The proposed development will consist of an amendment to approved file Reg Ref. FW21A/0026 to remove condition 10 that limits the use of the facility by public or other commercial agencies.
Permission to construct a compressed natural gas dispensing facility with dispensing pump, island and canopy, compressor room, store and cooler room, new pavement layout, external lighting and 2 no. recycling truck-washes and 2 no. vehicular entrances and boundary treatments. AI received 12/07/21
Construct a compressed natural gas dispensing facility with dispensing pump, island and canopy, compressor room, new pavement layout, external lighting and 2 no recycling truck-washes and 2 no. new vehicular entrances and boundary treatments.
Site of c.0.615 in the townland of Grange. the site is bounded by Cappagh Road to the south; an access road from Millennium Business Park to the west and the wider Kilsaran facility to the north and east. The proposed development will consist of amendments to a permitted office/staff-welfare building approved under FCC Reg. Ref. FW18A/0087. The proposed amendments consist of the increase in size of the overall building floor area by 31.5sq.m resulting in a total gross floor area of 622.5sq.m; revisions to elevations and facade treatment; provision of solar PV panels at roof level; and amendments to surrounding hard and soft landscaping. No changes are proposed to the permitted site access, parking provision or drainage arrangement.
The development will consist of Installation of roof mounted solar panels over 2 no. existing transfer/recycling waste buildings. The proposed development relates to an activity covered by an existing Waste Licence No. WO26 1-02 issued by the Environmental Protection Agency. Add Info received 19th January 2021.
Installing 222.4m² (44.88kW) of PV solar panels onto the western slope of the existing warehouse roof cladding.
Planning permission is sought for: - Removal of 22 parking spaces to accommodate the proposed development. - Provision of a Battery Energy Storage System (BESS) compound with a total area of c. 553.8 sq.m. comprising four containerised battery units and one electrical transformer. The self-contained battery units will have a maximum height of c. 3 m and will be c. 8.8 m in length and c. 1.65 m in width. The transformer will have a maximum height of c. 3.25 m and will be c. 4.75 m in length and c. 4 m in width. - The proposed battery compound will be enclosed with security fencing to a maximum height of 2.7m with entrance gates along the southern boundary and western boundary. - All associated development including electrical connections, landscaping and planting, boundary treatments, CCTV, lighting, and all associated ancillary works.
Kilsaran Concrete Unlimited Company intend to apply for permission for development and retention permission for development at an existing concrete batching facility at Kilsaran, Millennium Business Park, Cappagh Road, Dublin 11, D11 R2HE. The proposed development amends Fingal County Council Reg. Ref FW18A/0087 (as extended by Reg. Ref. FW18A/0087/E1), which was subsequently amended by Reg. Ref. FW21A/0032. The development permitted has commenced and is in the process of being implemented. The development for which retention permission is sought consists of modifications to the permitted development as implemented on-site, described as follows: • Covered aggregate triple storage bay that replaces 3 no. previously permitted aggregate storage bays; • Amended design and layout of concrete batching plant (and ancillary, related plant) and concrete reclaimer; • Revised location of 2 no. weighbridges. The weighbridges to be retained do not have cabins; • Amended truck parking layout and an increase in truck parking by 5 no. spaces; • Reduced size of water tank and provision of associated plant and plantroom not previously permitted; • Larger ESB switchroom of c.55.5 sq.m in revised location. The previously permitted ESB substation to be retained as a storage unit; • With associated amendments to be retained to the permitted concrete pavement and tarmac areas, refuelling area, lighting, boundaries and landscape details. The development for which permission is sought consists of amendments to the permitted development comprising: • The relocation and amended design of a previously permitted office. The office has been reduced in size by c. 395.5 sq.m; • The removal of existing storage containers to facilitate an extension of c.191 sq.m to an existing workshop building; • Revised location of a wheelwash; • Alterations to the permitted car park layout and a reduction in car parking from 62 no. spaces to 40 no. spaces including for 2 no. disabled and 5 no. EV parking spaces; • The relocation of a permitted bicycle shelter and an increase in bicycle parking from 10 no. spaces to 20 no. spaces; • The provision of 5 no. e-bike spaces and 5 no. motorcycle spaces; • Amendments to permitted lighting, hard and soft landscaping and boundaries; • All other associated site excavation, infrastructural and site development works above and below ground.
