Planning records
Showing 1-50 of 32,545 public recordsThe development amends a permitted warehouse development (as granted under FCC FCC Reg. Ref. FW20A/0126), specifically lands relating to Unit No. 2. The proposed amendments will principally consist of the following modifications to permitted Warehouse Unit No. 2: The change of use of ancillary office space at first floor level (c. 264 sq m) to storage space; the addition of an internal loading platform; revised ground floor layout including the addition of an assembly room, alteration of the office layout and replacement of the marshalling office with truckers toilet (no change to permitted gross floor area at ground floor level); revised Photovoltaic Panels (PV) arrangement (reduced from 392 to 138 No. and reduced area from c. 638 sq m to c. 247 sq m); provision of 3 No. elevational signs (each measuring 5 metres x 2 metres) on the north, south and west elevations; revised parking layout including the reduction of the total number of car parking spaces from 81 No. to 80 No.; modifications to HGV yard layout including the addition of 18 No. van parking spaces in the permitted yard area; addition of a traffic island to the HGV entrance to the west; modifications to boundary treatments including addition of a gate and fencing to the fire tender access to the east; addition of a security barrier to the staff/visitor car parking entrance/exit to the west; extension of permitted cycle path and provision of a bike shelter; addition of a WEEE store; provision of a canopy over a proposed bailer and compactor zone; reorientation of the heat pump enclosure; elevational changes including reduction of precast concrete wall cladding to loading docks and the addition and repositioning of fire escape doors; and all associated development works above and below ground. Retention permission is sought for the modification of the roof design of permitted Unit No. 2 including a minor increase to parapet height from 17.02 metres to 17.07 metres.
The proposed development will consist of the following:
Development and retention permission for development at this c. 3.23 Ha. site at Newtown, Kilshane Cross, Co. Dublin. The development amends a permitted warehouse development (as granted under FCC Reg. Ref. FW20A/0126 and amended by FCC Reg. Ref. FW22A/0108). This application pertains to lands relating to Unit No. 3. The proposed amendments will principally consist of the following modifications to permitted Warehouse Unit No. 3: Modifications to the HGV entrance to the west comprising the addition of a traffic island and provision of sliding gates in lieu of permitted swing gatesi the addition of a sprin kier tank and pump room; the addition of bike shelters; the repositioning of the heat pump enclosure; and all associated development works above and below ground. Retention permission is sought for the following modifications to permitted Warehouse Unit No. 3: Revised ground floor layout including the replacement of 4 No. WC's with a first aid room and multi faith room, replacement of the staff facility and office with 'grey box' area (space that is subjectto future tenant fit-out) with associated removal of internal doors to the warehouse, and minor reduction of the length of the marshalling office (by 120mm) (no change to permitted gross floor area); modification of the roof design including minor increase of the office parapet height from 11.9 metres to 12 metres (100mm increase), minor increase ofthe warehouse parapet height from 17 metres to 17.070 metres (70mm increase), repositioned skylights and addition of access hatches and automatic open ventsi repositioned and revised elevational signage (1 No. elevational sign to be provided on the north and west elevation, each measuring 7.28 metres x 1.815 metres)j revised parking layout including the reduction of the total number of car parking spaces from 146 No. to 139 No.; modifications to boundary treatments including the addition of a gate and fencing tothe fire tender access tothe east; addition of a security barrier to the staff/visitor car parking entrance/exit to the west; addition of a cycling path; reorientation of the ESB substation and increase in size from c. 37.5 sq m to c. 63.4 sq m; elevational changes including reduction of precast concrete wall cladding, the repositionlng of fire escape doors, the repositioning of green walls and the repositioning of an external window to the west of the marshalling office; addition of fire corridors; reduction of granite paving and replacement with landscaping adjacent to the entrance to the ancillary office; and all associated development works above and below ground.
Retention Permission is sought for the following modifications to Unit No. 3: a new staff entrance with a new external canopy provided over the entrance (north elevation); ground level external plant within a new acoustic louvered enclosure; new paladin security fencing (2.4 meters high) along the eastern and southern boundaries; 2 no. external acoustic louvres on the west elevation; and all associated development works.
The development will comprise the provision of 4 No. warehouses with marshalling offices, ancillary office space, staff facilities and associated development. The buildings will have a maximum principal height of 17.070 No. metres to the top of the parapet above ground floor level and will comprise the following areas: Unit 1 will have a gross floor area of 21,578 sq.m. including a warehouse (20,252 sq.m.), marshalling office (66 sq.m.), ancillary office space (1,216 sq.m.) and plant (44 sq.m.); Unit 2 will have a gross floor area of 9,206 sq.m. including a warehouse (8,347 sq.m.), marshalling office (66 sq.m.), ancillary office space (757 sq.m.) and pant (36 sq.m.); Unit 3 will have a gross floor area of 16,525 sq.m. including a warehouse (15,478 sq.m.), ancillary office space (944 sq.m.) and plant (37 sq.m.); and Unit 4 will have a gross floor area of 7,342 sq.m. including a warehouse (6,648 sq.m.), marshalling office (66 sq.m.), ancillary office space (589 sq.m.) and plant (39 sq.m.). A gate house with a gross floor area of 14 sq.m. will be positioned to the south-west corner of the site. The development will also include the repositioning of the access from the L3125 Road to the north of the site to provide a new entrance and a second vehicular access will be provided from the R135/Elm Road to the south-west. Road upgrade works are proposed along the L3125 to the north of the site which include the partial upgrade of Kilshane Cross signalised junction to incorporate a left turning lane and upgraded signals on the L3125 Local Road eastern approach arm and the provision of cycle paths and pedestrian footpaths. There will also be internal roadways; pedestrian access; 502 No. ancillary car parking spaces; bicycle parking; HGV parking and yards; level access goods doors; hard and soft landscaping; boundary treatments; ESB substations; signage; PV panels; lighting and associated site development works above and below ground. The total gross floor area of the development is 5,763 sq.m. (including warehouse structures, gate house and ESB substations). Add Info received 24th November 2020.
