and all associated site development and reinstatement works. A Natura Impact Statement (NIS) has been prepared and is included with this planning application.
Development of an extension to existing roofed silage pit, concrete yards and ancillary works.
To apply for a 10 year permission for the proposed development of an underground electricity interconnector cable. The proposed development of the underground electricity interconnector cable will comprise 1 no. 33kV triple circuit cable of c.92 metres in length which is to be installed in an excavated trench including underground ducting and all associated site development and reinstatement works. The proposed development represents a minor revision to the approved layout of the solar farm previously permitted under Carlow County Council planning reference 20/143 and An Bord Pleanala Reference 307891-20 comprising the laying of underground cabling in the previously permitted grassed field area. The purpose of the proposed development is to facilitate the interconnection from the permitted solar farm to a 110kV substation which is the subject to the application to An Bord Pleanala (Reference VA01.313139) A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application.
A 5-year permission for temporary development at Bendinstown (townland) in County Carlow. The development will consist of the installation of 3 no. single storey porta cabin units for use as office (2 no.) and storage space (1 no.), 6 no. car parking spaces and all associated site development works. The proposed development will serve the Garreenleen Solar Farm Development (as permitted under Carlow County Council Reference 20/143 / An Bord Pleanála Reference ABP-307891-20). The proposed operational development will be accessed via the L7112 local road via the entrance permitted under An Bord Pleanála Reference ABP-313139-22
To construct (i) Milking parlour incorporating dairy, plant, storage, External Milk Tank, Meal Bin, Rain Water storage tanks, holding yard with crush/ drafting yard, underground effluent tank with flow channel (ii) cubicle shed with underground effluent tanks (iii) loose shed and all associated site works. Permission for retention of (i) Cubicle shed with underground effluent tanks (ii) Slatted feeding area with underground effluent tanks
The construction of a single storey dwelling, domestic garage, new entrance, bored well, septic tank & percolation area, and all associated site works
To construct a single storey dwelling, garage, septic tank, percolation area, bored well, new domestic splayed entrance and driveway and all associated site development works
Permission to construct a dwelling house with services, domestic garage and all associated site works
For the construction of a bungalow dwelling, domestic garage, wastewater treatment system, bored well, new splayed entrance and all associated site development works
To renovate & extend existing dwelling-house, construct domestic garage, new entrance, install a wastewater treatment system, and all ancillary works
A 10 year Planning Permission for a solar farm which will connect to the national grid on lands with a total area of circa 127 hectares, consisting of solar panels on ground mounted frames, 28 No. single storey electrical inverter/transformer stations and associated equipment container, security fencing, satellite communications pole, CCTV, upgrading to existing access tracks and new access tracks, temporary construction compounds, landscaping and all associated ancillary development works. Construction and operational access will be via entrances from the L-7111 and L-7112. The operational lifespan of the solar farm will be 35 years. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application.
A single storey link between two existing domestic buildings - the link consisting of a hall and sun lounge
Alterations to previously approved planning reference 25/60008 (single storey extension to provide additional accommodation to our existing Childcare Facility). The alterations consist of a revised extension layout to include revised elevations, reduced extension floor area, internal alterations to the existing building and all associated site works
Development for a single storey extension to provide additional accommodation to existing Childcare Facility and all associated site works
Permission for development consisting of alterations to a previously permitted wind farm development (Planning Register References: Carlow County Council 11/154; An Bord Pleanala PL 01.240245) The proposed alteration will consist of increasing the maximum turbine blade diameter of the permitted turbines from 93m up to a maximum of 120m, while maintaining the overall tip height of the permitted development; increasing the size of crane hardstanding area at 4 turbines to 30m x 62.5m; felling of up to an additional 6.3 hectares of onsite forestry to accommodate the proposed increased turbine blade diameter in addition to the permitted felling; and an extension of the operational lifetime of the permitted wind farm development from 25 years to 30 years. The application is accompanied by a Planning Report, Environmental Impact Assessment Report and Natura Impact Statement.
Permission for the construction of a split-level style dwelling, detached garage, septic tank and percolation area, bored well, splayed entrance and all associated site development works
A garage and concrete apron
Permission to construct a storey and a half style dwelling house, domestic garage, new site entrance, bored well, septic tank and associated percolation area, all ancillary site works and services
A single-room dog grooming studio in the yard behind the existing dwelling house, a sign at the existing site entrance and associated site works.
For the installation of approximately 4.6 kilometres (km) of underground cables within the Carlow County Council (CCC) boundary and approximately 2.0 km within the Laois County Council (LCC) boundary with a voltage of up to 38 kilovolts and associated works, including a new substation within LCC, for the connection of the consented Bilboa Wind Farm (Planning Register References: Carlow County Council 11/154; An Bord Pleanala PL 01.240245) to the national electricity grid; upgrading of an existing forestry track within CCC; construction of two new onsite access tracks within CCC; re-orientation and increasing in size of a crane hardstanding within CCC; and road strengthening and widening along an updated turbine delivery route, within LCC, pursuant to the consented Bilboa Wind Farm (Planning Register References; Carlow County Council 11/154; An Bord Pleanala PL 01.240245). The application is accompanied by a Planning Report, Environmental Impact Assessment Report and Natura Impact Statement.
Construct a single storey dwelling, single storey garage, new entrance, septic tank and percolation area, connection to mains water and all associated site works
A temporary community training facility for a period of 5 years to include training pitches, parking facilities, new site entrance and exit system. Temporary portacabin type structures to provide, canteen, changing, w.c. facilities, referee and storage rooms. A self contained waste water treatment system, plus all associated site works and site enclosures to facilitate the development
For a single storey / part storey & half dwelling, septic tank and percolation area, new vehicular entrance, bored well and all associated site works
The construction of a new two storey dwelling house, connected 'Granny flat', double garage, septic tank with percolation area, the reconstruction of existing site entrance and all associated ancillary works