Permission and Retention Permission for proposed development consisting of: 1. Cricket oval (156 m diameter field of play), permanent fixed seating for 4,240 spectators with access from the northeast and southwest, and perimeter fencing. 2. Two storey (12 m high) main pavilion building (4,477 sqm) comprising High Performance Centre (HPC) including 4 lane indoor cricket hall with viewing gallery, hall storage, fitness suite, medical and consulting rooms and HPC offices; Player and Match Official Area (PMOA) comprising 4 no. team changing suites, internal and external viewing areas over the oval, team analysis area, physio room, players and coaches changing facilities and utility room, changing and support accommodation for officials, team and official dining room, and anti-doping suite; and foyer, admin staff area, staff room, toilets, and venue control room. 3. Cricket oval floodlighting via 6 no. columns of maximum height 60 m approximately. 4. The provision of spectator concourse and service zone/route immediately around the cricket oval seating; 2 no. moveable sightscreen frames; maintenance facility; and 2 no. toilet blocks. 5. Arrivals plaza including the provision of 31 no. car parking spaces (including 2 no. EV spaces and 7 no. accessible spaces and 1 no. shared EV/accessible space) and 15 no. bicycle parking spaces for day-to-day and non-event/match day use. 6. Provision to the north of the proposed access road of a permanent cricket facility energy centre, provision of a media/outside broadcasting zone for all event/match days; and (a) provision of 150 no. car parking spaces (of which 15 no. are for permanent use and 135 no. for event/match use up to 4,240 attendance, of which there are 18 no. EV spaces and 2 no. accessible spaces and 1 no. shared EV/accessible space) and 184 no. bicycle parking spaces; (b) provision of an event/match overlay area to accommodate a further 170 no. car parking spaces and further bicycle parking spaces for attendances in excess of 4,240 spectators. 7. Provision of serviced overlay areas to accommodate up to a further approximately 7,760 non-permanent seats required on an occasional basis (to bring the total occasional capacity to 12,000 seats) and for concessions, food and beverage, corporate activities, spectators’ activation zones for use only on match/event days, and provision of permanent utilities and services in the form of water, electricity and waste water. 8. Provision of new outdoor grass surface practice nets providing 16 strips, and retention permission of existing access, landscaping and 26 no. car parking spaces at the existing nets for use on a permanent basis. 9. New access road with new entrance incorporating totem signage, pedestrian crossing, carriageway, cycle lanes, footpaths, bus turning area, bus/taxi drop off area, bus lane reservation, upgrade to 2 no. existing pedestrian and bicycle crossings and junction improvements on Ballycoolin Road. 10. 8 no. bus/coach stops, bus and coach turning area/terminus, 30 no. bicycle parking spaces, upgrade and modification to existing vehicular roads, and widening and resurfacing of existing footpaths/cycleways, new gated pedestrian/cycle entrance to the south of the campus, provision of new cycle routes and footpaths promoting active travel into and within the campus. 11. Provision of temporary haul road to facilitate the construction of strategic drainage infrastructure. 12. Temporary provision of a construction compound for the proposed scheme north of the proposed access road prior to completion of the proposed development. 13. Reprofiling of land, extensive landscaping, necessary services and infrastructure, diversion and undergrounding of existing overhead power lines, 2 no. substation kiosks and transformers, and all associated site works above and below ground including temporary works required to facilitate the efficient and safe ongoing operation of the campus. The planning application is accompanied by an Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS). The proposed development is located within the historic estate and attendant grounds of Abbotstown House which is a protected structure (RPS No. 0683), and adjacent to protected structures Abbotstown Gate Lodge (RPS No. 939), Irish Institute of Sport (RPS No. 0940) and St. Coemhin’s Church (in ruins) and Graveyard (RPS No: 0684). Additional information received 01/08/25 Significant Additional Information received 08/08/2025
The development will consist of 2 no face illuminated wall signs to replace existing, 3 no non-illuminated freestanding signs to replace existing.