The development part amends a permitted warehouse development (as granted under FCC Reg. Ref. FW20A/0126, subsequently part amended by FCC Reg. Ref. FW22A/0108 (Unit No. 2), FCC Reg. Ref. FW22A/0193 (Unit No. 3), FCC Reg. Ref. FW22A/0199 (Unit No. 4) and FCC Reg. Ref. FW22A/0206 (Unit 1), and proposed to be part amended by a live application (FCC Reg. Ref. FW22A/0318 – Unit No. 1). The proposed development amendments will principally consist of: the provision of new entrance and wayfinding signage as follows: 1 No. totem sign at the southern entrance of the development (7 metres high), 1 No. totem sign at the northern entrance of the development (7 metres high), 1 No. totem sign at the gatehouse entrance towards the south of the site (3.5 metres high), 1 No. totem sign to the south-east of Unit No. 1 (2 metres high), 1 No. totem sign to the south-west of Unit No. 2 (2 metres high), 1 No. totem sign to the north-west of Unit No. 3 (2 metres high), 1 No. totem sign to the north-east of Unit No. 4 (2 metres high), 1 No. ‘park and amenities’ information sign to the north-east of Unit No. 4 (2 metres high), and 1 No. ‘parks and amenities’ directional sign located at the southern entrance to the running track (0.89 metres high); and all associated development works above and below ground. Retention permission is sought for the following modifications: a multi-use games area (MUGA) (c. 295 sq m) to the west of Unit No. 4 with an outdoor gym area (c. 135 sq m) and a perimeter gravel walkway; a running track along the western/north-western boundary of the site; alterations to the permitted gatehouse at the southern site entrance including the reorganisation of the internal layout, minor decrease in overall width from 3.4 metres to 3.33 metres (c. 67 mm reduction), minor decrease in overall length from 5.599 metres to 5.532 metres (c. 67 mm reduction), minor increase in overall height from 3.35 metres to 3.385 metres (c. 35 mm increase), elevational changes including the addition of 4 No. aluminium feature fins to the east elevation and relocation of the pedestrian entrance door on the east elevation to accommodate the internal layout changes, and modifications to the roof design to include the provision of an aluminium brise soleil surround to the perimeter of the gatehouse; and all associated development works above and below ground.
The proposed development consists of:
MINOR AMENDMENTS TO UNIT 1 OF THE EXISTING PERMISSION REF FW20A/0126 A) 5982SQM OF ADDITIONAL WAREHOUSE FLOOR AREA WITHIN THE EXISTING BUILDING FOOTPRINT, THROUGH THE ADDITION OF TWO INTERNAL MEZZANINE LEVELS OVER PART OF THE FLOOR PLAN, AND INTERNAL WAREHOUSE OFFICE PODS. B) THE ADDITION OF THREE FREEZER CONTAINERS ANO TWO CHILLED LOBBIES ALONG WITH ASSOCIATED DOCK SHELTERS. (TOTALLING 192SQM). FIXED EXTERNALLY TO THE EXISTING LOADING DOCKS, C) THE PROVISION OF EXTERNAL MECHANICAL PLANT ELEMENTS AT GROUND LEVEL ALONG THE NORTH FACADE OF THE BUILDING, TO INCLUDE CONDENSER UNITS. AIR HANDLING UNITS WITH ASSOCIATED DUCTING, ALL WITH ASSOCIATED ENCLOSING SCREENS & PROTECTIVE BARRIERS, D) THE PROVISION OF AN ENCLOSING ACOUSTIC LOUVRED SCREEN FOR THE STANDBY GENERATOR TO THE WEST OF THE BUILDING. ALONG WITH ALL ASSOCIATED SITE WORKS. AI Received 20/02/23
Construction of a central warehouse & logistics distribution centre, with an overall GFA of c. 26,865 sq.m, including an ancillary office and welfare area of c. 1,352 sq.m. and associated standalone services buildings of c.121 sq.m on a site area of c. 5.238 Ha. The warehouse building is orientated east-west across the subject site, with a primarily rectilinear form complete with stepped ground floor office / staff entry level, located to the west. The proposed warehouse building has an overall length of c. 225 metres, with a depth of c. 126 metres and a parapet height of c. 21 meters above ground level to the North, South and East and c. 24.75 meters to the West. The proposed office has a parapet height of c. 15 meters above ground level. A sprinkler tank with associated pumphouse complete with provision for a generator compound, switch room and transformer room are located along the northern boundary of the site. A substation is proposed centrally on the southern boundary. Parking and office space are orientated towards the front / west of the site, facing the estate entrance. The proposal provides for 161 no. car parking spaces (including 8 no. accessible parking spaces and 35 EV charging spaces), 8 motorcycle spaces, accessed from the southwest of the site. A separate pedestrian and bicycle access to 50 bicycle parking spaces is located centrally on the southern boundary adjacent to the office. A service yard and loading bays are proposed to the south of the building, with a single HGV access point provided in the southeastern corner. There are 24 no. loading docks proposed along with 3 no. grade access doors. Solar panels are proposed for c. 10% of the roof area. Landscaping and screening is proposed throughout the site and along the southern boundary complete with upgrading of pedestrian and bicycle access routes complete with all associated works and services.
Permission for development and retention permission for development at this c. 3.71Ha. site at Newtown, Kilshane Cross, Co. Dublin. The development amends a permitted warehouse development (as granted under FCC Reg. Ref. FW20A}o126, subsequently part amended by FCC Reg. Ref. FW22A/0108 (Unit No. 2) and proposed to be part amended by two live applications (FCC Reg. Ref. FW22A/0193 - Unit No. 3 and FCC Reg. Ref. FW22A/0199 - Unit No. 4). The subject application pertains to lands relating to Unit No.1. The proposed amendments will principally consist of the following modifications to permitted Warehouse Unit No. 1: Revisions to the marshalling office and ancillary office layouts including the increase in size of the marshalling office from c. 65.9 sq.m m to c. 211-4 sq.m m and the increase of the first floor mezzanine plant room in the ancillary office from c. 44.25 sq.m m to c. 60.50 sq.m m (these changes will result in a decrease to the ground floor warehouse area from c.17,242.58 sq.m m to c. 17,202.8 sq.m m - no change to the total permitted gross floor area), and the replacement of office space, toilet blocks, staff facility, changing rooms and tea station with 'grey box' area (space that is subject to future tenant fit-out), with associated addition of an internal door to the staircore and to the warehouse modification of the roof design including a minor increase of the ancillary office parapet height from 11.85 metres s to 11.9 metres (50mm increase), revised PV panel layout, revisions to the roof light layout including provision of additional roof lights, provision of additional AOVs (Automatic Opening Vents), addition of roof access hatch/ladders, and amendments to the roof hip pitch; revisions to HGV entrance/exit layout to the east comprising the addition of traffic islands, bi-fold gates and fencing; reduction of HGV spaces from 21 No. to 19 No.; amendments to paving and landscaping; the addition of covered bike spaces in lieu of previously uncovered stands (no change to total spaces provided); modifications to boundary treatments including the addition of a security gate to the fire tender access to the west; addition of 2 No. sprinkler tanks (c. 56.7 sq.m m each) and a pump room (c. 72 sq.m m); revised Variable Refrigerant Flow Heat Pump compound location and layout; provision of an additional backup generator plinth slab (c. 22 sq.m m); addition of external protection bollards; elevational changes including the removal of 4 No. standard loading docks, addition of 2 No. graded access doors to loading bays, repositioning of 2 No. graded access doors, reduction of concrete facade on the eastern elevation, amended glazing arrangement, repositioning of fire escape doors, the addition of fire escape doors, and the repositioning of green walls; and all associated development works above and below ground. Retention permission is sought for the following modifications to permitted Warehouse Unit No.1: Revised ESB substation/switch room location (no change to permitted size) and the addition of a transformer room (c. 22.76 sq.m m)i provision of an acoustic soil berm and acoustic timber fencing (overall height is c. 5.010 metres) in lieu of permitted 4 metre high acoustic gabion wall; and all associated development works above and below ground.
Permission is sought for the omission of an existing temporary canopy and the erection of a new level access canopy (6.8 meters) adjacent to the existing building. Retention permission is sought for the following modifications to Unit No. 4: the removal of permitted signage panel on the north elevation; repositioning of signage panels and replacement signage on the east, south and west elevations (replacement signage: 7.28m x 1.81m); the provision of an additional sprinkler tank (c. 103 sq m); extension of the existing pump house (additional c. 20 sq m); revised boundary treatment surrounding the sprinkler tank and pump house area including replacement fencing and entrance gates; repositioned turning circle area; realignment of the running track and associated landscaping works; ground level external plant within a new acoustic louvered enclosure; 2 No. external acoustic louvres on the east elevation; and all associated development works.
IPUT plc intend to apply for permission for development at this c. 1.405 Ha.site at Newtown, Kilshane Cross, C0. Dublin. The development amends a permitted warehouse development (as granted Under Ref FW20A/0126, subsequently part amended by FCC Reg. Ref. FW22A/0108 (Unit No. 2) and proposed to be part amended by a live application (FCC Reg. Ref. FW22A/0193 - Unit No. 3). The subject application pertains to lands relating to Unit No. 4. The proposed amendments will principally consist of the following modifications to permitted Warehouse Unit No. 4: Revised ground floor and first floor layout including the reduction in size of the marshaling OTice from c. 65.9 sq m to C. 50.7 Sq m and corresponding increase to the warehouse area from c. 6,036.2 Sq m toC. 6,051.4 Sq m (no change to total permitted gross floor area); modification of the roof design Including a minor increase of the warehouse parapet height from 17.05o metres to 17.070 metres (2omm increase), a minor decrease of the ancillary office parapet height from 8.3 metres to 8.25 metres (5omm decrease), revised PV panel layout, revised roof light, revised AOV (Automatic Opening Vent) layout, and omission of roof hips; revisions to staff/visitor car parking entrance"ëexit to the east comprising the addition of a traffic island with security barriers; revisions to HGV entrance/exit layout to the east comprising the addition of a traffic island with security barrier and sliding gate; provision of yard extension to the south (c. 60.8 sq m) including additional security gates for maintenance access point; increase in electric charging spaces from 2 No. to 6 No. (no change in overall total quantum of car parking spaces permitted); addition of a cycle path and amendments to pathways and landscaping; the addition of covered bike spaces in lieu of previously uncovered stands and increase from 10 No. spaces to 11 No. spaces; revised fire tender layout; addition of a sprinkler tank (c. 88.3 sq m) and pump house (c. 30 sq m); revised Variable Refrigerant Flow Heat Pump compound location and layout; repositioning of the ESB substation and addition of a maintenance room, increasing the size from c. 24.4 sq m to c.36 sq m; revised graded access door locations; elevational changes including reduction of concrete façade on the eastern elevation, amended glazing arrangement, the repositioning of green walls, the repositioning of fire escape doors and the addition of fire escape routes; and all associated development works above and below ground.