Planning permission to erect an ESB Sub-Station, and switch room with associated site works. Access to the proposed ESB Sub-Station, and switch room will be from the public road in Stadium Business Park, and the decommissioning and demolition of the existing ESB Sub-Station and switch room on site.
Construction of a new 9.5 m high warehouse extension to the existing facility for the storage production processing packaging and distribution of agricultural produce complete with minor inter modifications with a ground floor extended area of 710 sq.m and associated site development and ancillary works.
Construction of a new 9.5M high Warehouse extension to the existing facility for the storage production processing packaging and distribution of agricultural produce complete with minor internal modifications with a ground floor extended area of 982 sq.m, and associated site works. AI Rcvd 3/5/24
Permission for amendments to previously approved Grant of Permission ( Reg. FW19A/0147) at Keppel, Unit B10 IDA Business Park, Ballycoolin, Dublin 15 YN9K. The development consists of: a) a 59 sq.m extension to data hall within partial volume of previously approved external compound to provide for new loading bay to the western section of the compound, b) associated external roller shutter door and external sheltered levelling dock, c) minor changes to the compound elevations as a result of aforementioned amendments, and d) Relocation of proposed storm water swale from east side of proposed compound to west of the proposed compound. No additional generators or air handling units are proposed as part of the application.
Permission for development to consist of the erection of a new ESB Sub-Station, adjoining switch room and associated site development works to include the alteration of existing fence to accommodate the new substation.
The development will consist of proposed alterations to the existing glazed curtain wall to include the proposed relocation of the existing entrance door and the provision of a new external green roof canopy on the North elevation of the existing building, with all associated external works to facilitate the development.
For amendedments to previously approved Grant of Permission (Reg Ref FW19A/0147 ) at Keppel Unit B10 Business Park, Ballycoolin Dublin 15 YN9K. The development consists of the enlargement of external mechanical compound to the Eastern elevation to accomodate reconfiguaration of previously approved mechanical plant and minor changes to the compound elevations as a result of aforementioned amendments. No additional generators or air handling units are proposed as part pf this application.
Provision of a generator and air handling unit compound including 4 no. stainless steel flues, all to the south-east corner (rear and side of existing building), and provision of 218 sq.m. internal mezzanine plant area within the existing structure, all required to proivde critical technical support to Data Hall 3. Additional Information Lodged on 5th Dec 2019
Starrus Eco Holdings Limited intends to apply for retention permission for development and permission for development to amend a previously permitted civic amenity / community recycling bring centre and ancillary development (Fingal County Council Reg. Ref. FW20A/0096), all on a site of c. 0.33 hectares at Cappagh Road, Dublin 11. D11 K584. The development permitted under (Fingal County Council Reg. Ref. FW20A/0096), all on a site of c. 0.33 hectares at Cappagh Road, Dublin 11, D11 K584. The development permitted under Fingal County Council Reg. Ref. FW20/0096 has commenced and is in the process of being implemented. The development for which retention permission is sought consists of modifications to the permitted development as implemented on-site, described as follows: alterations to the extent of the permitted site boundary, which includes an increase in the site boundary's size (permitted site area of c. 0.3ha to c. 0.33ha now proposed); demolition of the reception / office building (formerly dormer garage) (c. 69 sq m); omission of the permitted reception hut (C. 6.1 sq m permitted) and the provision of a new reception hut in an alternative location (c. 12.6 sq m to be retained); relocation and alterations to the permitted western boundary, and the corresponding omission of the permitted service entrance on the boundary, and the provision of a new service access point and gate providing access to the neighbouring site; relocation of permitted security barriers: omission of the permitted car parking and Electric Vehicle charging points and provision of a skip storage area; changes in permitted finished ground levels implemented across the site; and alterations to the permitted overall site layout, with associated amendments to be retained to the permitted circulation route and ramp, recycling bays, concrete pavement, drainage arrangements, lighting, boundaries and landscape details. The development for which permission is sought consists of amendments to the permitted development comprising alterations to the main access / egress point and piers (to maintain their position as they exist on-site) and the provision of a sliding gate at this access / egress point. AI Rcvd 13/10/2023
A single storey temporary modular structure extension (122m²) to the side of the Irish Institute of Sport (IIS) building (A Protected Structure), (formerly the Central Meat Control laboratory) for a period not greater than 7 years. The work will comprise: open plan/cellular office and meeting spaces (115m²); an interlink corridor (7m²) and all associated site development, hard and soft landscaping and excavation works above and below ground.