The proposed development will consist of a Petrol Fililng Station to include (i)A forecourt area with 4no. fuel pump islands, illuminated forecourt canopy over, 4 no. 40.000 litre underground fuel stroage tanks, associated pipework and overground fill points and overground fill points & vents, hcv pump and electric car charging points and associated infrastructure, (ii) A car wash area with 2 no.car wash boys associated underground water storage tanks, drainage and plant room, (iii) On- site facilities including,car services areas, car and bicycle parking, dedicated delievery lane, loading area pedestrian routes and associated line markings. (iv) Works to R122 including relocation of existing site access, formation of new access from R122, road widening and road markings. (v) Illuminated & non- illuminated operator signage including main ID Totem sign, canopy and facade signage, (vi) An amenity building of 626 sqm gross floor area which will include a convenience shop (100 sq.m net retail area) restaurant/café area with 2 no food offerings with hot and cold meals and refreshments for sale for consumption on and off the premises, associated drive thru facility, customer seating customer Wc's back of house area with food preparation areas, ancillary office, staff welfare facilities, storage and plant areas, ancillary off licence, (vii) Esb substation, (viii) Overground LPG tanks (ix) All site drainage works including rainwater harvesting, attenuation and foul treatment system, (x) All associated site lighting, landscaping, boundary treatments and site development works. AI received 17/05/21 AI deemed Significant Revised Public Notices Received 14/06/21
Detached dormer dwelling, on-site wastewater treatment unit and percolation area, associated site works and utilising existing vehicular access serving the site.
Retention of an internal 2 storey mezzanine structure providing additional storage consisting of 114 sq.m at intermediate level and 117 sq.m at upper level.
The Proposed development will consist of a Petrol Filling Station to include: (i) A forecourt area with 4 no. fuel pump islands, illuminated forecourt canopy over, 4 no. 40,0000 litre underground fuel storage tanks, associated pipework and overground fill points and vents, HCV pump and electric car charging points and associated infrastructure, (ii) A car wash area with 2 no. car wash bays, associated underground water storage tanks, drainage and plant room, (iii) On-site facilities including, car service areas, car and bicycle parking, dedicated delivery lane, loading area, pedestrian routes and associated line markings, (iv) Works to R122 including relocation of existing site access, formation of new access from R122, road widening and road markings, (v) Illuminated and non-illuminated Operator signage including main ID Totem sign, canopy and facade signage, (vi) An amenity Building of 332.3 sq.m gross floor area which will include a convenience shop (100 sq.m net retail area), restaurant/cafe area with food offerings with hot and cold meals and refreshments for sale for consumption on and off premises, coffee barista and associated drive thru facility, customer seating, customer WCs, Back of House area with food preparation areas, (vii) ESB Substation, (vii) 6 no. EV Chargers with associated parking bays, (ix) All site drainage works including rainwater harvesting, attenuation and integrated constructed wetland providing foul treatment system, and (x) All associated site lighting, landscaping, boundary treatments and site development works. AI rcvd 25/04/2024
The proposed development will consist of plant located outside of the existing warehousing and logistics building granted under FW19A/0143; sprinkler pump house (7 x 6 x 3.6m high), sprinkler tank (8.4m high and 10m diametre), chiller (3.5m x 2.5m x 2.5m high) and oxidiser storage unit (6 x 3 x 3.4m high) in the rear service yard, and a standby generator (4.2m x 1.5m x 2.2m high) to the north of the existing warehouse, all on concrete bases. An ancillary logistics office (69sq.m) and mezzanine plant area (247sq.m) are proposed within the existing warehouse. An additional window (1.35m high x 1.12m wide) and 2 No. relocated doors are proposed along the eastern elevation of the existing building. Additional metal louvres are proposed on the north, south and east elevations.
Permission for Retention of alterations to the rear façade and marshalling yard of Industrial Logistics Warehouse. The alterations consist of the reconfiguration and relocation of permitted loading docks, and grade access doors under Register Ref. No. F16A/0128, and addition of 4 No. loading docks, a louvre grille, and associated reconfiguration of yard levels to rear of building, complete with grade access ramp, escape stair, dock surrounds, wheel guides, and ancillary site works for surface water yard drainage connection to existing site attenuation, on a site area of 0.1229 hectares.
The construction of 2 no. Single-Storey Units for industrial and/or Warehouseuse with ancillary Two-Storey offices with a gross floor area 11,157.90 square meters. The development will also include 2no. ESB substations, ancillary site development works for underground duct work, drainage and utility services, service yards, car parking, signage to the proposed units, the extension of Cedar Drive to the west, on a site area of 2.97 hectares Additional Information Lodged on 5th Dec 2019. Additional Information was deemed SIGNIFICANT on 6th December 2019. Significant Additional Information Public Notices received on 14th Jan 2020
Retention permission for as constructed agricultural dairy milk pasturising shed, & Permission to complete the development works to include, new effluent treatment system, alter existing entrances and private access road, associated car parking, signage, and all associated site works for the purposes of an Agricultural Dairy Farm Shop. AI received 20/5/2022
Permission for development consisting of the amalgamation, alteration and adjustment of previously permitted Unit 21 (Ref: F16A/0128) and Unit 22 (Ref: F17A/0664). The Development shall consist of the construction of a single storey infill between Units 21 and 22 measuring 318.3sq/m Gross Gloor Area (on a site area of 0.032 Hectares), construction of 56 additional car parking spaces (on a site area of 0.222 Hectares) to the Eastern side of Unit 22, provision for additional front elevation signage to Unit 22, complete with all associated site development works for underground duct work, drainage and utility services, on a total development site area of 0.2547 Hectares at Dublin Airport Logistics Park, St Margaret's Road, St Margaret's, Co Dublin, on behalf of Rohan Holdings Ltd.
Permission for an amendment to the original planning permission, at this site, for a gas peaking facility with 10 no. containerised gas fired generating units, with an export capacity of 20 megawatts (MV) under planning reference FW19A/0090. Amendments are proposed to the gas peaking will consist of the installation of 6 no. battery storage units with an export electricity capacity of 10-15 MV and 4 no. containerised gas fired generating units with an export electricity capacity of 10 MV, in replacement for the 10 no. containerised gas fired generating units, granted under planning reference FW19A/0090. 3 no. inverter transformers will also be added to the site, being the battery storage units. Other elements of the development will remain the same as FW19A/0090 and include an underground cabling route c 1.45km along the R135 road. 1 no. single storey electrical substation building, 1 no. customer switch entrance, security gates gear, electrical inverter/transformer station modules, concrete support structures, heating, ventilation and air conditioning units (HC/AV units), underground gas pipework and connection points, access tracks and new site entrance, security gates, perimeter security fencing, CCTV security monitoring system, landscaping works, and all associated ancillary infrastructure.
The development for which permission is sought will consist of A.) the provision of 1 No. new illuminated sign to be erected on the South facade of existing building, B.) the provision of 1 No. new illuminated sign to be erected on the West facade of existing building and C.) the provision of 7 No. new "visitor parking" signs fixed to the south facade of the existing building, together with all ancillary works.
For permission for retention of development comprising A.) a totem type sign board and base pedestal located at the main carpark entrance B.) a "delivery" sign board fixed to existing fencing at the heavy goods vehicle entrance, all situated at Cardinal House, Birch Drive, Dublin Airport, Logistics Park, St. Margaret's Road, St. Margarets, Co. Dublin, K67 V2Y4.
For planning permission for the following development at Unit 5/6 Cedar Drive, St Margarets, Coldwinters Dublin Airport Logistics Park, Co. Dublin, K67 E0C5. a) Construction of an open mezzanine floor at first floor level (587m2), b) Change of use from warehouse to office with the construction of 3no. internal office structrues with a total floor area of 121m2 to be located within the existing warehouse, c) New external single door to the north and south elevations, d) Illuminated high level external signage to the north and south elevations, and all associated siteworks.
The provision of fencing to site perimeter, new entrance gate, external sprinkler tank and associated sprinkler tank pump room, electical generator module, installation of mechanical air handling unit with associated erection of ductwork and louvered grille to external facade of main warehouse building and all ancilliary works. AI received 22/4/2022
The development will consist of 1 no. building for warehouse/logistics use, to be known as Unit 6, with a gross floor area of 9,821 sq.m. The building will measure 18.1m high (at parapet level) and have 2 storey ancillary offices. Elevational signage will be provided. The unit will form part of Phase 2 of Vantage Business Park along with Units 3, 4 and 5 (permitted under reference FW20A/0211), Phase 1 to the south consists of Unit 1 under construction and Unit 2 complete in 2019. The proposed development includes 6 no. HGV parking spaces, 82 no. car parking spaces, 58 no. cycle parking spaces, 8 no. dock levellers and 2 no. grade loading bays. All associated siteworks including diversion of existing foul rising main, boundary treatments, landscaping, service yards, internal road and footpaths, dry detention basins/swales, lighting, 1 no. free standing sign, security and access control room, signage at entrance, refuse storage, heat pumps and all associated siteworks including drainage infrastructure.
The development consists of the material change of use from warehouse space to (a) a single storey climate controlled room (2,493m2), clean room (60m2) and office (42m2) to the warehouse area, cold store rooms to the mezzanine undercroft (187m2) comprising total gross floor area of 2,782m2, (b) two large tanks, one containing water servicing the sprinkler system (8.462m high/9.3m diameter) and one containing liquid nitrogen (8.15m high/3.57m diameter) and associated sprinkler pump room (35m2) to the rear service yard area and (c) all associated site works. AI Received 24th September 2025 Significant Additional information Received 14/10/2025
The development shall consist of the construction of two single storey units (Unit 23 and 27) for Industrial and/ or Warehouse use with associated ancillary two storey offices and car parking, comprising a total gross floor area of 10,718.84 m2. Unit 23 shall measure 4,485.45 m2 complete with 50 carpark spaces and Unit 27 shall measure 6,215.89 m2 complete with 71 carpark spaces. The development will also include an ESB sub-station to Unit 27, measuring 17.5 m2, service yards, signage to the proposed units, the extension of Birch drive to the east, service access roads and all associated landscaping and ancillary site works for undeground duct work, drainage and utility services, on a site area of 2.40 hectares.
Intend to apply for permission to erect a new
Planning permission for a new solar photovoltaic solar farm at site bounded by Harristown Lane (L3151), St Margaret’s Road (R122), and South Parallel Road (R108) in the townland of Sanganhill Td, Finglas ED, Co. Dublin. The development will consist of the installation of a ground mounted solar photovoltaic (PV) array with associated development and ancillary works including inverters, modules and transformers; site cabling; 2 no. substation building; a storage container on a concrete base; an internal access road and attendant surface water drainage; the formation of a new site entrance onto South Parallel Road (R108); security boundary fencing and landscaping; and a security controlled entry gate and lighting. AI received 23/6/2022 CAI received 10/10/2022
The introduction of ancillary accomodation and office space at second floor (including partial mezzanine area) and alterations to the existing fenestration to the south and west elevations of approved planning ref (FW20A/0209).
Retention planning permission and planning permission is sought by St. Margaret’s Recycling & Transfer Centre Ltd. at St. Margaret’s Metal Recycling, Sandyhill, St. Margaret’s, Co. Dublin. Retention planning permission is sought for the permanent continuation of use of the existing waste processing and transfer facility for the bulking, transfer and recycling of metals, construction & demolition waste, bulky/skip waste, batteries, wood waste, glass, other non-biodegradable non-hazardous wastes, and an Authorised Treatment Facility for end of life vehicles, accepting up to 24,900 tonnes of waste per annum. Retention permission is also sought for the continued use of the existing buildings on site associated with the daily operations of the facility including processing shed, offices, plant room, shelter buildings etc., existing site services, boundary treatments and all ancillary site development works necessary to facilitate the development erected under and in accordance with Reg. Ref’s. F13A/0409, F11A/0443, F10A/0177, F03A/1561, F03A/1682 and F97A/0109. Planning permission is sought for new proposed stormwater attenuation storage tanks and associated stormwater treatment infrastructure to serve the existing development with permission also sought to restore part of the lands to agricultural use. The above development will require a review of the existing waste facility permit for the site and as such, a separate application will be made to the environmental section of Fingal County Council upon receipt of planning permission. Add Info received 1st October 2020. Add Info deemed Significant 7th October 2020. Revised Public Notices received 13th October 2020. Clarification of Additional Information received 16.03.21
Development shall consist of the construction of a single storey unit (Unit 26) for industrial and/or Warehouse use with ancillary two storey office with a gross floor area 5,480 square meters. The development will also include an ESB substation, service yard, associated car parking, signage to the proposed unit, the extension of the existing road Cedar Drive to the new proposed unit, service access roads, and all associated landscaping and ancillary site works for underground duct work, drainage and utility services. AI received 24/6/2022
Planning Permission for the installation of Solar PV Panels to be mounted on the rooftop of an existing warehouse building and all associated ancillary infrastructure. PV Panels will not extend above parapet line. The development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to Section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with Section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 and 2025 shall apply.