Demolish the existing house and associated works, to retain the existing dormer garage and convert it to a reception/office with storage and to construct a new civic amenity/community recycling bring centre together with a new internal road layout with recycling bays and car parking, site landscaping, new site drainage including foul sewerage with hydro-carbon interceptor and surface water treatment management facilities, new boundary treatments, external lighting and widened, altered vehicular entrance. Add Info received 19th February 2021.
(i) Retention permission is sought for an existing storage yard (3,456 sq.m); Permission is sought for the provision of a temporary (5 year) storage yard comprising 3345 sq.m. The proposed storage yard will accommodate storage requirements arising from a national services and works contract with Gas Networks Ireland. Use of the storage yard will be ceased following the completion of the project in five years. The existing palisade fencing will be removed and replaces with an extended screening security mesh fencing. A verge of landscaping will be provided between the existing footpath and the proposed fencing. Works to provide the storage yard comprise of (a) stripping topsoil and excavating of in-situ material for the existing landscaped area and placement of imported gravel material pavement layers and wearing course; and (b) provision of a new private vehicular entrance to the yard. (iii) The proposed development includes all associated site development ancillary works necessary to facilitate the development including new dropped kerbs and pedestrian footpath at the proposed yard entrance and a land drain around the perimeter. Internal road works include road markings and traffic signage.
Permission for development at a parcel of Land immediately south of Ballycoolin Road ( L3080) in the townland of Cappoge between Rosemount Business Park (north) and Premier Business Park (east) ( ITM X: 710273, y:739735) for the construction and establishment of an Electric Vehicle (EV) Bus Depot. The Proposed Development forms part of the NTA's Bus Connects programme. Spanning approximately 4 hectares within an urban industrial area south of Ballycoolin Road in Cappoge, Co. Dublin, the depot will accommodate around 176 buses. The Proposed Development will also accommodate administrative offices, maintenance facilities, electrical substation, and parking spaces. In all, the Proposed Development will consist of the following: • Administrative offices (including atrium entrance) (ground floor: 1,240m2, first floor: 1,280m2, total: 2,520m2); • Vehicle washing and cleaning building (1,120m2); • Major and minor repairs and maintenance bays/workshop/stores (ground floor: 2,250m2, first floor: 430m2, total: 2,680m2); • Gate, entrance, and security hut; • Vehicle inspection bays/hut (530m2); • Electrical substation compound (2,700m2); • Seven transformer buildings at 60m2 each; • Car parking (approximately 57 standard, three accessible bays, six for motorcycle, and six for EVs), catering to diverse transportation needed (1,700m2); • Bus parking bays (176 spaces); • Cycle parking (24m2); • Architecturally designed boundary fencing: 1.8m high fence along Ballycoolin Road and 4.5m high fencing around the remainder of the site's perimeter; • Two vehicle crossings on the eastern boundary for site access; • A separate vehicle crossing for direct ESB substation access; • Minor upgrades to the public road (eastern access road) including road grading, reshaping mounding refreshing line markings, new cycle ramps and removal of barriers; • Landscaping including native tree planning/shrubs and various amenity areas and SuDS features throughout the site; • Earthworks, construction activities and all ancillary site development works. Additional Information received 19/12/25 Clarification of Additional Information received 24/02/2026
We, Grid Beyond Limited, intend to apply for Permission for development at this site address: Keppel Data Centre, 4 Ballycoolin Rd, Ballycoolin, Dublin 15, D15AKK1. The development will consist of the installation of energy storage units at an existing datacentre facility. The energy storage will consist of 4 no. new battery storage units, 2 no. new HV power skids (PCS transformer and HV RMU), 2 no. MV transformer, new security fence of 2.4 meters height including 2 no. new internal gate entrances.