The construction of an open mezzanine floor, 596 m2 in area for storage use, with access from the existing ground floor level of the warehouse, and associated works.
Permission for (i) demolition of existing dwelling and construction of 1 no. two storey replacement dwelling. (ii) Relocation and upgrade of an existing domestic vehicular access from the existing North Road, R135 and (iii) all associated ancillary works necessary to facilitate the development including wastewater treatment system and percolation area, SUDS surface water drainage, site works, boundary treatments and landscaping.
Permission is sought to construct a two-story static simulator building with ancillary briefing rooms and store to the rear of the existing building. Additional Information Received 17/12/2025
The proposed development consists of the following: The demolition of existing dwellings (Bloomburn Cottage, Kilshane, Dublin 11, D11F1W8) and (Kilmonan Lodge, Kilshane, Dublin 11, D11 XP89) and associated garages, and shed structures, and permission for the use of the subject site (C 2.52 HA) as a storage container depot with a maximum capacity of 1,596 no. Containers, with 2no. 8.7 mt. high reefer gantries, construction of ancillary office and workshop building (c. 359 m2 GFA), construction of security hut (c. 9.5 m2 GFA), provision of 9 no. car parking spaces and 6no. bicycle spaces, provision of 9 no. truck parkingspaces and associated vehicle wash down area, new wastewater treatment system and percolation area, surface water attenuation area, hard and soft landscaping works, new boundary treatment, and vehicle entrance, 9 no. 30mt. high 7no. 10mt. high and 5 no. 6mt. high lighting columns with LED luminaries, signage to office and workshop building and all associated site works necessary to facilitate the development.
The subject site currently has planning permission for 4 no. buildings which are under construction. Units 3, 4 and 5 were granted under Reg. Ref. FW20A /0211 and Unit 6 was granted under FW22A/0068. All units are under construction with units 3, 4 and 5 substantially completed Retention permission is sought for: • Omission of green roof to offices (Units 3 & 4) • Upgrade of Marshalling Yard Oil Interceptor from Bypass to Full Retention Separator (Units 3 & 4) • Landscape works (ground profiling) to Unit 3 • Omission of 1no. grade level access door on Unit 3 North-West Elevation • 9sqm of precast concrete wall has been replaced with curtain walling on the Unit 5 Office North-West Elevation • Hall parapet heights for Units 3,4,5,6 are 235mm lower than Hall parapet heights shown on the 'Permitted including compliance' Elevations Permission is sought for: • Reduction in size of swale adjacent to Unit 3 and relocation of western swale northwards (unit 6) • Amendment of car parking layout to the Unit 4 carpark (reduced from 64 to 63) and Unit 5 (reduced from 58 to 57) • Omission of green roof to offices (units 5 and 6) • Upgrade of Marshalling Yard Oil Interceptor from Bypass to Full Retention Separator (unit 5) • The Vertical feature trims on unit 3, 4, 5 and 6 elevations are omitted • All associated site works. AI Rcvd 08/11/2024
The development will consist of
The proposed development consists of the following: The demolition of two no. existing detached dwellings (Bloomburn Cottage, Kilshane, Dublin 11, D11F1W8 and Kilmonan Lodge, Kilshane, Dublin 11, D11 XP89) and associated garages and shed structures, and permission for the use of the subject site (c. 2.52 Ha) as a storage container depot with a maximum capacity of c. 1,270 no. containers in 9 no. blocks ranging in height between 3 no. and 6 no. containers high, with 2 no. 8.7 mt. high reefer gantries, construction of ancillary single storey detached office and workshop building (c. 363 m2 GFA), construction of single storey detached prefabricated security hut (c. 9.5 m2 GFA), provision of 9 no. car parking spaces including 1 no. disabled persons car parking space and 1 no. electric vehicle charging space, 2 no. motorcycle parking spaces, 6 no. bicycle spaces and bicycle shelter and provision of 8 no. truck parking spaces, new onsite wastewater treatment system and percolation area, surface water attenuation area, hard and soft landscaping works, new boundary treatment and vehicle entrance onto L3120 Kilshane Road, 9 no. 20mt. high, 7 no. 10mt. high and 5 no. 6mt. high lighting columns with LED luminaries and all associated site works necessary to facilitate the development. The Planning Application may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy at the offices of the Planning Authority during its public opening hours. Fingal County Council, Fingal County Hall, Main Street, Swords, Fingal, Co. Dublin, K67 X8Y2 (to inspect Planning Applications on all lands). A submission or observation in relation to the Application may be made in writing to the Planning Authority on payment of a fee of €20, within the period of 5 weeks, beginning on the date of receipt by Fingal County Council of the Application, and such submissions or observations will be considered by the Planning Authority in making a decision on the application. The Planning Authority may grant permission subject to or without conditions or may refuse to grant permission.