Construction of a 2 level mezzanine structure with a total gross floor area of c. 1,791 square metres for warehousing use.
Planning Permission: New front and side ornamental boundary walls. New ground floor link building to connect 14A to 14B. New ground floor building entrance, reception, corridor, and external canopy 92sqm to 14A. New toilets at ground floor of 14A 20sqm. New mezzanine at first floor of 14B 188sqm, new external Fire Escape at 14B, 9 new windows at 14B and 2 new windows at 14A. Retention Permission: Front entrance doors to 14A, Fire Escape to 14A, 4 No. mezzanines at first and second floor to 14A total area 463sqm. Offices and display area at ground floor to 14B 266.6sqm. Office/meeting area at first floor to14B 108.6sqm. Offices at second floor to 14A 43.4sqm and 2 windows to 14A And All Associated Site Works
3 No. 8.0m tall flagpoles in the front grass verge and all associated site works
Retention permission is being sought for 368.87m2 of floor space, including ground floor area (347.34m2) and first floor area (21.53m2) measuring a maximum height of 13.5m above ground level within the existing building permitted under previous Planning Permission FW13A/0053 and a 51 m long constructed boundary wall along the western boundary of the site consisting of a 2.7m high concrete wall with a 19m high palisade fence atop (total height 4.6m). Additional Information Lodged on 5th Dec 2019 Significant Additional Information Public Notices received on 19th Dec 2019 Clarification of Additional Information lodged on 25th March 2020
Stadium Business Park Investment Limited intends to apply for permission for development comprising amendments to a previously permitted development (FCC Reg. Ref. FW22A/0061) at this site, Site Nos. 12 and 13 (containing Unit Nos. 1, 2, 3, 4, and 5), Stadium Business Park, Ballycoolin Road, Dublin 11. The proposed development will consist of: minor internal amendments, alterations to elevations, and provision of PV solar panels at roof level of all 5 no. units; the removal of Automatic Opening Vents (AOVs) at Unit No. 5; provision of new pedestrian and cycle access from Ballycoolin Road; the provision of an ESB substation and switch room to the west of Unit No. 1; minor site layout changes including the part relocation of permitted car and cycle parking, and provision of new motorcycle parking, all within the southern portion of the site; hard and soft landscaping; boundary treatments; cabling and ducting; and all associated site development works above and below ground.
For a development comprising: (i) construction of 5 no. industrial / warehouse / logistics units contained within 3 no. blocks consisting of: (a) Block A, containing Unit 1 and Unit 2, warehousing / distribution / logistics units comprising 2,011.m each; (b) Block B, containing Unit 3 and 4, industrial / warehousing units comprising 1,381sq.m each; and Block C, containing Unit 5, a warehousing / distribution / logistics unit comprising 1,635sq.m. Each unit will be provided with ancillary office space and staff facilities; (ii) Creation of vehicular access point to the west of the site to provide for public access, repositioning of 2no. existing vehicular access points & the provision of 1 no. new vehicular access point, all 3no. access points to the north for servicing and deliveries; (iii) 135 no. car parking spaces (including 6 no. EV spaces and 5 no. reduced mobility spaces) and 80 no. bicycle parking spaces will serve the development; and (iv) The development will also include all associated SuDS drainage, landscaping, boundary treatments, lighting, CCTV, signage and site development works necessary to facilitate the development.
Permission for development an an existing C&D waste facility. The proposed development at the 0.75 ha site is for an increase in the rate of waste acceptance and processing at the facility up to 49,500 tonnes per annum, comprising mixed construction and demoliton (C&D) wastes. The planning application is accompanied by an Environmental Impact Assessment Report.
The development will consist of retention permission for additional offices and staff facilities created at first floor level from that previously granted permission under planning reference no F05A/0225 together with all associated site works.
Retention of a single storey portacabin for the purpose of accommodating sports support functions and erection of a concrete access ramp and associated and associated works. AI received 16/06/21
The construction of a 5 metre high, single storey plant room to enclose existing plant area and machinery with a total floor area of 100m2 to the rear on the south facing elevation of the existing building and to include all associated site works to facilitate the proposed development
The development is in the curtilage of the protected structure Abbotstown House. The development will consist of: a part two storey and part single storey office development (718m2) within the Lower Yard complex of Abbotstown House which incorporates the existing agricultural structures known as the Long Barn. The works will comprise;- The adaption and refurbishment of the existing single storey structures to provide office meeting and ancillary spaces (194m2); The construction of a two storey extension to provide office space, meeting spaces, reception and ancillary areas (524m2); illuminated external signage (20m2); The demolition of 2no modern stable buildings within the lower yard (130m2); The provision of an extension to the existing car park to provide 24no. additional spaces, bicycle parking; set down areas; and all associated site development, hard landscaping, site lighting and excavation works above and below ground. No works are proposed to the protected structure Abbotstown House as part of this development.
The development will consist of the retention and extension of the duration of the previously permitted 162m2 single storey detached prefabricated temporary office building (planning ref FW18A/0006) for an additional 7 years from the date of expiry of the prior permission; and for its use to be extended to include all office purposes associated with the National Sport Campus. No works are proposed to the protected structure Abbotstown House as part of the development.
Permission for development on a site at Ballycoolin Business Park, Ballycoolin Road, Dublin 15 comprising amendments to the development permitted under Reg. Ref.: FW19A/0089 (a ten year permission), as amended under Reg. Ref.: FW20A/0181. The application site is bound to the south west by Ballycoolin Road, to the south east by an existing estate road, to the east by an existing office development, to the west by St. Philomena's Park and St. Philomena's Court, and to the north by an existing water services depot. The proposed amendments comprise the alteration of the phasing of the development, to provide for the delivery of the entire southern data storage facility building within the first phase of the development, with the entire northern data storage facility building to form part of the second phase of development.
Permission for development comprising amendments to the development permitted under Reg Ref.: FW19A/0089, a ten-year permission. The application site is bound to the south west by Ballycoolin Road, to the south east by an existing estate road, to the east by an existing office development, to the west by St Philomena's Park and St Philomena's Court, and to the north by an existing water service depot. The proposed amendments comprise the following: (a) Amendments to the permitted site layout plan, to include the provision of an additional access point and an additional egress point from the existing estate road to the south, provision of an internal tarmac road adjacent to the eastern boundary of the site (in place of an element of previously permitted grasscrete road), relocation of bin storage area, amendment of internal road layout, and reconfiguration of permitted car parking (including omission of 12 no. car parking spaces); (b) Amendments to the two permitted data storage facilities, to include internal reconfiguration of the permitted buildings, removal of floorspace at ground, first, and second floor levels within the central administration area, and provision of additional floorspace at first floor level of the central administration area via the reduction in size of the permitted roof terrace, resulting in a total gross floor area (GFA) of 28,575 sq.m within each of the two data storage facilities (a reduction of 124 sq.m within each building); (c) Amendments to permitted stair and lift cores, including the removal of one stair core and provision of two additional lift cores in each data storage facility building; (d) Associated amendments to the external facades and building envelopes of the two data storage facilities (including an increase in parapet height of 0.68 metres to both buildings); (e) Amendments to the permitted emergency generators, transformers, emission stacks, and plant adjacent to the two data storage facilities; (f) Amendments to the permitted office / administration building including a reduction in floor area at ground and first floor level resulting in a GFA of 559 sq.m (a reduction of 1,020 sq.m), associated amendments to the external facades and building envelope of the building; (g) Amendments to the permitted underground connection to the existing substation (permitted under Reg Ref: FW16A/0159) located adjacent to an existing data storage facility on lands to the southeast of the main application site. The proposed amendments include an alteration of the development boundary of permission Reg Ref: FW19A/0089, to accommodate the alteration of this permitted underground connection; (h) Amendments to the phasing plan for the permitted development; (i) All associated amendments to hard landscaping and planting. boundary treatments and security gates, water storage tanks, bin storage, security hut, switchrooms, lighting, and all associated works including underground foul and storm water drainage network.