The development will consist of storage and logistic facilities comprising yards, warehouses, workshops and ancillary offices at Plots 1, 3, 4, 5, 6, 7, and 9 and amendment to permitted development (Reg. Ref. FW19A/0101 and F18A/0139) at Plot 8 and internal road network at Dublin Inland Port. Planning permission is sought for the following development: Plot 1 (c.1.54ha) comprising a warehouse building including an ancillary office of c.2433sqm and c.10m in height with 1 no. sign on building and c.280sqm photovoltaic panels on roof and storage yard with approx. 50 no. lorry spaces. Plot 3 (c.0.87ha) comprising an office building of c.144sqm and c. 4.6m in height with 1 no. sign on building and c.60sqm photovoltaic panels on roof and storage yard with approx. 24 no. lorry spaces and approx. 205 no. car storage spaces. Plot 4 (c.2.99ha) comprising a warehouse building including workshop, store, substation and ancillary office of c.8,061sqm and c.15m in height and c.680sqm photovoltaic panels on roof and storage yard with approx. 70 no. lorry spaces and approx. 96 no. car storage spaces. Plot 5 (c.1.16ha) comprising a warehouse building including workshop and ancillary office of c.735sqm and 10.2m and an office building of c.300sqm and c.5.8m in height with 1 no. sign on building, and storage yard with approx. 28 no. lorry spaces and including vehicle washing area and fuel storage area. Plot 6 (c.0.31ha) comprising a warehouse and store building including ancillary office of c.569sqm and 10.2m in height with 1 no. sign on building and c.92sqm photovoltaic panels on roof and storage yard with approx. 7 no. lorry spaces. Plot 7 (c1.2ha) comprising a warehouse building including ancillary office of c.1,293sqm and c.10m in height with 1 no. sign on building and c.220sqm photovoltaic panels on roof and storage yard with approx. 42 no. lorry spaces. Plot 9 (c.0.47ha) comprising a warehouse building including ancillary office of c.569sqm and 10.2m in height with 1 no. sign on building and c.92sqm photovoltaic panels on roof and storage yard with c.8 no. lorry spaces. The proposed development across the 7 no. plots will also include: 134 no. car staff parking space and 112 no. bicycle parking spaces; high strength surface treatment including underground drainage, attenuation, water services and electricity infrastructure including 2 no. substations of c. 14sqm and c.26sqm respectively; 3m high wall and internal 4.5m electrified fence along the boundary of Plot 4 and 2.4m high fences along other internal plot boundaries; gated vehicle and pedestrian accesses to each plot; 3m high fencing along the external site boundaries; CCTV poles (approx. 7.5m) and new lighting (including 8 no. lighting towers (approx. 30m)); and all associated landscaping, plant, site and construction works. The application seeks to amend Plot 8 as permitted under Reg. Ref. FW19A/0101. The yard within Plot 8 will be extended to the north and east and the plot will increase in area from 3.1 to 3.5ha. The application also seeks to amend the internal road network as permitted under Reg. Ref. FW19A/0101 and Reg. Ref. FW18A/0139. The permitted (Reg. Ref. FW18A/0139) Plot 1 entrance has been moved further south and the permitted (Reg. Ref. FW18A/0139) entrance to Plot 4 to the west is now removed. The permitted (Reg. Ref. FW19A/0101) Plot 4 entrance to the east has been widened. All development to take place on a site of c. 10.4 ha. The application is for a 10 year planning permission. An Environmental Impact Assessment Report has been prepared in respect of the proposed development.
The proposed development consists of the following; The demolition of existing dwelling (Bloomburn Cottage, Kilshane, Dublin 11, D11 F1W8) and associated garage, and shed structure to the east of the existing house, and permission for the use of the subject site (c.2.07 HA) as a storage container depot with a maximum capacity of 1,734 no. containers, construction of ancillary office and workshop building (c.359 m2 GFA) construction of security hut (c.9.5 m2 GFA), provision of 9 no. car parking spaces and 6 no. bicycle spaces, provision of 6 no. truck parking spaces and associated vehicle wash down area, new wastewater treatment system and percolation area, surface water attenuation area, hard and soft landscaping works, new boundary treatment, and vehicular entrance, 10 no. 20 meter high & 3 no. 4 meter high lighting columns with LED luminaries, signage to office and workshop building and all associated site works necessary to facilitate the development.
The proposed development will consist of 1No. Electrical & Instrumentation Kiosk (24 sqm), 1 No. Packaged Boiler Unit (29.9 sqm), 1 No. Regulators Kiosk (66.12 sqm), 1 No. Fuel Gas Skid (27.88sqm), 1No. Gas Analyser kiosk (6.25 sqm), concrete bases for Temporary Pig Trap, Filters, Heat Exchangers and Meters, internal concrete road, 2.4m High AGI perimeter security fence, 3m high boundary fence and all ancillary services and associated site works.'. An Environmental Impact Assessment Report (EIAR) has been prepared with respect to the project and will be submitted with the application.
The development will consist of 3 no. buildings for industrial/warehouse/logistics use (Units 3,4 and 5) with gross floor area of 24,356sq.m. Each building will measure 18.1m high (at parapet level) and have 2 storey ancillary offices. Elevational signage will be provided. The units will form Phase 2 of the Vantage Business Park, with Phase 1 to the south (units 1 and 2) under construction. The proposed development includes 39 HGV parking spaces, 224 car parking spaces, 134 cycle parking spaces, 29 dock levellers and 7 grade loading bays. All associated site works including diversion of existing foul rising main, boundary treatments, landscaping, service yards, internal road and footpaths, swales, lighting, 3 no. free standing signs, signage at entrance, refuse storage, substation, foul pumping station, extension of foul infrastructure from Phase 1, modified vehicular entrance off the R135 (including new entrance gate and pillars) and dedicated new footpath and cycleway along the east side of the R135. Add Info received 5th March 2021. Add Info deemed Significant 9th March 2021. Revised Public Notices received 18th March 2021.