The development for which retention permission is sought consists of the retention of a single storey waste recovery/transfer building. The floor area of the building is 4226 sq.m and the height of the building at its highest from the finished floor level is 13.211m. The retention permission is also required for all associated site works and services.
The proposed development will consist of the addition of a new first floor window opening to match existing and a new door opening at ground level to the East (Front) building elevation. Internally, carry out works and modifications to extend the existing offices to include new staff facilities, storage room, circulation routes and a new fire escape stairwell and enclosure at ground floor level all amounting to 85sqm. Works to include for all associated ancillary site works.
Permission for the adaption and refurbishment of the existing single storey lean-to structure known as 'Cross Block Wrest' to provide office and meeting spaces (123m2),; internal interlinking with the abutting upper courtyard office development; and all associated site development, hard landscaping and excavation works above and below ground. No works are proposed to the protected structure Abbotstown House as part of the development.
Construction of a warehouse building (ground floor 540m2 and first floor 172 m2) comprising offices, welfare facilities, workshop, storage areas, parking, storm water retention pond, facility lighting, building signage and all other associated site ancillary and infrastructure works required to make the building operational. AI received 06Oct 2022
The development will consist of: A temporary single storey office development (753m2) for a period not greater than 7 years. The works will comprise a number of individually accessible office units with common toilet and welfare facilities around a central landscaped space; The provision of a permanent extension to the existing car park to provide 25no. additional spaces, 14 No. bicycle parking spaces; set down areas; and all associated site development, har/soft landscaping, site lighting and excavation works above and below ground.
For permission/retention permission
The development will consist of a prefabricated storage building, 16m x 5m x 3.3m high, providing a usable floor area of 70 sqm. A clad steel frame structure with double doors to each end of the building will be accessed via compliant steel ramp all sited within the existing yard.
The development consists of a prefabricated storage building 16m x 5m x 3.3m high providing a usuable floor area of 70sq.m. A clad steel frame structure with double doors to each end of the building will be assessed via compliant steel ramp all sited within the existing yard.
The development will consist of the installation of 482 PV panels onto the main roof of the existing building on site. Each PV panel will be 1902mm x 1133mm and will be installed parallel to the existing roof slope for minimal visual impact. Total square meter of PV panel surface on the roof will be 1043.1sqm. Additional Information submitted 16/09/2025
The proposed development will consist of the construction of an industrial development facility for the processing and distribution of fresh and used cooking oils (UCO) including ancillary offices and staff amenities, roof-mounted photovoltaic array, delivery vehicle maintenance building, external covered storage area, weighbridge, lorry wash, tank farm, fuel tanks, signage, lighting, landscaping, car/lorry/trailer parking areas, and all associated site development works. Access to the proposed development will be from the existing industrial estate road abutting the site to the west that connects to the Ballycoolin Road to the north. A Local Authority permit (Recovery Code 13) is required for the used cooking oil process. AI received 09/05/23
Construction of a distribution, washing and processing facility for fresh and used cooking oils; including offices, delivery vehicle maintenance, weightbridge, tank farm, lorry wash, external covered storage, signage, fuel tanks, ancillary accommodation and associated site works. Local Authority permits required for used cooking oil process, storage and transfer and for the collection, temporary storage and transfer of food waste (Class 10 operations, along with Disposal Code 15 & Recovery Code 13). AI received 22/6/2022 AI deemed significant ** Revised Public notices received 30/6/2022
Install 10KW of roof mounted solar panels on our unit (area of solar panels 47.7 sq.m. roof area 104.9 sq.m.) and all associate site works,