Planning permission is being sought for a development that will consist of the following; 1) The construction of a Gas Turbine Power Generation Station with an output of up to 293 Megawatts. The proposed station will consist of 1 no. Gas Turbine, 1 no. 28m high Exhaust Stack, 1 no. 2 story Admin Building (c. 680 m2), 1 no. single storey Workshop (c. 661 m2), 1 no. single storey Plant Room Building (c. 608 m2), 1 no. single storey Dew Point Heater Boiler Building (c. 52 m2), 1 no. single storey Electrical Module for Fuel Gas Area Building (c. 45 m2), 1 no. single storey Packaged Electronic Electrical Control Compartment building (PEECC) (c. 150 m2), 1 no. single storey E0Room Building (c. 227 m2), 1 no. single storey Fuel Gas Block Building (152 m2), 1 no. single storey Continuous Emission Monitoring System (CEMS) Building (c. 9 m2), 1 no. single storey Fuel Oil Treatment & Forwarding Building (c.59 m2), an Above Ground Installation (AG() area consisting of 1 no. single storey Instrument Building (c. 28.5 m2), 1 no. single storey Regulator Building (47 m2), 1 no. single store Boiler Building (c. 28 m2), and 1 no. single storey Analyser Kiosk (6 m2), 2 no. 20 m high diesel storage tanks and recessed bund area, 1 no. 17 m high Raw and Fire Fighting Water Tank, miscellaneous plant and equipment. 2) 2. The realignment of a a portion (263 m) of the Kilshane Road within the subject site boundary, including the provision of new footpaths and off0road cycle ways, together with the construction of a new roundabout linking the proposed realignment of Kilshane Road back to the existing road network to the north west of the subject site and to the proposed internal road network to serve the proposed development. 3) The construction of Entrance Gates, 1 no. single storey security office (40 m2 GFA) and a private internal road network providing for vehicular, cyclist and pedestrian access to serve the development. 4) Total provision of 20 no. Car Parking Spaces including 2 no. disabled parking spaces and 4 no. Electrical Charging Points. 5) Provision of lighting columns to serve the development and the installation of Closed-Circuit Television System (CCTV) for surveillance and security purposes. 6) Provision of 20 no. Sheltered Bicycle Parking Spaces. 7) Provision of hard and soft landscaping works, tree planting and boundary treatments. 8) Construction of a Wastewater Treatment Plant and Percolation Area together with a Surface Water Attenuation Area to serve the development. 9) All associated site works necessary to facilitate the development.
Planning permission for development at lands at
Kilshane Energy Ltd. intends to apply for planning permission for revisions to previously approved Gas Turbine Power Generation Station (Reg. Ref: FW22A/0204) at a site located at Kilshane Road, Kilshane, Finglas, Dublin 11, comprising the following amendments: 1. Revisions to previously approved administrative/warehouse building consisting of the following: (a) Revised internal layout consisting of addition of new stair core and lift at ground floor level connecting to new storage area at first floor level (428 m2 GFA), increasing the total GFA of the administrative/warehouse building from 855 m2 to 1283 m2. (b) Revised façade design to elevations including revised fenestration to south elevation, revised fenestration and door design to west elevation, revised fenestration to east elevation and provision of new external fire staircase and first floor level access door to east elevation. (c) Increase in height of administrative/warehouse building by 1 m to 7.38 m. (d) Revised colour of material finish from green to dark grey. 2. Revisions to previously approved gas turbine including revised shape of evaporative cooler, addition of servicing gantries and the slight moving of the gas turbine c. 5.57 m to the north as demonstrated on the enclosed architectural plans (Drg No. Drawing No. 25043-PL-04.1) Internal gas turbine machinery and installation as part of revised gas turbine model to be provided to later specialist design as previously approved under Reg. Ref. FW22A/0204. 3. Revised size and location of fin fan coolers within power island compound as demonstrated on enclosed architectural plans. 4. Revisions to layout of diesel storage compound to now provide 1 no. larger fuel storage tank with an increase in maximum height from 16.2 m to 20 m and an increase in diameter from 24.4 m to 49 m. 5. Revised design and location of the Packaged Electronic/Electrical Control Compartment (PEECC) within the power island compound to now comprise a single storey stilted building raised 2.6 m above ground level, accessed via 2 no. external stairs and a new servicing gantry at finished floor level, with a floor-to-ceiling height of 3.25 m and an overall height of 6 m, and an increase in GFA from 72 m² to 148.51 m² together with façade changes. 6. Revised design and location of BOP Power Distribution Centre within power island compound as demonstrated on enclosed architectural drawings including increase in GFA from 129 m2 to 160.6 m2 together with façade changes including revised fenestration to west and east elevations. 7. The addition of new Aux Equipment Block (connected to the Gas Turbine) with a GFA of 361.20 m2 and height ranging from 7.65m to 9.59m and new servicing gantries for the purposes of sheltering specialist equipment and machinery as identified on the enclosed architectural drawings. 8. The addition of a HVAC Structure within power island compound with a maximum height of 8.84 m which supports two HVAC units on the top and the Starter Transformer and Excitation Transformer below. 9. Revision to previously approved Acoustic Wall within power island compound consisting of a slight decrease in length from 107.0m to 101.6m. 10. Removal of previously approved 16.2m high x 18.3m dia Demin Water Tank and replaced with Separate Demin Water Tank to be added as a non-permanent structure rather a small cube refill tank. 11. Removal and replacement of select number of smaller equipment items as identified on the equipment identification drawings prepared by CWPA Planning & Architecture (Drawing No. 25043-PL-14). 12. Minor revision to internal road network as demonstrated on enclosed architectural drawings to accommodate proposed amendments. Additional Information Received 13/02/2026 Significant Additional Information Received 25/02/2026 Clarification of Additional Information Received 30/03/2026
The proposed development will consist of the following: